Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.

Slides:



Advertisements
Similar presentations
WHAT IS STEAM PRO? Thermoflow, Inc.
Advertisements

Surface Sr. Design Week 7. What You Should Have Distances to Mill and Leach as a Function of Depth Cycle Time Calculations for Proposed Truck Fleets.
Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
The Expanded Ledger and the Income Statement
Front End Loader Costs ©Dr. B. C. Paul 2000 Start Detailed Economic Comparison of 3 machines l Strategy Go Through Each Machine and Figure the Cost Compare.
Senior Design – Week Projects. A General Comment Team leaders need to get me team member assignments.
McGill Consulting Asif Kan Alexandre Marinho de Almeida Michael Spleit Ahmed Ragab Mine Production Scheduling of a Porphyry copper deposit February 15,
Week 9. COAL Things Missed Last Week Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year.
YOUR BALANCE SHEET By Roger Betz, Sherrill Nott, Gerald Schwab Day 1 break to 12 p.m.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Cash Flow Problems are 5 Types Invest and Earn –solve with NPV, maybe IRR or tweeked IRR or ERR All Cost Investment Alternatives –develop cash flows for.
Miss Nelson SCIENCE ~ CHAPTER 12 ENERGY AND MATERIAL RESOURCES.
YOUR BALANCE SHEET Roger Betz, Sherrill Nott, Gerald Schwab, Barbara Dartt FIRM AoE team.
STEAM PRO is a highly automated system design tool – a heat balance program specifically intended for design of steam power cycles.  Use STEAM PRO to.
Inventory Management for Independent Demand
Obtaining Raw Materials
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
By: Jose, Marlon and Trevone. Mining is important for many reasons: - Canada is third in the world for mineral production. - Canada doesn’t have a use.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
Production Planning and Control Introduction
Week 6/7 (no presentations next week due to SME).
Week 10. DIAMOND Adjust Your Underground Drawing As Needed Carefully work out your drilling, blasting and mucking cycle – Presumably you will blast at.
Step 5 Truck Fleet Costs ©Dr. B. C. Paul 2000 Revised 2008 Note – This presentation includes screen shots from the Caterpillar Performance Handbook, Catapillar’s.
Week 2 of Sr Design Diamond People Begin Building your Geologic Model – Right now your data limits you to assuming that each pipe is a single grade.
Chapter 6 Production Processes.
Doing Taxes ©2004 Dr. B. C. Paul. Example  Partly Poopers Inc (A division of Badish Petroleum) runs a private sewerage treatment facility for the town.
Calculating Stripping Ratios for Area Strip Mines Mnge 315
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
Completing the Accounting Cycle – Part II Beginning on page 156 Chapter 4 1.
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
How do you keep records? Do you engage in any personal accounting for yourself? Probably, all of you do at some level if you have a checking account, although.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Feasibility Study and Business Plan Development APPA Broadband Conference San Francisco, CA October , 2004.
Surface Mining Ore Body Geometry ©2011 Dr. B. C. Paul Note- Concepts given here are considered to be common knowledge to those involved in early stage.
Interpreting VALP Results © 2012 Dr. B. C. Paul Note – MineSight and VALP are both trademarked names belonging to Mintec Inc. These slides suggest ways.
Steps in Fleet Selection ©Dr. B. C. Paul 2000, revised 2008 Note- General steps and methodologies found in these slides roughly follow material found.
Expanded Ledgers. Providing the Information Solution What we need to do is take all the transactions from E. Boa, Capital and start putting them into.
Week 8. COAL Timing Will Be Big Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year by.
The 2009 Sr Design Project (for Coal). What is Covered Mine Plan and Layout –Methods –Equipment –Manning –Production Rate –Sequence Rock Mechanics –Orientation.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
1 The Balance Sheet Higher Grade Business Management 2009.
Process Layout Chapter 7 July 20, 2005.
Just After Spring Break Sr. Design. Coal Group For Each of Your Coal Seams Define the Boundary of the areas you believe are minable –Provide a plan view.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 2 – Contents of Reports January.
THE COST OF MANUFACTURING How much does manufacturing cost?
Open Pit Planning and Design The Standard Approach for Open Pit ©2007 Dr. B. C. Paul.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Mining Notes.
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
Easy Start 1Define the following key words: Asset, Liability, Gross profit, Net Profit, Creditor, Debtor, Cashflow, Balance sheet, Profit & loss, Expenses,
Senior Design 2009 Projects Overview. General Format Week Day 1 – Outline Work to Be Accomplished During the Week Week Day 2 – Work Day / Special Lecture.
Guidelines and Cautions for Finishing. Group and Individual Work Individual Only 40% –Oral Presentations weekly –Completion of tasks weekly Group (sort.
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Issues in Canadian Geography Mining The extraction of naturally occurring minerals from the Earth.
M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.
The 2007 Class Project ©2007 Dr. B. C. Paul. The 2007 Project A copper/moly porphyry deposit located near Eureka Utah –Ie (hard rock deposit) Deposit.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Thermal Energy Lab Core Lab 4 th 6 Weeks. What you can expect to see: Station 1 : Beaker of water on hot plate. Station 2 : Lamp with regular bulb. Station.
Cost Analysis By Rahul Jain. Topics for discussion Total Revenue and Total Cost Opportunity Cost Total and Average Fixed Costs Total and Average Variable.
Industry Industry Standard Grade Geography The Human Environment.
College Accounting A Contemporary Approach
Process Economics Factors that affect profitability
Chapter 4 The Accounting Cycle Continued
Costing and Project Evaluation
Obtaining Raw Materials
Maria’s Restaurant Chapter 3 Section 12
© 2010 The McGraw-Hill Companies, Inc. All rights reserved
Maria’s Restaurant Chapter 3 Section 12
Presentation transcript:

Week 11

DIAMOND

One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with fuel show the location and size of the fuel reserves – It is expected you will have diesel, gasoline, and aviation fuel at least

Show Your Detailed Drawings Show a plan view section of your main production and man shaft – The drawing should show size, thickness of lining materials, compartments, guides, areas for utility lines Have a drawing of your man cage Have a drawing of your supplies and materials cage Have a drawing of your skip

More Drawings Have a plan view section drawing of your two ventilation shafts – The drawings should show size, thickness of linings, and any utilities or escapeways going through them – Have a drawing of your main mine fan assembly Have a section drawing of each type of drift you will have – Examples – your ramp, the shaft bottom facilities on each level, the tunnels leading away from the shaft to the orebody footwall, your footwall access drifts, your cuts into the orebody, your ore pass Have a 3D drawing showing one of your drift and leaf entries coming off the footwall access and going into the orebody Have 3D drawings of your underground mine layout that shows your ore passes, access drifts, ramps etc.

Have Mine Operations Drawings Show a working drift of your mine in plan view – The drawing should show the size and travel path of your trucks – The drawing should have the turning and loading pattern of your loader Show your calculations of the cycle times for your equipment – Prepare your appendix on these calculations (turn it in) Remember an appendix is a mini-report that explains what you were calculating and how you calculated it. It is not just a table core dump

Have Drawing Showing the Operation of Your Ventilation System The ventilation pattern should be shown – It should include how you will split the air between two levels coming off of one shaft – Drawings should show a typical duct system going down a production entry with the fan drawing air out so as to suck fresh air into the face A drawing should provide a cross section of your duct and fan and identify the size of each Prepare the Appendix showing how you calculated your pressure drops and air volumes for sizing your main fan and the booster fans – Remember an appendix reports how you did things, not just a core dump of tables

Get Equipment Pictures Have pictures of your underground and surface production equipment and ancillary machines – You can probably get pictures from vendors brochures and the internet but – You need to add dimension information to the pictures Prepare appendices showing how you determined the number of each type of equipment that you would need – Remember you must explain how you calculated quantities, show example calculations, at least tables of calculations, and reports of results that you utilized in your main mine plan

More Appendices Prepare an appendix showing how you calculated your manning needs and how you got your salaries and fringe benefits – This appendix will likely support a summary manning table and cost in the main report

Report on How You Will Organize Your Final Report Explain the heading, subheading system you will use in your main text Explain how you will label figures and tables in your report and coordinate that labeling with your text heading structure Explain how you will name your appendices and how we will know which appendix goes with which section of the report Show the outline you anticipate using on your final report

Do Your Economics For your K2 zone – Assume one 4 caret high quality red diamond for every 600 tons of rock – Assume you will find one large high quality 10 to 15 caret red diamond every year Compile a capital cost schedule showing capital investments each year – The table should also show what the capital cost is for You will probably take your table of capital cost items that runs top to bottom and then run it left to right showing time period for each investment Be sure to add things you missed such as footings, fuel storage, and other items you find missing.

More Economics Prepare a similar table for operating expenses by year – You use a lot of contracted services so be sure to include them Now prepare a table of revenue coming in – Include money paid out in royalties – Assume your private land owners that have not already agreed to sell you their land will want 25% more royalty than the state The Autistic artisans will not sell out for any price

Combine Your Tables Produce a Cash Flow from the 3 tables Calculate the NPV, PVR, and IRR – These will not necessarily be the final numbers since it is anticipated you may have several things not finished in your tables.

And One More Thing This is the week to turn in your revised midterm report

COAL

One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with fuel show the location and size of the fuel reserves

Complete Tasks That Were Not Done the Last few Weeks Prepare a year by year Royalty and out of seam dilution schedule Run your ventilation simulations and size your fans – This will involve 3 points in time as outlined last week Present your final Belt Analyst and Slysel work

Mass Balance Your Prep Plant Trace a mass balance through your coal preparation plant – Determine the year by year tonnage of coarse and fine coal refuge (make sure water is accounted for in your mass balance) – Draw out your waste facilities Make sure their volume and capacity match the mass balance need

Planning Ahead on Prep When you go from #6 coal to Met coal you have a step up in production rate – Show how you will handle that with your coal preparation plant If you end up needing a new prep plant then use the old one to start #7 coal mining With your waste placement design show by design that you can mine the #7 coal without creating problems from your waste placement

Show Drawing Details Provide a section view with dimensions down your slope Provide a plan view across all shafts that you plan – The drawing should show shaft size, liner thickness, all compartments, etc. – Provide a drawing of any supply of man cages you may have

Report on How You Will Organize Your Final Report Explain the heading, subheading system you will use in your main text Explain how you will label figures and tables in your report and coordinate that labeling with your text heading structure Explain how you will name your appendices and how we will know which appendix goes with which section of the report Show the outline you anticipate using on your final report

Do Your Economics Compile a capital cost schedule showing capital investments each year – The table should also show what the capital cost is for You will probably take your table of capital cost items that runs top to bottom and then run it left to right showing time period for each investment Be sure to add things you missed

More Economics Prepare a similar table for operating expenses by year – Be sure to account for any contracted services Now prepare a table of revenue coming in – Include money paid out in royalties

Combine Your Tables Produce a Cash Flow from the 3 tables Calculate the NPV, PVR, and IRR – These will not necessarily be the final numbers since it is anticipated you may have several things not finished in your tables.

COPPER GOLD

Your Big Task – Sequence Your Pit Develop Stage Pits for Every 5 years of your 50 year mine life – Easy way to do is with the price fake method – low prices get progressively smaller richer pits Problem is these make thin shells of 50 feet and then jump 30 years at a time Can’t execute such a mine plan I can use it to map my best ore. – Multipit allows you to control step size

After You Sequence Your Pit Put in Your Benches and Roads Do not have a completely new road network every year. Run MSVALP to optimize your schedule and cut-off grades Run Your Economic Analysis.

Report on How You Will Organize Your Final Report Explain the heading, subheading system you will use in your main text Explain how you will label figures and tables in your report and coordinate that labeling with your text heading structure Explain how you will name your appendices and how we will know which appendix goes with which section of the report Show the outline you anticipate using on your final report