(Facility) Support - LCGT Handy Man - The definition of “Support” is now under construction. Many missing-tasks will be delivered to the support group.

Slides:



Advertisements
Similar presentations
Work Improvement in Small Enterprises (WISE): good examples from Asia [CD-ROM] [Publications] Compilation of PowerPoint presentations on: 1) Work station.
Advertisements

IN-PLACE PROTECTION. LEARNING OBJECTIVES Explain the objective of In Place Protection Identify the means of warning List the criteria in choosing room.
Chemistry safety Part 2.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Multi-Clean Patient Room Procedures Introduction The cleaning procedures for Patient Rooms are broken into 2 groups. 1.Occupied - Daily The room is occupied.
Sand Sampler User’s Manual Introduction Things to Know Before Starting your Sampler Starting and Operating Troubleshooting Maintenance.
Search and Rescue Trailer Bungay Fire Brigade 2013.
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
SETUP Chapter 6 Lead Abatement for Workers Course.
Safety in the Lab I intend to have you participate in lots of labs during this year I intend to have you participate in lots of labs during this year Many.
Obj Experiment ways to organize living space.
FACSAria The basic parts
If you use your computer more than a few hours per day, we suggest you not to turn off your computer at the end of the day. Instead turn off only the.
MONITOR’S RESPONSIBILITIES & PROCEDURES SCTX WOODWORKERS CLUB Updated November 2010.
Chinese International School Laboratory Refurbishment A case Study of laboratory design.
The Life Safety Surveyor Facility Tour
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Tornadoes A tornado is a violently rotating column of air extending from a thunderstorm to the ground  May have a transparent appearance until dust and.
The side affects of tornadoes! The side affects of tornadoes can be just a little rain or a big thunderstorm with lots of lightning.
Approved 15-minute eyewash/shower 29 CFR (c)
Marubot Football League Service Manual.
LAB SAFETY ORIENTATION
Electrical Power Systems
Developed by NFPA. Funding provided by the U.S. Department of Homeland Security, Office of Domestic Preparedness. Sparky® is a registered trademark of.
BE READY FOR EMERGENCIES The 2014 Plano Stake Preparedness Challenge.
1 Medical Equipment Safety Orientation to Laboratory Safety.
Wildfires Part 3: Safety Measures By: Hannah Fortson and Rebecca Mitchell.
MAKE SURE YOUR OWN ACTIONS REDUCE RISKS TO HEALTH AND SAFETY.
PC Maintenance: Preparing for A+ Certification Chapter 2: Safety and Preventive Maintenance.
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
Electricity! A Really Bright Idea… Mrs. Zoeller – 4 th Grade.
Micro Controlled Cabin Lights Ron Acker EKU Dept. of Technology, CEN/CET.
Introduction to a pit installation
NO KILLING PEOPLE. AKA … SAFETY IN COMM TECH HOW CAN WE NOT HURT OURSELVES, OTHERS, OR THE EQUIPMENT IN COMM TECH? (YES, THERE’S A QUIZ ON THIS STUFF.
 No Eating & Drinking  Dress safely (especially in workshop) in order to avoid unsafe act.
Preventing Silicosis in the Mining Environment. 1.Prevention of Silicosis to Improve Mine Workers Health and Quality of Life. 2. Compliance with MSHA.
Crew Quarters Lint Catcher Project Air flow sensors don’t read the correct air velocity when covered with dust. Ducting collects more dust than expected.
Safety in Floriculture “For Your Protection” Miss. Perry Lincoln High School.
2.00 Understand Computer Fundamentals
ICT and Environmental Monitoring Mr Conti ICT in Society.
LCGT Cryogenics Status Report KEK T.Suzuki.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
CO2 Scrubber Bracket The Carbon Dioxide Removal Assembly is the system that removes carbon dioxide from the Space Station atmosphere. Usually it works.
Standard Grade Technological Studies Introduction to Pneumatic systems.
Dry Storage & Battery Charging Monitoring & Control System.
9/30/ Module 4 Clean-up and Check Your Work.
We should abide by the principle of selecting low mobility with the guarantee of construction operation and placing densely. §4.3.4Selection and Classification.
Auto shop safety Safety around the shop. Safety Which characteristic is essential for the professional auto technician? Responsible attitude Knowledge.
code calculations, construction drawings
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
Tornado Disaster Preparation Presentation
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Clean policy discussion Eiichi Hirose, Kunihiko Hasegawa ICRR, the University of Tokyo Feb 22, 2016.
Safety in the Science Lab!!
COMPUTER HARDWARE SERVICING
Scroll Saw Operation and Safety
Electricity and Circuits I can describe an electrical circuit as a continuous loop of conducting materials. I can combine simple components in a series.
Creating a Clean and Hygienic Foodservice Operation
LAB PROCEDURES Let’s Eat! Mrs. Richter. DAY BEFORE LAB: Read through the recipe. Fill in Plan of Action neatly and thoroughly. Every student in class.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Lab Safety.
Performance test of KAGRA cryostat at site
North Central Florida Local Emergency Planning Committee
Performance test of KAGRA cryostat at site
INSTALLING ELECTRIC PANEL GENERATOR
North Central Florida Local Emergency Planning Committee
Safety and Mrs. Vigue’s Chemical World
Project: Wiring a Building
Presentation transcript:

(Facility) Support - LCGT Handy Man - The definition of “Support” is now under construction. Many missing-tasks will be delivered to the support group. CCD monitor deliver  Circuit? Scattered light control (IFO and Input optics)  IOP? Local sensing of mirrors’ motion  Suspension? Network Etc… Anyway, in 2010, the support group supports about mainly facility including… Clean environment construction and rule Power supply and HAM(60Hz) buster Entrance System Network LCGT f2f meeting Sept 27 Kashiwa, Chiba

How to Make Clean Environment Dry the area Keep out dust Not raise dust Not collect dust Avoid sound and vibration - Basic Policy - LCGT f2f meeting Sept 27 Kashiwa, Chiba

Humidity Control Humidity kills IFO Problems ① Water from concrete walls and floors. ② Water from side ditch. Solutions for tunnel section ① Baking after construction. But, no money and no time due to tight schedule ? ② Dry coverage only around vacuum instruments. ③ Vacuum ducts taping with sheets.(but stainless steel) ④ Duct supports should be made of stainless steel ? or steel with corrosion control. Solutions for Center, End station ① Baking. LCGT f2f meeting Sept 27 Kashiwa, Chiba

Dust Control Dust kills Optics Problems ① Dust from Outside (arm and entrance tunnels). ② Dust from walls (blowing concrete) and floors. ③ Dust from people. Solutions ① Clean and dry air generation using outside fresh air.(Sound and vibration should be small.) ② Keep a clean air flow from stations to outside. ③ Antistatic floor and wall painting, etc…. ④ Extra clean area around TM Tanks using deck structure. ⑤ Air shower system introduction and clothes policy. ⑥ Rules about instrument introduction. LCGT f2f meeting Sept 27 Kashiwa, Chiba

Vibration and Sound Control No additional vibration and sound Problems ① Clean and Dry air Generator (CDG) makes large sound and vibration. ② HEPA in the lab also makes sound and vibration. Solutions ① CDG is put as far as away from stations. ② HEPAs are turned off during operation in stations ③ Small CDG in tunnels for vacuum stuff and electronics should be enclosed in some houses. LCGT f2f meeting Sept 27 Kashiwa, Chiba

Clean Environment Ideal Plan 1 Dry and clean air generation Access Tunnel 1F1F (Side view)(Top view) クレーン 1000 Entrance Anterior room 1 2F2F Anterior room 2 Anterior room LCGT f2f meeting Sept 27 Kashiwa, Chiba

Compromised Plan 1 by Tunnel Group LCGT f2f meeting Sept 27 Kashiwa, Chiba

Power Supply Problems ① There is no ground earth in the tunnel. ② According to experience, HAM (60Hz) spoiled IFO control and data quality a lot, unless it was minimized. ③ Ground loops due to cabling often troubles. ④ How supply power line for the end station ? (from center ? or individual?) Solutions ① 6000VAC(where is it set ?)  100VAC(where?)  24VDC. ② 100VAC generation is isolated from lab area or not? If isolated, many commercial electronics should be modified. ③ 24VDC is delivered to each electronics? If so, Be careful with ground loops. ④ Ground copper bars will be set on walls in stations for ? ⑤ Never use switching regulators. ⑥ Battery is possible? LCGT f2f meeting Sept 27 Kashiwa, Chiba

Entrance and Security System Conditions and Requirements ① The LCGT entrance is completely different with that for SK. ② We should keep tabs on every worker inside the mine by ourselves. ③ We should make some rules (security, car usage, emergency contact) and do security education like SK. We should note especially security in 3km tunnel !! ④ “Emergency route”, “O2 monitor”, “fire-alarm box”, “surveillance monitors”, “air bottles”, “hand extinguisher”, etc… are required from the point of view of fire laws. ⑤ A security guard should come around. ⑥ Mobile PHS and commercial mobile phone around the entrance introduction. (We can scarcely use a mobile phone at Atotsu Entrance.) Solutions ① We should learn many things from SK group. ② Can we ask SK to extend his system and a guard security for LCGT by cost sharing ? In the worst case, we should manual entrance check. ③ Ask a commercial company to build an antenna ? LCGT f2f meeting Sept 27 Kashiwa, Chiba

Entrance and Security System LCGT f2f meeting Sept 27 Kashiwa, Chiba CLIO members and collaborators use this system.

Network Present Conditions & Requirements ① Several 1G or 10G lines for SK area are ready, but we don’t know we can use one of them that are belong to SK group. ② Some academic network is available at the Mozumi UT buildings. ③ Because we have a plan to build a house at the new entrance for LCGT, should we have an individual line from Mozumi UT buildings? ④ How distribute the network to the end stations ? Because the Y-arm end around Mozumi can be directly provided from UT building. Whereas, X-arm end should be provided from the center station? LCGT f2f meeting Sept 27 Kashiwa, Chiba