BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

The Modular Building Institute is pleased to present members of NAFIS with an opportunity to: RETHINK CONSTRUCTION.
Contents: Cover
Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
Low Cost, High Innovation Efficiency in the Built Environment Brandon Fletcher, CFA Co-Founder Green Analytics.
SUSTAINABLE SOLUTIONS IN CONCRETE INDUSTRY
C. Matsungo - Green Star Accredited Professional Capital Projects Management.
The Art of Concrete White Cement: Perspectives on Architectural Distinction.
Economic and sustainable implications of standardised components and modular assembly.
Resources in Construction / Materials. Materials for Construction No construction project can proceed satisfactorily without materials. In smaller companies.
Continuous Value Enhancement Process
By.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
Operations Management Design of Goods and Services Chapter 5
Operations Management Design of Goods and Services Chapter 5
What is a Hallmark Modular Home? A Hallmark Modular Home is designed, engineered and built in the controlled environment of a modern factory. It is computer.
A Revolutionary New Panelized Construction System Steel frame panels for each project are built in CHS’s manufacturing facility and delivered to job-site.
Frederiek Toney Executive Director, Material Planning & Logistics
A Look Ahead on Green Building Innovation. Introduction  Industrialization has been coupled with increasing harmful effects to the environment in the.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
Copyright Statement Copyright William F. Hogue, This work is the intellectual property of the author. Permission is granted for this material to.
Director's Message Suri Auto Pvt Ltd is the name made to be the best, by hard work, dedication and team spirit; the highlights that enhance our ongoing.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
1 New Product Development Presented by Precast Consulting Services Agenda 4 What’s Precast Consulting ? 4 New Product Development –New product development.
Introducing the Oman Green Building Centre 19 January 2013 City Season Hotel, Muscat Eng. Issam Mansour Chairman.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION. Organized in chapters in the U.S. and abroad Nearly 4000 contractor members The voice of a 100 billion.
Building Standards for High Performance Buildings High Performance Building Council National Institute of Building Sciences Washington DC.
Translating Knowledge to On-the-Ground Results Henry L. Green, Hon. AIA National Institute of Building Sciences Congressional.
Sustainable Construction Technological Design Sustainable Construction © 2011 International Technology and Engineering Educators Association, STEM  Center.
Green Building Design/Sustainability Initiative. Green Building Design/Sustainability Initiative Why should the Brick Industry be concerned.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Welcome to Course title goes here Your Logo. Introduction.
Cannon Place, London, UK Resource Efficiency in Construction Eddy Taylor – Head of Sustainability, Laing O’Rourke BASE London, 11 July 2013.
EU perspective on occupational health and safety - role and place of unions Károly György Kiev, December December Károly György, MSZOSZ.
Identification of national S&T priority areas with respect to the promotion of innovation and economic growth: the case of Russia Alexander Sokolov State.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 7 Process Management.
INTRODUCTION The company started the production of metal products in 1992 and prefabricated modular buildings in Harmet’s product range includes.
Understanding Linkages and Regional Added Value Mark Atherton Director Energy & Environment.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
Risk and Financial Management Panel FPPA 13 th Annual Convention Sanibel Harbour – Fort Meyers, Florida February 23, 2010.
Chapter 11 Managing Application Development. Agenda Application management framework Application management issues Criteria for development approach Development.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Cross Wall Construction
Energy Seminar A prefabricated, non-disruptive approach to whole house energy retrofit. Stock assessment, appropriate properties and implementation. John.
Brittany Giel University of Florida Ph.D. Candidate Center for Advanced Construction Information Modeling January 8, 2013 Measuring Success - Metrics.
Mezyad Engineering Consultants L.C.C is an Multidisciplinary engineering consultancy that was founded in It helps clients to optimize the performance.
K-3 Modular Classrooms Constructed with Cross Laminated Timber REQUEST FOR QUALIFICATIONS FOR Design-Build Services Project No Project No
DfMA – What does it mean? Rob Francis, Skanska. “The distinctive timber viaducts were constructed using common materials which was preserved by Kyanising.
The Benefits of Modular Offices & Prefabricated Buildings For Businesses.
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
advices for advancing the productivity of the construction industry:
SHRM Poll: Green Jobs—Are They Here Yet?
Portable Cabins Sean Jordan Cabins has established itself as a market leader in the production of premium quality, multi-purpose Cabins offering advanced.
Ryan Thurston | Duncan McLennan
Off-Site Construction
Technological Design Sustainable Construction
Course title goes here.
Evaluating Onsite Design Project Team
Residential Wall Systems
How do we address the skills crisis?
Efficient curing process with Infrared Radiation
The Evolution of Building Methods Traditional Methods
Residential Wall Systems
Introduction to Quality
Offsite Construction Manufacturing BACH
Table 3. The needed requirements of the Concrete Sustainability
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

BUILT TO LAST Assessing the Benefits of Modular Construction for Military Applications

Presented by Tom Hardiman, Executive Director Modular Building Institute x 158

 Definition  Resource-efficient  Inherently greener  Quality-control  Examples  Q&A

A resource efficient, off-site project delivery method to construct code-compliant buildings in a quality-controlled setting. Temporary Office SpacePermanent Medical Facility

Modular construction saves on time/labor

In 2008, the National Research Council formed a committee of experts to indentify breakthrough technologies to improve construction efficiency. Greater use of modularization and off-site fabrication techniques was cited as one of five key breakthroughs.

Time/Labor Efficiencies Increased workers safety through reduced exposures to inclement weather, temperature extremes, and ongoing or hazardous operations; better working conditions – Advancing the Competitiveness and Efficiency of the U.S. Construction Industry; National Research Council (NRC) Labor productivity also improved when construction activities were performed using materials that were easier to install or were pre-fabricated (Goodrum et al., 2009).

Prefabrication and related techniques are commonly used in the construction of industrial projects, but they are also used, if less frequently, for commercial and infrastructure projects. The (NRC) committee believes that greater use and deployment of these techniques (if used appropriately) can result in: Improved quality, Lower project costs, Shorter schedules, More efficient use of labor and materials, and Improved worker safety. Read the full report from the National Research Council here:

Evaluation Criteria in recent U.S Army Corp of Engineers Request for Proposals: Technical Approach for Design and Construction: The Government places a higher value on an offer that provides proposed methods to streamline construction, manage labor and other resource constraints in an effort to reduce costs and support an aggressive schedule, including such things as fast tracking, using factory built modules or assemblies, panelization, pre-cast, tilt-up, standard designs, etc. The Government will also consider whether the approach reduces on-site craft labor and susceptibility to inclement weather delays.

“The life cycle expectancy of modular construction is the same as conventional, and in a world where sustainability is gaining momentum each day, there are also several basic principles intrinsic to the modular construction process that make it more eco- friendly than conventional construction.” American Institute of Architects (AIA) -“External Issues & Trends Affecting Architects, Architectural Firms, and the AIA” -February 2008

Some of the biggest waste streams in traditional construction are packaging (up to 5%), timber (up to 25%) and plasterboard (up to 36%). Up to a 90% reduction can be achieved by reducing wastes such as wood pallets, shrink wrap, cardboard, plasterboard, timber, concrete, bricks and cement by increasing the use of off-site manufacture and modern methods of construction. The full report can be viewed here:

OctoberNovember December January

Resource: How modular construction dovetails into the LEED Rating System Available at modular.org

Manufacturing building components off-site provides for more controlled conditions and allows for improved quality and precision in the fabrication of the component”– Advancing the Competitiveness and Efficiency of the U.S. Construction Industry; National Research Council

No restrictions on materials – Type II or Type V

Left: Disney’s Contemporary Resort in Orlando Right: The Hilton Palacio del Rio Hotel on the Riverwalk in San Antonio

“Never before in history has innovation offered promise of so much to so many in so short a time.” –Bill Gates

Contact info: Tom Hardiman, Executive Director Modular Building Institute x 158