 Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal)  Goal: 95% in-street portable coverage based.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

History Pre-1986 The system consisted of LB channels (44.MHz range) Heavy interference from other users Radios were limited in the number of channels available.
PAGE 1 May 9, 2012 – Ohio APCO/NENA Combined Chapter Business Meeting MARCSIP Business Plan/Rollout SHARED COMMUNICATIONS SERVICES FOR OHIO PUBLIC SAFETY.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Cameron County - Office of Emergency Management Radio Tower Site # 1 CAMERON COUNTY - WEST Existing - 7 Channel Motorola Public Safety Trunking System.
Radio Interoperability Initiative. Problems Facing Public Safety Communications Technology  Higher Frequencies  Lower Power  Trunking  User Expectations.
November 17, 2009 Sunflower Project Monthly Conversion Meeting – November.
June 5, 2007 BCC Called Public Hearing on BZA #SE , April 5, 2007 APPLICANT: Genesis Communications, Inc.
Nevada Communication Interoperability Plan Overview Developed by Nevada Communications Steering Committee Version 2.0 – Adopted April 6, 2006.
FY2007 WEB-BASED BUDGET DEVELOPMENT PROCESS “A” FUNDS Developed and Presented by The Budget Office & eBusiness Solutions.
1 Winter 2014 Leaves and Loads York University Pension Plan.
Optical Scan Ballot. January Prior to Primary Election Establish Election Precincts Establish Election Precincts Absentee precincts Absentee precincts.
Conventional vs. Trunking Radio Systems
Basic Radio Usage AWIN Network Support.
ISP 700 MHz Transition Presentation to SIEC July 28, 2011.
FCC Narrow Band Mandate: It’s Closer Than You Think.
NDSU Memorial Union, Meadow Lark Room July 21 and July 22, 2015
1 Public Safety Wireless Network – State of Wyoming.
Statewide Operational Needs and Technical Resources Assessment Presented to the Public Safety and Education Communications Governance Council by the Idaho.
P-25 Project Bartholomew County. Bartholomew County Radio Up-grades Cost.
The Narrowband Transition A Primer. Narrowband Transition What is it? What is it? A nation-wide move to new VHF/FM frequencies A nation-wide move to new.
1 Transportation Alternatives Program FY2015 Application Update February 19, 2014 Jennifer DeBruhl Director, Local Assistance Division.
The Utah Communications Agency Network Established 1997 Status as of September 2004.
ACSP Report – Review of Open Suggestions Nate Davis.
Wisconsin’s INTER PERABILITY Initiative Seamless Public Safety Radio Communications Interoperability Update March 3, 2011 Jennifer Lord Communications.
0 FY12 State Budget Discussion Policy and Fiscal Committee November 1, 2010.
End User Changes GO LIVE May 13, 2010 PS Grants Implementation.
The original HEART project was designed to provide a reliable backup communication system for hospitals and healthcare facilities during a time of crisis,
Public Safety Technology Forum June 15, Montgomery County – Public Safety Systems Modernization (PSSM) Program PSSM Program’s mandate is to replace.
Nevada Communication Interoperability Plan Overview Developed by Nevada Communications Steering Committee Version 2.0 – Adopted April 6, 2006.
IT Governance Purpose: Information technology is a catalyst for productivity, creativity and community that enhances learning opportunities in an environment.
Page 1 April 1, 2003 Langley Research Center Contractor Forum_040103_Final.ppt LaRC Core Financial Project Contractor Forum Yvonne Dellapenta LaRC Core.
FORUM Agenda 1. Fleet Vehicle Utilization Review -- Sam 2. Fleet On-line Reports -- Scott 3. Enterprise Rent-A-Car Contract Changes -- Sam 4. Already Replaced.
2014 UPDATE ABOUT THE VIPER MEDICAL NETWORK (VMN)
Narrowbanding Update Time is Growing Short Bill Waugaman L. Robert Kimball & Associates.
Incident Management PCCYFS June 27, 2007 Incident Management for the Office of Children, Youth and Families.
FirstNet in North Carolina Allan Sadowski Director of Infrastructure Planning – FirstNetNC Office of Digital Infrastructure.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
April 21, 2010 Sunflower Project Monthly Conversion Meeting – April.
Fee for Service Tele-Conference Call Tammy Koger Director North Carolina Assistive Technology Program October 29, 2009.
DHHS COE Meeting Agenda May 19, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
March 24, 2010 Sunflower Project Monthly Conversion Meeting – March.
Public Safety Radio System Upgrade & Reband Presented to the Board of County Commissioners September 9, 2008.
June 14, 2010 Sunflower Project Monthly Conversion Meeting – June.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
February Interface Monthly Meeting Sunflower Project Statewide Management, Accounting, and Reporting Tool Update February 10, 2010.
Budget Basics for Managers. Purchasing Requisition-A request to purchase goods or services. PO-Approval to purchase goods or services on behalf of the.
Adult Education Block Grant Webinar January 22, 2016.
Please read this before using presentation The Department of Mines and Petroleum (DMP) supports and encourages reuse.
DHHS COE Meeting Agenda February 16, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update Group Exercise.
2016 Filing a Form 470 For C1 Using ITS as the Secondary Billed Entity Step-by-Step for Creating and Submitting your 470 Application in the EPC Portal.
Paul Kindell Director, Warren County Telecommunications Chairman, SOSINK Interoperability Subcommittee Chairman, Homeland Security Region 6 Interoperability.
PORT OF TACOMA Port of Tacoma Commission Meeting Eric Holdeman Director, Port Security.
SPLOST VII 911 Upgrade Projects. Gail Lane, Hall County 911 Director How 911 is funded: -911 fees -User fees -General Fund supplement (approximately $1.
Welcome. Agenda Introductions Tour of Dispatch Center 911 Call & Response Process – From Citizen Call to First Responders Arrival To Resolution of 911.
Contractors Equipment Insurance A brief overview.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
California Career Technical Education Incentive Grant Program (CTEIG)
Payroll Cycles are Changing What is changing
State Coordinator Intervention
Butte Regional Radio System
Civil Rights Data Collection (CRDC)
MTA 2019 Final Proposed Budget November Financial Plan
San Diego County & Imperial County
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF-NM Project (Process Re-engineering & Optimization of Operations & Maintenance Functions.
STARCOM21 State Wide Communications System
Presentation transcript:

 Statewide 800 MHz trunked radio system available for all emergency responders (local, State, Federal)  Goal: 95% in-street portable coverage based on a 3 watt portable radio  Network infrastructure consisting of towers linked via microwave  Implementation (build-out), Operations and Maintenance provided by NC Highway Patrol  End-user requirement to join the network – purchase their own radios

 245 total sites planned for statewide coverage  202 sites constructed and on-the-air  11 sites are fully funded and under construction  28 sites require funding (pending legislative funds beginning )  VIPER is 84% complete (number of sites) with 202 sites on-the-air  65,388 users are currently on the VIPER Network  260 Emergency Responding agencies (including federal, state and local agencies) makeup the 65,388 radio users  4015 end user radios waiting to join system once P25 migration is complete.

 Programming and Radio Reconfiguration  Communications Center Readiness for P25  Tower Upgrades in advance of P25 system migration  Procurement and Funding Progress  Project timeline and target for completion

 Bulk of radio reprogramming was completed 31 December, We have five (5) counties who have yet to purchase the necessary upgrades for some of their portable and mobile radio equipment to make them P25 ready. Critical area of concern since this will potentially delay start of site migration. Federal agencies are being re-programmed in April to include the EBCI.

 All SHP centers with the exception of Troop H (Monroe) to P25. Troop H is being moved to temporary location this month and should be complete by 30 April Orange County Communications and Cumberland County are both working on their P25 console upgrade and will be complete prior to 15 June 2014.

 Fifty two (52) sites required modifications to the tower structure to be able to accommodate additional microwave dishes in support of the P25 migration. The additional microwave dishes are needed to support the increased network requirements for P25. All tower upgrades must be completed prior to moving to P25. Winter weather has negatively impacted the project timeline.

 The additional recurring maintenance funds in the amount of $2,825,471 has been extremely helpful and is much appreciated as we continue to maintain the VIPER system and the current 202 operational sites. Of the thirteen (13) new positions approved this fiscal year, nine (9) new position packages have been sent for approval from OSP.  An additional $7m recurring will commence 1 July, 2014 and continue until the completion of the 28 unfunded tower sites are complete.

 We continue to construct new towers supported by Federal Grant funds. New site activations include Warrenton and Roxboro, Fox Mountain, Potato Knob and Rendezvous Mountain on or before 28 February. We are working to provide seven (7) shovel ready tower projects in advance of 1 July, 2014 and the initial year of legislatively appropriated funds for tower construction such that we can immediately move forward when we receive our certified budget. Replacement of the High Windy tower located in Buncombe County that was damaged during a wind storm in 2013 is scheduled to begin within 60 days and should be done by mid 2014.

 The P25 migration is dependent on the completion of the reprogramming and reconfiguration of all of the radios on the system today, along with the upgrade of the 52 towers and the installation of the new microwave equipment. Only when those tasks are complete can the conversion of the current system to P25 commence. The system conversion cannot begin until Monday, 23 June at the earliest which coincides with the end of the US Open activities in Pinehurst. Once we begin, we will not stop until all of the upgrades are complete.  New tower sites continue to be added as those sites currently funded come on line. With the current level of funding identified within the VIPER budget, we will be able to ideally construct seven (7) additional new towers each fiscal year beginning with the budget.

 Counties will soon be receiving an containing the Third Update Letter. This will contain all of the same information contained in Letters one and two along with a copy of the county’s P25 fleet map, a spreadsheet that contains all of the radios that VIPER has loaded into the current Zone Controller database for the respective county, all of the radios that were located during the re-banding/P25 programming (to include radios that we did NOT have identified with a particular county) It will also include all of the radios that we did NOT locate during programming. These are radios that were NOT presented to EFJ or Motorola during the reprogramming efforts. It will be incumbent on each county to review this data and respond back to VIPER with any updates. We are also asking that counties update the ALIAS for each radio. Moving forward each county alias will start with a two digit code (spreadsheet will be included with that data) so that we start P25 with a clean database. If you locate radios that were not presented during initial programming, you will need to facilitate taking them to the shop for programming.

Significant and positive changes are coming with P25  Once the conversion to P25 is complete, VIPER ID requests and the management of P25 ID’s changes tremendously. Counties will be receiving a “block” of ID’s which will be theirs to manage. Future VIPER ID requests will contain all the necessary information to activate the radio. Model, Serial, Template, User name, Alias and ID. Greatly simplifying the activation process.  Additional sites will be coming on line where several new counties have joined VIPER and have purchased supplemental sites to improve coverage or to replace coverage lost through changes in some of our current partnership agreements.  Additional channels will be added to some sites to balance load and VIPER intends to look hard at locations where counties need to add channels to reduce system busies.

 Second touch programming will commence in Q This will involve the removal of all pre-re-banded frequencies from every radio. Physical reprogramming of radios is anticipated to be paid for by Sprint/Nextel. Changes to the programming template in the radios is NOT covered by Sprint. If you want to change your templates, agencies/counties will need to cover the cost of the template creation and Sprint will cover the cost of the ACTUAL programming.  We are slated to add over 5000 new radios to the system in the first six months which is a result of both the backlog of ID’s as well as new users waiting to join.  We encourage those counties that voluntarily surrendered some of their 4.1 ID’s to support the needs of others to load the new VIPER basic template information into their radios along with talk groups for neighboring counties that may use VIPER as their primary communications system using the new P25 ID blocks.

Questions? For all questions relating to VIPER, please contact the North Carolina Highway Patrol: Captain Jamie Blanks Unit Commander –TSU/VIPER (office) James Hour Network Operations Center VIPER ( )