Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.

Slides:



Advertisements
Similar presentations
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Advertisements

Purchase Requisition (PR) Purchase Requisition (PR) Bid Invitation 1.White copy : Finance 2.Pink copy : Filing 3.Green copy : leave in PR book CBA 1.Reviewed.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
Enabling Private Sector Investment To Deliver Privatisation Bolanle Onagoruwa Director General Bureau of Public Enterprises Presidential Power Sector Workshop.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
March 8, 2011 Portfolio Analysis and Management System (PAMS) Briefing for the Fusion Energy Sciences Advisory Committee Linda G. Blevins, Office of the.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Public Private Partnership- Identification, Viability and Implementation Prof. Yashvir Tyagi Prof. Yashvir Tyagi Department of Economics Department of.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
 PPP Projects ◦ Re structuring of Brownfield Airports (Delhi & Mumbai Airports) ◦ Greenfield Airports (Hyderabad & Bangalore Airports)  AAI Projects.
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
January 17, New Delhi. Contents  Background  Project Highlight  Power Allocation  Project Location  Gas Supply Network of ONGC.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Development and Application of Potentially Important Jute Geo-textiles (CFC/IJSG/21) Bangladesh Part Project Overview on the Progress & Achievements in.
State Information Technology Agency Presentation to Portfolio Committee on Home Affairs.
Boreal Renewable Energy Development Ferriter Scobbo & Rodophele PC Outback Engineering Richard C. Gross, Inc. March 12, 2009 Notus Clean Energy LLC Wind.
FINAL FORUM of the Project „through pREvention to Preserve the natural beauty Of the Rhodope mounTain” REPORT Smolyan, ΕΛΛΗΝΙΚΗ ΔΗΜΟΚΡΑΤΙΑ ΠΕΡΙΦΕΡΕΙΑ.
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
A WORKSHOP ON FINANCIAL MANAGEMENT IN HYDROLOGY PROJECT – PHASE-II Gujarat Water Resources Development Corporation Ltd. GWRDCGANDHINAGAR (GW Component.
Construction Construction is a discipline. It is a combination of Art Science S.W. Nunnally, Construction Methods and Management, 7th Edition, Pearson.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
Navajo Nation Integrated Justice Information Sharing Project NNIJISP Office of the Chief Prosecutor Conference Albuquerque New Mexico October 24, 2008.
December 16, New Delhi. Contents  Background  Project Highlight  Power Allocation  Project Location  Gas Supply Network of.
Energy for the Future Belene Nuclear Power Plant Project Status.
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
PUBLIC PROCUREMENT SYSTEM IN TAJIKISTAN RAVSHAN KARIMOV AGENCY FOR PUBLIC PROCUREMENT UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.
February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.
ABDUL RASHID MBAECM, MBA, MIS, CHRM, BA, DIP PRESIDENT PHONE ANTIQUA ROAD, MISSISSAUGA L5B 2T8 ONTARIO, CANADA.
MINING AND INFRASTRUCTURE INDABA 2015 ZPC PRESENTATION Presented by: N.F. Gwariro (MD)
Overview of Grant Agreements - Agreement Process - Roadmap to the Agreement Document - Agreement Requirements/ Compliance Issues - Timelines for Reporting.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
Important points regarding the Filling New forms AOC-4 (earlier 23AC/23ACA) and MGT-7 (earlier 20B) are introduced for annual filings. Board Report shall.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
TOWN OF EDENTON NEW POLICE DEPARTMENT.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
City Paper Md. Mukul Miah MIS & Monitoring Officer Bangladesh Municipal Development Fund (BMDF) Presented by
PORT OF TACOMA Capital Lumber Lease Extension Action Requested of Commission Authorize the Chief Executive Officer or his Designee to enter into a Lease.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Review of Implementation of Smart Cities Mission
Review of Implementation of Smart Cities Mission
HUMAN CAPITAL MANAGEMENT: PORTFOLIO COMMITTEE INPUTS
Review of Implementation of Smart Cities Mission
Project Development and Managing your Build Agenda
Elaborating The Committee Charter:
Delta Water Supply Project
Tender Cum Auction –Process Flow
Port Back Data Collection & Transition
Presentation transcript:

Bangladesh-India Friendship Power Company (Pvt.) Limited (A Joint Venture of NTPC Ltd and BPDB) Registered Office : Bidyut Bhaban (14th Floor), 1 Abdul Gani Road, Dhaka-1000, Bangladesh 2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT FOR THE MONTH OF FEBRUARY PROGRESS REPORT-FEB'20141

2X660 MW MAITREE SUPER THERMAL POWER PROJECT SNDescriptionPage No Remarks 1Management Summary Progress Report  Corporate Activities3  Site Activities4  Financial Progress5 2Status of Critical Inputs6 3Pending Critical Approval7 4Major Initiatives taken during this Month8 5Sch.of Activities planned for next 6 months9 6Progress Photographs PROGRESS REPORT-FEB'20142 INDEX

2X660 MW MAITREE SUPER THERMAL POWER PROJECT Appointment of Owner’s Engineer : 3 rd sets of queries of Bidders replied. Bid opening on 13 th March ’14. Appointment of Coal Consultant : Draft RFP document finalized. Environment Management Agreement signed with M/S CEGIS. 1 st Joint Meeting held with DOE PROGRESS REPORT-FEB' Management Summary Highlights – Progress: Corporate Activities Boundary wall, Slope protection & Additional area filling tender document issued to M/S BDPL. Pre-fabricated Site Office : Technical specification is under finalization Plant / Equipment Insurance Contract awarded to Sadharan Bima Corporation. Accounting software (Tally2) contract awarded & implemented.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT Pontoon Jetty commissioned. 33/11 KV Line 1 st circuit charged. Site filling work completed. Micro-leveling & compaction in progress. Earthen dyke preparation in progress, for slope protection. Divisional Conservator of Forest, Jessore visited site for initial study of forestation around project area PROGRESS REPORT-FEB' Highlights - Progress : Site Activities

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-FEB'20145 Cumulative Expenditure (FY ) Desc.Amount in BDTRemarks Cumulative Expenditure during Jul’13 - Jan’14 48,49,88,019Major expenditure on account of Site filling(41 Crs.), Rest House/Helipad /Road etc (3 Crs.), procurement of Jeep(70 L) and Porta Cabin(48L)and DG set(20L) Pontoon(69L) Expenditure during Feb’14 21,01,965Major expenditure on account of Insurance (2.8 L), Pontoon Foundation (2.9 L), AIT payment for Jeep (2.9 L) Cumulative Expenditure during FY ,70,89,984 Value of Work/Purchase Order placed in Feb’14 4,26,0005-Work/Purchase Order placed in Feb’14

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-FEB'20146 Critical Assistance Required from External Govt. Bodies Sl. No Required inputAnticipated dateRemarks 1a) Startup power b) Power evacuation system Design activities & EPC contract estimation by PGCB is being expedited. Meeting held with Secretary (Power) & PGCB. 2Access road (6.0 km long) May ‘16 (critical) Govt. approval already available. Meeting held with LGED for expediting the Design activities & Award of Contract. 3.Cap. dredging: a) Mongla port to outer bar. b)Port to project March 2014 March 2016 Expedited with Mongla Port Authority. Funding issue raised by Mongla Authority was resolved. GOB to fund the Capital Dredging.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT IssueStatus  SEC Approval  For raising Capital Exceeding BDT 10 Crs.  For not Listing in Stock Exchange Approval given by SEC for raising initial capital (BDT 16 Cr.). We have to apply separately each time for additional capital induction, as per requirement. SEC will accord approval separately.  Coal Sourcing, Supply & Transport Agreement 9 consultants shortlisted for Coal Consultancy. Issue of RFP in Mar’ PROGRESS REPORT-FEB'20147 Critical Approvals / Agreements

2X660 MW MAITREE SUPER THERMAL POWER PROJECT Environment management and monitoring Contract awarded to CEGIS. 1 st joint meeting with DOE done. Accounting Software contract awarded & implemented. BIFPCL PR Brochure made. Meeting held with LGED for expediting the construction of access road to Plant PROGRESS REPORT-FEB' Major Initiatives taken during Feb’14 Committee formed for Fast-track project Implementation has started monitoring of Progress Data,Voice and Video Communication system is awarded & works commenced. Meeting held with Chief Conservator of Forest for making the green belt around Project area.

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-FEB'20149 Schedule of activities Planned in next six months Sl. No ActivityAnticipated date Remarks 1Start of B/wall & Slope Prot. WorksMar’14 2Bid Opening of OE and Award.Mar’14 3.Issue of RFP to Short listed Coal consultants Mar’14 4.Award of additional fillingMar’14 5OBD for 33KV/11KV Sub-stationApr’14 6NIT for EPC PkgMay’14 7Tree Plantation StartJun’14 8Award of Pre-fabricated Site OfficeJul’14 9Prebid Conf. Of EPC PkgAug’14

2X660 MW MAITREE SUPER THERMAL POWER PROJECT PROGRESS REPORT-FEB' Construction Power Material Stacked at site

BANGLADESH- INDIA FRIENDSHIP POWER COMPANY (PVT.) LTD PROGRESS REPORT-FEB' PARTNER IN PROGRESS