Instructions for Completing the S upplier V erification of P urchased P roduct Package.

Slides:



Advertisements
Similar presentations
Welcome to the Manage Orders lesson for the North Carolina Immunization Branch. Contents: Placing a State Supplied Order Accepting a State Supplied Order.
Advertisements

MASTER QUOTE OVERVIEW.
Vendor Analysis. 2 of : Vendor Analysis / DA0199-w1 Last updated: Vendor Analysis Information in Inventory Control Introducing numerous modifications.
Spreadsheets A spreadsheet package is a general purpose computer package that is designed to perform calculations. A spreadsheet is a table which is divided.
Making online claims for OCR Nationals A step-by-step guide for centres.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
LeaveTraq Training for Managers HUMAN RESOURCES DIVISION OF FINANCE.
PPAP Requirements Training
Triumph Aerostructures-Vought Aircraft Division - PROPRIETARY SMRR OVERVIEW.
Works Cardholder Tutorial Initial Login, Transaction Review, & Reports.
1Allocating Expenses. Create Report Header Page To access this screen, click on ‘New Expense Report’ from your Expense Module Tab This page will come.
PROACTIS: Supplier User Guide Contract Management.
Submitting Book Chapters via Manuscript Central A Short Guide for Wiley-VCH Authors.
Navigation instructions Begin the tutorial Creating the Performance Plan Performance Management System Tutorial for Managers Estimated Time to Complete:
First Article Inspection
E2Open Supplier Training
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
Virtual EMS Step by Step Instructions to Submit Online Room Reservation Requests Events Management Office Rick McCluskey
I/3 Budget FY 2008 Department Request Training Nickie Whitaker Department of Management August 14, 2006.
FY 2009 Budget Preparation By Budget Office Staff.
How to Place a Customer Delivery Service Order
Copyright CovalentWorks Training Guide for Invoices MYB2B Powered by CovalentWorks.
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
GRITS Manage Orders Training Overview: Inventory and Manage Orders Functions 05/08/2014.
Instructions for Completing the P rint A ttribute R esults Form Last revised 3 January 2005.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Pack Company Procedures. Accepting a HIP request from a supplier Allocating the Component Providers Sending the instruction through to the Component Providers.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Indicator 13 Secondary Transition. Main Menu SPP13 has a navigation toolbar located at the top of each screen. If you use the toolbar to navigate to another.
Suppliers without a Contract Purchase Order for Services.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Supplier Performance Development Process
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
Reliance PPAP Application. Reliance - PPAP The PPAP application is designed to generate and track the entire Purchase Part Approval Process. Reliance.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Supplier Corrective Action Request (SCAR) Supplier Training
ORACLE TRAINING iPROCUREMENT
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Part Approval / Compliance Data Submission via Jotform.com
Engineering Change Request (ECR) Process Change Request (PCR)
DSQR Training Reliance System
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Resolve Invoice Exceptions
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Student SOLE Page – Living Page
TuNGSTEN E-INVOICE SUBMISSION GUIDE.
Supplier Profile Key Data
2012 Business Guidelines for Association Membership
First Article Inspection
To Logon: URL: Input: Login ID (user address)
Appearance Approval Report (AAR)
Reliance Supplier Corrective Action Process
Part Approval / Compliance Data Submission via Jotform.com
Suppliers without a Contract
Create and Edit Item Records
CDRL E003 CFAT REPORT TEMPLATE
First Article Inspection Reports (FAIRs) Instructions for Suppliers
HEATING, COOLING & WATER HEATING PRODUCTS
Polycom Quotes on Demand Tool Partner Manager Guide Version 1.1
Supplier Performance Development Process
To the ETS – Encumbrance Online Training Course
Reliance Supplier Corrective Action Process
Supplier Performance Development Process
Managing Multi-source Feedback
To the ETS – Encumbrance Online Training Course
Mylan Quick Reference Guide (QRG) February 2016.
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Presentation transcript:

Instructions for Completing the S upplier V erification of P urchased P roduct Package

What does SVPP consist of?

When is SVPP Required? New Product Engineering Change –New revision level –Part number change, etc. Process Change –Change of equipment. –Change of sub-tier supplier. –Tooling / Die / Mold change. Manufacturing Location Change As suporting documentation for: –To document relevant MDA (Material Deviation) information. –To verify the part after an MDA has expired. –To document Corrective Action results / information. Other changes to part or process????

Submitting the SVPP Report Any discrepancies MUST be communicated prior to sending the SVPP report. –If a discrepant SVPP Report is sent without prior approval, an MRN will be generated for the lot and will affect the supplier’s quality report. SVPP reports must be submitted separately to each Climate Control facility. –Only the Quality Manager (or designated representative) at the receiving facility may waive this requirement. If the requirement is waived, a copy of another facilities SVPP may be submitted. Please note, this option is for special cases only and should not be requested for each submittal.

The supplier completes #1 - #7 with the appropriate information. The grayed areas are completed by Climate Control upon receipt of SVPP Package. How to Complete the PAR Form

#8 The Symbol field is used for reference symbols as appropriate. –It is used to allow the actual dimension to remain numeric, therefore enabling the automatic calculations used in other portions of the document. –Symbols may be used other than those shown. How to Complete the PAR Form

#9 & #10 Whenever possible, use only numeric values in these columns. –Under normal conditions, do not add units of measure (mm, in, etc.) here. Again, this enables automatic calculations. In the case of documenting notes, please be as specific and detailed as possible. How to Complete the PAR Form

#11 Following the numeric format wherever possible, enter the measured or observed values for the actual samples. –When completing fields for notes, be as specific as possible. In most cases “OK” will not be accepted. How to Complete the PAR Form –Note the Green and Red formatting. This is used as an aid to identifying out of spec conditions. However, the supplier remains responsible for identifying in-spec and out-of-spec conditions. This is automatic when purely numeric values are used and when the nominal and tolerance values are completed correctly. In the case where non-numeric values are used, the format defaults back to black. This is OK.

#17 The supplier is responsible for completing these columns with either “Y” or “N”. –If numeric data is used properly, this column should complete automatically. For notes and other non- numerical data, “#VALUE!” or similar may appear. If so, manual completion is necessary. –If the data does not meet the specifications, the supplier must initiate communication with Climate Control to determine the next action.on results. –The extent that these fields are completed are at the discretion of the receiving plant. How to Complete the PAR Form

Questions????

Examples of Completed Forms Sheetmetal Assembly Example Example of a top level sheetmetal assembly. (As Purchased)

Examples of Completed Forms Sheetmetal Assembly Example The SVPP requirements would cascade as shown here.

Examples of Completed Forms Sheetmetal Assembly Example

Examples of Completed Forms Cable Assembly Example

Questions???? Contact: –Supply Chain Support