H->bb Winter Note Ricardo Gonçalo (RHUL) HSG5 H->bb Winter Note Meeting, 12 January 2011.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Introduction Ricardo Gonçalo HSG5 weekly meeting – 19 January 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 11 October 2011.
ZH ➝ ννbb news & plans Ricardo Gonçalo ZH->ννbb phone meeting – 24/1/2012.
HSG5: work towards Moriond H->bb paper for Moriond: – WH->lνbb and ZH->llbb: – Analysis seems ready. See status here:
Spatial Analysis in the Atlin/Taku Land Use Planning Process Presentation to Stakeholder and Local Community Workshop #3 March 6, 2009.
Doc.: IEEE /0233r0 Agenda March 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Introduction MICE DAQ Workshop Fermilab February 10, 2006 A. Bross.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 2 August 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 30 August 2011.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – Mar. 1, 2007 Outline: Status of infrastructure Schedule.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 18 October 2011.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 5 April 2011.
Introduction Ricardo Goncalo ATLAS-UK Higgs Meeting, 3 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 3 May 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 26 April 2011.
CS 858 – Hot Topics in Computer and Communications Security Winter 2009 Introduction.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 10 May 2011.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 22 November 2011.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 8 March 2012.
H ➝ bb search and b-tagging Ricardo Gonçalo on behalf of the Higgs subgroup 5.
Search for the Standard Model Higgs boson produced in association with a vector boson and decaying to a b-quark pair with the ATLAS detector at the LHC.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 9 March 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 23 August 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 31 May 2011.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 29 March 2011.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
FGDC Metadata Working Group- Conference call February 2007.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 8 February 2011.
Doc.: IEEE /011 Submission January 2000 Al Petrick, ParkerVision TGd IEEE – TGd Jan 10 –15, 2000 Tel Aviv, Israel.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 March 2011.
Introduction Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 7 June 2011.
H->bb Note Schedule Ricardo Gonçalo (RHUL) HSG5 H->bb WH/ZH note meeting with Editorial Board, 28 June 2011.
Diphoton + MET Analysis Update Bruce Schumm UC Santa Cruz / SCIPP 03 July 2013 Editorial Board Meeting.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
H ➝ bb Note Meeting Malachi Schram, McGill Ricardo Gonçalo, RHUL H->bb 7TeV meeting, 5/11/2011.
HSG5 Report: ongoing activity and 2012 plans Ricardo Gonçalo (RHUL) Higgs Working Group Meeting – 10 May 2012.
2 nd Editorial Board Meeting JRC Ispra, November 26 th 2004 Soil of Atlas Europe.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 22 February 2011.
Introduction Malachi Schram (McGill), Ricardo Gonçalo (RHUL) H->bb Note Meeting, 15 December 2010.
H->bb Status Ricardo Gonçalo (RHUL) on behalf of the H->bb analysis team HSG5 Meeting, 16 February 2011.
HSG5 Status Paper/note circulation: Reading of draft 1on 24 th April: – Talks by Giacinto and Pippa Inputs for combination: separated WH/ZH for vvbb next.
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb Weekly Meeting, 15 February 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) on behalf of the HSG5 H->bb group Higgs Working Group Meeting, 9 June 2011.
Doc.: IEEE /1515r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: January 2016.
Introduction Ricardo Gonçalo HSG5 weekly meeting – 3 February 2012.
News from H->bb Ricardo Gonçalo on behalf of H->bb Note group HSG5 Meeting – 3 Dec
H->bb Weekly Meeting Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 16 August 2011.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Introduction 08/11/2007 Higgs WG – Trigger meeting Ricardo Gonçalo, RHUL.
Reunion Communications Workshop
NATA Foundation General Grants Program Process
IEEE 1914 NGFI IEEE RoE TF Opening Report
Potential Milestones A timeline to finish in one year
Strategic Plan FY 2019 – FY 2023 Update.
Mika Kasslin, TGh chair January 19, 2001
Revision TG March 2018 Rosemont Meeting Agenda
IEEE TGaf Waikoloa Closing Report
The Job Access and Reverse Commute (JARC) & New Freedom Programs
802.16m Opening (Final) Report
Review plan of the nature reporting – update 6
TGaf Orlando Closing Report
Full Day Kindergarten Timeline
NATA Foundation General Grants Program Process
Revision TG March 2018 Rosemont Meeting Agenda
Presentation transcript:

H->bb Winter Note Ricardo Gonçalo (RHUL) HSG5 H->bb Winter Note Meeting, 12 January 2011

Introduction Main aim of this meeting is to decide on go/no go for the WH/ZH Winter note aimed for Moriond Second aim is to discuss working plans for the non-Winter note activities News: – Mini acceptance challenge in HSG5: Compare everyone’s results given the same cuts and the same data sample: tt di-lepton MC or possibly data from given period – very useful to debug analysis machinery – HSG5 Workshop in Dubna – 23 to 27 th May 2011: Visas have to be thought about soon! Expect with instructions for registration etc Will be the last check point for Summer CONF notes before approval process – aim to have solid results

ZH/WH Winter Note Editorial Board has been appointed: – Bill Quayle (Chair) – Ulla Blümenschein – Sascha Rozanov – All very busy people(!) Timeline counting back from Moriond (13 th March): – First OK from Ed.Board around 24 January – leaves only 1 week interaction with editors! – In parallel: present results to Higgs WG – One week to address all comments through CDS – ATLAS approval talk after EdBoard final approval: mid February – Address all ATLAS comments by end February – PhysCoor and PubComm signoff early March The ZH analysis has been moving too slowly since Malachi has started ramping down – Problems found in code, normalizations come out looking wrong, questions on sideband contamination, etc – No point in pursuing note for Moriond from ZH standpoint – Instead will have better analysis and results for Summer conferences – Would like to keep same EdBoard if possible What about WH?

Plans for Summer Should aim to have results for Dubna workshop – leave time for approval process Get started on text – helps see direction of work Proposal: – weekly meetings of WH and ZH groups plus monthly H->bb meetings – What days would be best?