SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

29/04/04 Landfill Directive 1999/31/EC Colin Gray 29 April 2004.
Alternative scenarios for the implementation of a new funding model in Latvian higher education Prof. Dr. Hans Vossensteyn (CHEPS) Conference „New Higher.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 186 January Assumptions No provision for TMA, Tax or Exit re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October.
Medium Term Financial Plan (MTFP) April MTFP The MTFP is a high-level forecasting model that enables the Council to assess the financial direction.
Chapter 8 Rate and Tariff Adjustment Mechanisms. 8.2 Inflation Adjustments RPI-X Adjustment (most common) RPI--- retail (consumer) price inflation index.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Fiscal Policy Recall: Fiscal Policy- government’s choices regarding spending and taxes. Defn:The federal budget is an annual statement of the revenues,
EGR 403 Retirement Planning - Part I 1 EGR 403 Introduction to Retirement Planning Part I - Basic Approach Part II - Determine Total Capital to Invest.
Presentation to GDPCR Cost Workshop Alex Wiseman Regulation Director 19 th April 2007.
Mod 186 July Assumptions No provision for TMA or Tax re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October 2009.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
EHV generation charging methodology change Harvey Jones.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
TOWN OF SWAMPSCOTT FINANCIAL FORECAST FISCAL YEARS 2014 – 2018 Tom Younger Town Administrator November 28, 2012.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Poverty in Scotland and the UK Communities Analysis Division– September 2015 While relative poverty in Scotland fell in 2013/14, it remained flat in the.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
SGN’s July 09 Mod 186 Report DCMF Meeting – July 27 th 2009.
Industry Dialogue on xoserve Services 14 th September 2007.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Accompanying Narrative
DCMF Meeting – January 26th 2009
Gas Distribution Charging
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
RIIO-GD1:network charging volatility
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Transmission Workgroup 4th October 2012
Mod 0621 Amendments to Gas Transmission Charging Regime
Head of Member Communications
Mod 0333: Supporting Information Pack
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
The Proposals Change the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible supply.
Climate Change Legislation & Agriculture
Questions for Consultation
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Key movements from September 17
Presentation on behalf of all DNs Lorraine Goodall - SGN
Finance & Administration
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC Transmission Workstream 7th December 2006
Mark Freeman 29th January 2007
Denis Aitchison/Rob Hetherington
DN Charging Methodology Forum SGN March 2019 Mod 186 Summary
Pricing and Margins Manager National Grid Distribution
Draft Budget Scottish Government Overview Analysis over time
Presentation transcript:

SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009

Scotland Revenue Data

Scotland – Commentary (1) 2007/08 Pass through movement is due to a reduction in Formula Rates and Licence Fees The increase in the Mains Replacement allowance has outweighed the decrease in the Shrinkage allowance K movement is an under recovery from 2006/7 The under recovery in 2007/08 is mainly due to the under recovery being brought forward from 2006/07 - this effect being reduced by the higher than forecast throughput 2008/09 Pass through movement is due to a change in Formula Rates, NTS Pension and Licence Fees K movement is an under recovery from 2007/08 Incentive movement is primarily driven by decreases in the Shrinkage and Mains Replacement allowances offsetting increases in Innovation Funding allowance 95/5 Capacity/Commodity methodology implemented from 1 October 2008

Scotland – Commentary (2) 2009/ /13 Pass through movement is due to a change in Formula Rates, NTS Pension, Licence Fees and the Traffic Management Act (from 2010/11 onwards) Incentive movement includes increases in the Environmental Emissions and Innovation Funding Incentive mechanisms, and the Discretionary Reward Scheme from 2010/11. From 2008/09 to 2009/10 the shrinkage allowance decreases from the inflated PCR shrinkage - however from 2010/11 onwards the shrinkage allowance increases. 2009/ /13 Due to 2013/14 being in a period of a yet undetermined Price Control Review - a working assumption has been made of total allowed revenue being 2012/13 allowed revenue with forecast RPI applied Sensitivity Analysis – Refer to published report Further Information * This is an increase to new rates under 95/5 methodology, not an increase to Oct 07 rates Disclaimer - Refer to published report

Southern Revenue Data

Southern – Commentary (1) 2007/8 Pass through movement is due to a reduction in Formula Rates and Licence Fees The decrease in the Shrinkage allowance has offset increases in Mains Replacement and Exit Incentive allowances K movement is an under recovery from 2006/7 The over recovery is due to higher than forecast volumes 2008/9 Pass through movement is due to a change in Formula Rates, NTS pension and Licence Fees K movement is an over recovery from 2007/08 Incentive movement is primarily driven by decreases in the Shrinkage and Mains Replacement allowances offsetting increases in Innovation Funding, Exit Incentive and Environmental Emissions allowances 95/5 Capacity/Commodity methodology implemented from 1 October 2008

Southern – Commentary (2) 2009/ /13 Pass through movement is due to a change in Formula Rates, NTS Pension, Licence Fees and the Traffic Management Act (from 2010/11 onwards) Incentive movement includes increases in the Environmental Emissions, Exit Incentive and Innovation Funding Incentive mechanisms, and the Discretionary Reward Scheme from 2010/11. From 2008/09 to 2010/11 the shrinkage allowance decreases from the inflated PCR shrinkage - however from 2011/12 onwards the shrinkage allowance increases. 2009/ /13 Due to 2013/14 being in a period of a yet undetermined Price Control Review - a working assumption has been made of total allowed revenue being 2012/13 allowed revenue with forecast RPI applied Sensitivity Analysis – Refer to published report Further Information * This is an increase to new rates under 95/5 methodology, not an increase to Oct 07 rates Disclaimer - Refer to published report