PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

PACS IIDR 01/02 Mar 2001 Baffle and Straylight1 D. Kampf KAYSER-THREDE.
PACS IQR13 Jan 2005 Optical Plans PFM 1 Optical Qualification and Plans for PFM N. Geis MPE.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
FLAO Alignment Procedures G. Brusa, S. Esposito FLAO system external review, Florence, 30/31 March 2009.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
PACS IBDR 27/28 Feb 2002 PACS FPU FPU R. Graue, D. Kampf Kayser-Threde.
PACS IIDR 01/02 Mar 2001 FPU Struts, Filter Wheel, Calibration Source1 D.Kampf, Dr. Roland Graue Kayser-Threde GmbH.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PACS IIDR 01/02 Mar 2001 PACS Mirror Specification1 Mirror Specification D. Kampf KAYSER-THREDE.
DM - COA Housing. DM - COA Housing with mirrors and alignment devices installed Alignment cubes Alignment devices Dummy chopper.
Summer Fun with Optics Stephen Muchovej UC Berkeley CARA - REU Program.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
Advanced Optics Lab at San Jose State University Ramen Bahuguna Department of Physics.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Engineering: NAHUAL Ireland Acquisition Camera, Focal Plane Mechanisms and Layout Tully Peacocke, National University of Ireland Maynooth Carlos del Burgo,
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
PACS IBDR 27/28 Feb 2002 Optical System Design1 N. Geis MPE.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
WFIRST IFU -- Preliminary “existence proof” Qian Gong & Dave Content GSFC optics branch, Code 551.
Opto-Mechanics for SNAP at UM
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
Optical & Radiometric Conceptual Design of EMAS Thermal Port Upgrade Kickoff Meeting June 29, 2010 Roy W. Esplin.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Another Modular Focal Plane: Part 1 – Sub-modules Bruce C. Bigelow University of Michigan Department of Physics 5/17/04.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
COB Integration and Test Nov. 15, 2010 Roy Esplin Mike Watson Monte Frandsen.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
Compressor Helium filled optional equivalent plane imaging laser beam dump hole in mirror for e-beam SSA and more.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Development of Micro-Pore Optics at NAOC MPO research group X-ray Imaging Laboratory, NAOC Presented by Chen Zhang.
Laser beam trajectory measurement with a CCD camera Georg Gassner.
SNAP spectrograph demonstrator : AIT/AIV Cedric CERNA CNRS (IN2P3,INSU) FRANCE,
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
IR Detector - Test cryostat : Machining
An IFU slicer spectrometer for SNAP
(Preliminary) WIYN 0.9 Meter Collimation Procedure
Presentation transcript:

PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde

PACS IHDR 12/13 Nov 2003 PACS FPU Optics Concept - Overview Optical Layout unchanged compared to IIDR Optical analyses and documentation completed –Alignment plan –Straylight analyses –Optical Performance analyses (Ray tracing, spot diagrams) –Mirror fabrication data package

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Tasks Optical axis of telescope to FPU (alignment cubes/mirrors) Top Optics with Calibration Sources and Chopper Slicer optics Spectrometer/Collimator optics with Grating Assembly Dummy, Dichroic, FW1, Ge:Ga Detectors Bolometer optics with Dichroic, FW2 Integration of bolometer assembly (CEA)

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Laser Battery (AKF) at Telescope secondary mirror Laser battery OB simulator Top Optics

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Top Optics at OB with alignment cube and mirror Top Optics side view Chopper Internal aperture stop

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Top Optics without OB from rear Intermediate Focal plane

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Bolometer alignment Laser diode setup Pinholes at focal plane for laser OR LED‘s

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Bolometer alignment jig for filter wheel and focal planes

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Slicer alignment together with Top Optics Focal Plane

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Plan Collimator Alignment Laser & LED Source

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment procedure (first page only)

PACS IHDR 12/13 Nov 2003 PACS FPU Autocollimation of Alignment Tool

PACS IHDR 12/13 Nov 2003 PACS FPU Top Optics Centered

PACS IHDR 12/13 Nov 2003 PACS FPU Final Alignment

PACS IHDR 12/13 Nov 2003 PACS FPU Laser test set up

PACS IHDR 12/13 Nov 2003 PACS FPU Top Optic Set Up

PACS IHDR 12/13 Nov 2003 PACS FPU Top Optics Alignment Set Up

PACS IHDR 12/13 Nov 2003 PACS FPU Top Optics Alignment Set Up

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment

PACS IHDR 12/13 Nov 2003 PACS FPU OGSE Overview Status OGSE design and procurement nearly completed (Spectrometer: until end of Nov 2003) Procured OGSE Items Autocollimation telescope Optical mounts 4 x CCD array with optics PC with framegrabber 2 x alignment telescope 10 x HeNe Laser and laser diodes Set of pinholes with LED's (point sources) Support structure for pinholes Masks for mirrors (plexiglas with 3 point orientation to the front surface) Scatter-plates Lateral translation stages 2 x Rotary table Alignment mirrors during alignment (temporary) Alignment mirrors for FPFPU alignment Pentaprism

PACS IHDR 12/13 Nov 2003 PACS FPU Alignment Status Updated Alignment plan issued Alignment procedure engineering completed Top Optic Alignment under progress (until mid of Nov.2003) –Chopper, Calibration Sources, Alignment Cubes aligned Top Optics Stability test under Helium temperatures in KT Cryostat after Top Optic alignment Slicer, Collimator, Bolometer, Spectrometer alignment until X-mas 2003