MARFC Operational Backup A Case Study January 26, 2006.

Slides:



Advertisements
Similar presentations
24-Apr-03UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS SECURITY SOFTWARE MAINTENANCE BACKUP.
Advertisements

A couple of slides on RAL PPD Chris Brew CCLRC - RAL - SPBU - PPD.
IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
Custom’s K-12 Education Technology Council Presents… Custom Computer Specialists Server Technology Solutions Designed for NYCDOE Affordable and.
Report of Liverpool HEP Computing during 2007 Executive Summary. Substantial and significant improvements in the local computing facilities during the.
Windows DX 66 megahertz (MHz) or faster processor (Pentium central processing unit recommended). 16 megabytes (MB) of memory (24 MB recommended).
Chapter 1 Computer, Internet, Web, and Basics
Copyright GeneGo CONFIDENTIAL »« MetaCore TM (System requirements and installation) Systems Biology for Drug Discovery.
Chapter 5: Server Hardware and Availability. Hardware Reliability and LAN The more reliable a component, the more expensive it is. Server hardware is.
Linux Clustering A way to supercomputing. What is Cluster? A group of individual computers bundled together using hardware and software in order to make.
Novell Server Linux vs. windows server 2008 By: Gabe Miller.
Moving to a Virtual World Don Mendonsa Lawrence Livermore National Laboratory This work performed under the auspices of the U.S. Department of Energy by.
GLB Division The Group counts more than 300 resources. The sale of products is approx. 400K units/year. The revenues for the last fiscal.
Chapter 2 INSTALLTION OF LINUX DISTRIBUTION. Minimum hardware requirement 1) DVD drive: You must have a DVD drive (either DVD-ROM or DVD burner), and.
ILLiad Migration & Server Upgrade: From Your Library's' IT Point of View Juan Denzer Library System Specialist August 1, 2013.
Presented by Jacob Wilson SharePoint Practice Lead Bross Group 1.
RAID Redundancy is the factor for development of RAID in server environments. This allows for backup of the data in the storage in the event of failure.
Keeping Everyone Happy: Serving Windows Users in a Macintosh Environment Laurie Sutch, University of Michigan.
THE QUE GROUP WOULD LIKE TO THANK THE 2013 SPONSORS.
Digital Graphics and Computers. Hardware and Software Working with graphic images requires suitable hardware and software to produce the best results.
Gareth Smith RAL PPD HEP Sysman. April 2003 RAL Particle Physics Department Site Report.
Cluster computing facility for CMS simulation work at NPD-BARC Raman Sehgal.
Computer Hardware Computer Technology Jeopardy Review By C. Lyman © July 2007.
Basic Computer Structure and Knowledge Project Work.
LAN / WAN Business Proposal. What is a LAN or WAN? A LAN is a Local Area Network it usually connects all computers in one building or several building.
Day 10 Hardware Fault Tolerance RAID. High availability All servers should be on UPSs –2 Types Smart UPS –Serial cable connects from UPS to computer.
Chapter 7: Using Windows Servers to Share Information.
Court IT Issues Windows XP Problem April 8, 2014 Microsoft Ends Security Updates April 9, 2014 XP Computers will contract an OS Infection as soon.
INTRODUCTION TO COMPUTING
MicroSCADA Pro Partners Club 04/2007 © ABB MicroSCADA Pro Partners Club SYS Scalability Marko Viitala.
Computer Concepts Projects 3 and 4 Dozer’s Quintessential Guide to Computer Literacy CO SCI 58.
RIDGE Version II (Radar Integrated Display with Geospatial Elements) NOAA Systems of Systems Workshop – October 6-7, 2009 – RIDGE Team  RIDGE Version.
Windows Servers.  HP Advanced Model (7.5 Unit) model 3 - $5912  ML 350 Chassis, Tower Form Factor  Dual-Core Intel Xeon 5140 Processor (IA64)  5 Gb.
What is system software and what are its parts? Programs that control operation of computer Two parts are operating systems utility programs.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
Presented by, MySQL AB® & O’Reilly Media, Inc. 0 to 60 in 3.1 Tyler Carlton Cory Sessions.
Hosting on a managed server hosted by TAG  No technical support required  Full backup of database and files  RAID 5 system means that if a hard drive.
Presented by: Mostafa Magdi. Contents Introduction. Cloud Computing Definition. Cloud Computing Characteristics. Cloud Computing Key features. Cost Virtualization.
© Copyright 2013 TONE SOFTWARE CORPORATION New Client Turn-Up Overview.
Sandor Acs 05/07/
U.S. Department of the Interior U.S. Geological Survey StreamStats: System Design and Web Implementation 12/18/02 Jacque Coles - USGS Dean Djokic - ESRI.
Dec07-02: Prototype Parking Meter Phase 8 Bret Schuring: Team Leader Pooja Ramesh: Communications Wilson Kwong, Matt Swanson, Alex Wernli.
StorCenter ix4-200d Training By Erik Collett August 2009.
Hosted SharePoint. Part 3/3: Office Live as a WSS solution Speaker Name Microsoft Corporation Hosted.
8th Grade Computer Technology Mr. Minger January 2014
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Implementation of a reliable and expandable on-line storage for compute clusters Jos van Wezel.
Day12 Network OS. What is an OS? Provides resource management and conflict resolution. –This includes Memory CPU Network Cards.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Status of the Bologna Computing Farm and GRID related activities Vincenzo M. Vagnoni Thursday, 7 March 2002.
ClinicalSoftwareSolutions Patient focused.Business minded. Slide 1 Opus Server Architecture Fritz Feltner Sept 7, 2007 Director, IT and Systems Integration.
1111 AWIPS Technology Infusion Standardized Configuration for AWIPS II Testing (SCAT) Platform.
Sydney Region Servers. Windows 2003 Standard Configuration Able to be supported remotely Antivirus updates managed from server.
May07-02: Parking Meter Clint Hertz: Team Leader Austyn Trace: Communications Nick Hollander Christian Baldus.
D0 Farms 1 D0 Run II Farms M. Diesburg, B.Alcorn, J.Bakken, R. Brock,T.Dawson, D.Fagan, J.Fromm, K.Genser, L.Giacchetti, D.Holmgren, T.Jones, T.Levshina,
AMGA-Bookkeeping Carmine Cioffi Department of Physics, Oxford University UK Metadata Workshop Oxford, 05 July 2006.
Repository Manager 1.3 Product Overview Name Title Date.
 Input - A device, such as a keyboard, used to enter information into a computer  Output - Electronic or electromechanical equipment connected to.
Component 8/Unit 1bHealth IT Workforce Curriculum Version 1.0 Fall Installation and Maintenance of Health IT Systems Unit 1b Elements of a Typical.
Hardware Architecture
Jefferson Lab Site Report Kelvin Edwards Thomas Jefferson National Accelerator Facility Newport News, Virginia USA
Dirk Zimoch, EPICS Collaboration Meeting October SLS Beamline Networks and Data Storage.
Chapter 7: Using Windows Servers
Information Technology
Virtualization OVERVIEW
Keyboarding Class LHMS Ms. Key © Mr. Thrasher
Design Unit 26 Design a small or home office network
BARC Scaleable Servers
Computer Hardware Computer Technology Jeopardy Review
Local Area Networks School of Business Eastern Illinois University
Dell ™ PowerEdge R320 E GB 1TB:- 57,900 Baht
Presentation transcript:

MARFC Operational Backup A Case Study January 26, 2006

1/26/2006MARFC Operational Backup2 Outline ProblemProblem Proposed SolutionProposed Solution ResultsResults IssuesIssues

1/26/2006MARFC Operational Backup3 Problem MARFC moving to new facilityMARFC moving to new facility AWIPS unavailable for up to 6 days during moveAWIPS unavailable for up to 6 days during move How to conduct operations during AWIPS outageHow to conduct operations during AWIPS outage –Maintain full operational output Official ProductsOfficial Products All web informationAll web information –Worst case planning?

1/26/2006MARFC Operational Backup4 Proposed Solution Utilize in-house Linux serverUtilize in-house Linux server X-client LaptopsX-client Laptops ER WAN ConnectionER WAN Connection Data feed via LDMData feed via LDM Transmission via LDADTransmission via LDAD Additional seats for flooding and supportAdditional seats for flooding and support AWIPS OB4 BasisAWIPS OB4 Basis

1/26/2006MARFC Operational Backup5 Proposed Solution - Server Linux ServerLinux Server –Dell 4600 PowerEdge (late 2002) –Dual 2 GHz Xeon CPUs –1 GB Memory –Raid 1 SCSI 73GB HDs –Dual Power Supplies –RH 7.3

1/26/2006MARFC Operational Backup6 Proposed Solution - Access 4 Operational seats4 Operational seats X access via 3 client laptopsX access via 3 client laptops –Part of ER RFC Backup Project –1600x1050 resolution 1 ½ screens1 ½ screens –External mouse and keyboard –Additional monitor for “non-AWIPS” display Server console for HASServer console for HAS 2 add’l clients for support and flooding2 add’l clients for support and flooding

1/26/2006MARFC Operational Backup7 Proposed Solution - Comms ER WAN ConnectionER WAN Connection Data feed via LDMData feed via LDM –Redundancy via ERH and SRH Transmission via LDADTransmission via LDAD –Redundancy via PBZ with ERH backup

1/26/2006MARFC Operational Backup8 Proposed Solution - Apps Based on AWIPS OB4Based on AWIPS OB4 Synchronize local apps changes between AWIPS and serverSynchronize local apps changes between AWIPS and server –Crons as well Allow all auto processes to continueAllow all auto processes to continue –Shut off delivery via tokens Identify files to sync to go liveIdentify files to sync to go live –OFS, DB, control

1/26/2006MARFC Operational Backup9 Results Difference in capabilitiesDifference in capabilities –No D2D –No ArcView use FOPFOP Inundation mappingInundation mapping –No 12Planet (within AWIPS only) –1 ½ vs. 3 screens

1/26/2006MARFC Operational Backup10 Results OperationsOperations –Started with HAS AM shift 12/5/2005 –Product delivery easily shut off on AWIPS and initiated on backup via tokens –Continued in backup mode until Thursday, 12/8, morning hydro shift AWIPS available for testing Wednesday night, 12/7AWIPS available for testing Wednesday night, 12/7 –Token reset shut off delivery from backup and initiated on AWIPS

1/26/2006MARFC Operational Backup11 Results PerformancePerformance –No forecaster perceived slowness in any operational application –No missed delivery of any text or graphical product SUCCESS!SUCCESS!

1/26/2006MARFC Operational Backup12 Issues Keeping in-step with AWIPSKeeping in-step with AWIPS –Upgraded to OB5 on AWIPS prior to move –Stayed on OB4 due to DB table changes Not sure of best approach to incorporate changes of this natureNot sure of best approach to incorporate changes of this nature OB6?OB6? Help with problemsHelp with problems Maintenance overhead – 2 systemsMaintenance overhead – 2 systems Overall RFC solution?Overall RFC solution?

1/26/2006MARFC Operational Backup13 Issues Redundancy is critical!Redundancy is critical! 1 hour into backup operations one HD on server failed1 hour into backup operations one HD on server failed –Continued with one HD with no problems

1/26/2006MARFC Operational Backup14 Issues Off-site computing capabilitiesOff-site computing capabilities If incapable of full operations support, what do you cut outIf incapable of full operations support, what do you cut out –Customers expecting information HD failure forced laptop server implementationHD failure forced laptop server implementation

1/26/2006MARFC Operational Backup15 Issues Off-site computing capabilitiesOff-site computing capabilities –Part of ER RFC Backup project –Dell 5150 “desktop replacement” laptop –1 year old –Pentium GHz –1 GB Memory –1 100GB HD; 7200 RPM ATA

1/26/2006MARFC Operational Backup16 Issues Off-site computing capabilitiesOff-site computing capabilities –Operations test 3 client laptops3 client laptops Laptop displayLaptop display Full cron loadFull cron load Morning forecast operationsMorning forecast operations

1/26/2006MARFC Operational Backup17 Issues Off-site computing capabilitiesOff-site computing capabilities –Operations test – results SlowdownsSlowdowns –NMAP initiation –Heavy disk access – e.g. Informix extractions Slower than in-house serverSlower than in-house server Acceptable by forecast staff knowing limitationsAcceptable by forecast staff knowing limitations

1/26/2006MARFC Operational Backup18 Performance Comparison Identical cron instructionsIdentical cron instructions Handoff and execution of OFS jobs from AWIPSHandoff and execution of OFS jobs from AWIPS Laptop slowdown with heavy disk access activityLaptop slowdown with heavy disk access activity More analysis neededMore analysis needed

1/26/2006MARFC Operational Backup19 updatedb, db_purge, sys_clean db_purge ???

1/26/2006MARFC Operational Backup20 Off-site Capabilities “Shoebox” server, aka ShuttlePC“Shoebox” server, aka ShuttlePC “Server-like”; luggable“Server-like”; luggable Dual CPUsDual CPUs Multi-GB memory capabilitiesMulti-GB memory capabilities 7200 RPM SATA II7200 RPM SATA II –SCSI-like performance? –Larger, cheaper than SCSI –RAID 1

1/26/2006MARFC Operational Backup21 Off-site Capabilities Less than $3000Less than $3000 –Dual 64-bit AMD Opteron, 2.4 GHz –2 GB memory –Dual 120 GB 7200 RPM SATA II RAID 1RAID 1 –GB ethernet –19” LCD –External keyboard and mouse

The End