Masroor Ahmad Sr. Water and Sanitation Specialist, WSP, WB, Islamabad PAKISTAN WATER SUPPLY AND SANITATION SECTOR STUDY PAKISTAN URBAN FORUM STUDY OVERVIEW.

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

Rudolf Frauendorfer Asian Development Bank
Good governance for water, sanitation and hygiene services
INDEPENDENT WATER SCHEMES IN SAMOA
HOUSING FOR SUSTAINABLE CITIES: COMMITMENTS AND PARTNERSHIP OPPORTUNITIES Regional Conference on Housing Policy towards Sustainable Housing Development.
May 26, 2006DNA – Mozambique 1 An Overview of DNA-WSP Partnership Mozambique By Eng. Julião Alferes The National Director of Water Affairs Ministry of.
JICA’s Cooperation for Urban Water Supply and Sanitation
Mind the Gap: East Asia - Pacific Human Resources Capacity in the Water and Sanitation sectors: Is there enough to meet future demands? Dr Regina Souter.
1 Alignment to the Local Government Turn Around Strategy (LGTAS)
STATE OF URBAN WATER SUPPLY & SANITATION SECTOR IN SINDH By Khalid M. Siddiqui DG UP&SP Sindh.
Urban and small town water supply management models in Ghana Presentation of findings from sector review and case studies from the TPP Project NLLAP meeting.
1 EECCA-wide trends of water utility performance Tatiana Efimova Helsinki, May 2007 E A P TASK FORCE.
Dr.Shereen Narejo Program Officer-Health SDSSP, Finance Department August 22, 2005 Improving Social Services Delivery To Achieve MDGs.
Mauritania MTEF Workshop Water and Sanitation Sector MTEF Experience in Uganda.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
1 city date, 2010 Jana Malinska Investment Policy Officer.
UN-Water Global Annual Assessment of Sanitation and Drinking-Water 1 | Global Annual Assessment of Sanitation and Drinking-Water GLAAS Presented by Rolf.
Common recommendations and next steps for improving local delivery of climate finance Bangkok, October 31, 2012.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
A Microfinance Solution for Water, Sanitation, and Health in Peri-Urban and Rural Areas Presented at the Fifth World Water ForumDr. Richard E. Thorsten.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
HSA 171 CAR. 1436/ 7/4  The results of activities of an organization or investment over a given period of time.  Organizational Performance: ◦ A measure.
National Development Plans Review Saudi Arabia 3 rd and 7 th National Development Plans For: Professor Habib Alshuwaikhat By: Ahmad A. Alkadi CP202 – Planning.
South Asian Conference on Sanitation (SACOSAN)-IV Pakistan Progress Update April 4 th, 2011 South Asian Conference on Sanitation (SACOSAN)-IV Pakistan.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
Infrastructure Service Delivery: An Overview. India’s infrastructure deficits Two types of deficits:  “Investment gap”: Gap between existing and required.
Innovative funding for infrastructure services: the use of Output Based Aid in the Honduras water sector Cledan Mandri-Perrott Infrastructure, Economics.
Performance Enhancement of Water and Sanitation Utilities in Kenya through Benchmarking and Collective Learning Dr Adriaan Mels - Vitens-Evides International.
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
Service delivery in the energy sector: Increasing private sector investment in generation & access PPPs in energy sector in Africa: Best practices and.
FARM Africa/SOS Sahel Ethiopia Strengthening Sustainable livelihoods and Forest Management Over view of the program April 6, 2013 Bahir dar.
PAKISTAN CONFERENCE ON SANITATION (PACOSAN) Presentation by ….. USMAN GUL 28 May 2009 FATA - NWFP.
Workgroup: Delivering and Accounting for Development Results
Addressing Financial Needs. What is the best investment we can make for India ’ s future? “ The development of children is the first priority on the country.
Kiichiro Fukasaku Development Centre
Harmonisation, Decentralisation and Local Governance.
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
PUNJAB MUNICIPAL SERVICES IMPROVEMENT PROJECT Financial Aspects Graeme Lee, SASEI.
Financial and Fiscal Commission Submission on the 2011 Division of Revenue Bill Select Committee on Appropriations 22 March 2011.
Urban Group Presentation. Commitment and Leadership Legislate Policies Increase Allocation Sanitation Champions at different levels Sanitation as a separate.
1 Jakarta, May 12, 2009 OPENING AND KEYNOTE SPEECH MINISTER OF PUBLIC WORKS REPUBLIC OF INDONESIA MINISTRY OF PUBLIC WORKS INDONESIAN-DANISH WATER DAYS.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Decentralization reforms and local development Brussels April, 2015.
Data, Surveys and Performance Monitoring by Mr Ben Freyer Deputy Director, Regional Support Services, DWSSC 22 November 2012 Ministry of Agriculture, Water.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
PAS Project 1 Benchmarking of urban water and sanitation in emerging economies Introduction CEPT UNIVERSITY.
URBAN POLICY AND GOVERANCE AND INTITUITIONS Parvez Latif Qureshi 1.
Water & Environment Sector Overview of 2016/17 Grant and Budget Guidelines Ministry of Water and Environment.
Mortgage Finance Opportunities and Challenges By Taimur Afzal, Chairman ASSOCIATION OF MORTGAGE BANKERS (AMB) March 25th
Recovery and Reconstruction in India: Future Directions
Presentation to the Portfolio Committee on Energy
Danube Water Conference 2017, Vienna
Donor Coordination Process
Sewerage and Sanitation Policies in Indonesia
Developments in our water sector policy
SALGA Comments on LG Grants Division of Revenue Bill, 2011
Bangladesh access to sanitation
«Water Sector Reform in Kenya »
Potable Water and Waste Water
Smart policies, strong utilities, sustainable services
Sri Lanka - Vision Long term vision
Punjab Drinking Water and Punjab Sanitation Policies
Viet Nam Water Management Country Status Factsheet
Ghana Water Management Country Status Factsheet
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Water Services Targets
WATER & WASTEWATER PUNJAB, PAKISTAN
Presentation transcript:

Masroor Ahmad Sr. Water and Sanitation Specialist, WSP, WB, Islamabad PAKISTAN WATER SUPPLY AND SANITATION SECTOR STUDY PAKISTAN URBAN FORUM STUDY OVERVIEW PAKISTAN WATER SUPPLY AND SANITATION SECTOR STUDY PAKISTAN URBAN FORUM STUDY OVERVIEW KARACHI JANUARY 11, 2014

Study Objectives & Scope To assess the provision of services disaggregated by province & region To provide a framework for governments to take informed decisions on improving service delivery To identify the priority areas for reform and investment Takes stock of the sector across a range of technical, financial, environmental, and institutional dimensions Identifies the key issues of the sector and draws on international experiences It is the first comprehensive study that captures both water and sanitation in both urban and rural areas across the entire country

Process & Partners National Launch of Concept – April 2012 Planning Commission – Coordination Consultative sessions with PHEDs, LGDs, PnDs, DoF, WASAs, KWSB, (selected)TMAs and CSOs in four provinces and three regions Reality check - sharing early findings with provinces & regions Soft launch of National Sector Study – April 2013 Brainstorming on What Next….

Output The sector work comprises three volumes each covering four provinces & three regions.

WaterSanitation UrbanRuralNationalUrbanRuralNational Improved Unimproved CountryYear Total Improved (%) Piped on Premises (%) Total Improved (%) Improved (%) Open Defecation (%) Bangladesh India Nepal Pakistan Sri Lanka Access to Water and Sanitation in the South Asia Region Pakistan Summary: Above average for water supply Middling for sanitation

South Asia International Comparisons WaterSanitation UrbanRuralNationalUrbanRuralNational Improved Unimproved CountryYear Total Improved (%) Piped on Premises (%) Total Improved (%) Piped on Premises (%) Total Improved (%) Open Defecation (%) Total for SAR Total for LAC Total for World Summary for South Asia: Comparable or better in access to improved water supplies Below international comparators for quality of service – piped water supply Below international comparators for sanitation

Countries with the Largest Numbers of People Practicing Open Defecation The quality of service in the rural sanitation sub sector is best considered in terms of the level of open defecation. Overall the rate of Open Defecation (OD) is 40 million people, 34% of the rural population which places Pakistan as the third largest OD country after India (626 million, 78% of rural population) and Indonesia (63 million and 55% of rural population)

Investment Requirements 9 Rs 163 Bn is estimated investment required for the three years to achieving the Pakistan’s MDG for 2015 of 100% access to water supply and 67% access to improved sanitation Estimated rural water investment was at Rs billion and rural sanitation at Rs billion giving a total rural requirement of Rs billion. This is equivalent to about 0.31% of annual GDP over the three year period with rural accounting for about 90% of the total

10 Drinking Water and Sanitation Allocations as Proportion to Provincial ADP

Urban Summary No city has 24/7 service, high risk of water-borne epidemics No utility is financially self sustaining, not even recovering OpEx 10% of wastewater is treated, leading to environmental degradation 10 % -15% consumer metering which undermines good commercial practices Current sector investment is around 0.16 percent of GDP versus international comparators in the region of 0.2 percent to 0.4 percent High levels of Non revenue water; high energy consumption costs ranging from 19-57% of operating expenditure Institutional structure is fragmented with almost nil autonomy (independent management decision making), poor governance (weak accountability reporting & monitoring) and limited financial space (compromising service quality)

Urban Recommendations Improve Institutional Autonomy and Accountability Regional utilities (intermediate towns) - NSUSC Corporate utilities (million+ cites) WSSP in Peshawar Public reporting of performance Encourage Cost Recovery from User Fees with emphasis on technical and commercial efficiency Increase the Level of Public Funding and make it contingent on delivering results (Performance Based Finance) Undertake Pilot Public-Private Partnerships (PPPs) Scale Up Wastewater Treatment to protect water sources Improve the Knowledge Gap on Service Provision (P-WOPs utilities network) Special focus on Urban Slums (CLC unit in Faisalabad – WASA)

Rural Water 13 The two main models for rural water service delivery that currently exist are the following: 1.Provincial or regional level institutions such as PHEDs in Khyber Pakhtunkhwa, Balochistan, and Sindh develop the schemes and subsequently operate them. 2.In Punjab, AJK, and FATA, provincial- or regional-level institutions such as PHEDs develop the schemes, and they are subsequently operated and maintained by community-based organizations Punjab, AJK and GB have shown very good financial sustainability with high levels of cost recovery (and in a number of cases revenues exceed operating costs). PCRWR, however, found that up to 50% of schemes are not operational Domestic Private Entrepreneurs models ?

Source Failure Major defects in machinery / rising main / distribution network / etc... Technical (49%) Non Payment of dues Revenue not matching expenditure Poor cost recovery Non-representative CBO Community conflict Theft of major components like electric motor, transformer, etc... Financial / Managerial (51%) Reasons for Non-Functioning Schemes in Sindh Diagnosis of Failure of Rural Water Supply Schemes in Punjab

 Department (PHED) is operating on “Zero” operational (O&M) budget  4100 schemes, 2870 functional  Every CBO is a mini PHED  The level of services varies from district to district and within districts Realignment & extension of rising main & networks Strong women participation Computerized billing, Rs /month bill Savings (up to 5 M) & investments Stand bye arrangements (generators, motor, pumps etc) Water % water metering CBOs NGOs “Zero” WAPDA arrears24x7 model CBOs members EntrepreneursServing as models for other provinces Punjab CBOs Model

Demand Responsive Approach to Rural Water Supplies in South Asia Communities contributing to CAPEX Communities involved in entire Scheme Cycle Communities Managing O&M Oversight Mechanisms Communities willing to PAY for WSS Services IndiaUpfront contribution ranging from Rs 300 to Rs 1,000 per HH Planning, Designing, Implementing, Managing Schemes Small Schemes: O&M managed by Village Level Committees Large Schemes: O&M contracted out Social Audits by Communities 50% to 100% O&M Cost Recovery through User Charges Bangladesh 5,000 Tk per HH (Max 10% of CAPEX) Planning and Designing Water points – Community managed; Small Schemes- Operator managed Local Government (Union Parishad) 100% O&M cost recovery from users Sri LankaMax of 10% of CAPEX Like IndiaMulti village – Local govt. Single Village - Communities NWSDB and local govt. 100% from user charges NepalCash contribution is 2.5% and total (with in-kind ) is 20%) AllCommunity level schemes – managed by WSUCs (user committee) Dept of Water Supply and Sewerage (mandated) 100%

How is Rs 100 spent? D ATA FROM C OST E FFECTIVENESS S TUDY

Rural Recommendations Roles and Responsibilities of Key Agencies must be clarified and CBOs given a Central Role Long term backstopping needed for sustainability Investment support programs from (Federal and Provincial Levels) should be expanded and focused on the delivery of outcomes Reinforce Policies of O&M Cost Recovery from User Fees Introduce Training and Capacity Building to Support Transitions to New Roles Begin to Address Knowledge Gaps – particularly the high level of non-functionality Target Outcome achievements in Sanitation Sector through PATS Develop sector-wide M&E system

What Next ( ) Supporting Provinces/Regions/utilities in implementing recommendations National Programmatic Support TA – (Technical Advisory Program – TAP) Focus on developing results based, financeable, opportunities, e.g. 1.Performance based leakage reduction in urban areas 2.Wastewater treatment PPPs 3.Root cause assessment of non-function RWSS schemes as pre-cursor to performance based rehab financing

THANK YOU

Urban Cities & Population By 2030, about 50 percent of Pakistan’s population, or about 137 million people, will be living in urban areas Number of million+ cities will increase from 8 in 2012 to at least 12 Population density quadrupled from 42 persons per kilometer in 1951 to 166 persons in 1998 About 40 percent of the population in the larger cities currently live in katchiabadis (Planning Commission)

Characteristics of Well Performing Utility Well run water service providers tend to have: Autonomy—financial and managerial—to operate the provider without undue interference on a day-to-day basis and in the long-term interests of the community Accountability—to a range of stakeholders to demonstrate that they provide the services and performance expected of them, whether that performance be technical or financial Customer orientation—to ensure that the provision of service to customers is the focus of management and staff Market orientation—to ensure that the service is provided as efficiently as possible and thus minimizes costs to both customers and government (as a sector financier).

NWSC Key Achievements (from Audited Accounts of NWSC, 1998 to 2012) 24 Performance Indicator Service Coverage48%77% Total Connections50,826295,000 New Connections per year3,31723,400 Metered Connections37, ,730 Staff per 1000 Connections366 Collection Efficiency60%96% NRW50%32.6% Proportion Metered Accounts65%99.0 % Annual Turnover (Billion Shs)21155 Surplus (Before. Dep.) (Millions USD) 4.0 (loss)13.8 (Surplus) or Ushs 36.1 billion

25 PSLM (Population in 2012 = 183.5M) JMP 2012 update (Population in ) Province/RegionPunjab % (Million) KP % (Million) Sindh % (Million) Baluchistan % (Million) AJK % (Million) FATA % (Million) w/o access to improved water (Urban ) 9% (4.1M) 8% (0.3M)4% (1M)4% (0.1M)15% (1M)NA4% (6M) Level of Water Service in Province/Region

26 Urban water coverage in 2010 is just below the 2015 target of 97%, and urban sanitation is well below with 2010 coverage at 72% versus a 2015 target of 86% Pakistan Water Supply Coverage Estimates Urban (%)Rural (%)Total (%) Improved Water Piped on premises Other unimproved Unimproved Pakistan Sanitation Coverage Estimates Urban (%)Rural (%)Total (%) Improved facilities Shared facilities Other unimproved Open defecation National Coverage

Cost inefficiencies higher in Supply driven Schemes (Piped Water) D ATA FROM C OST E FFECTIVENESS S TUDY

Institutional Arrangement & Sector Actors/Institutions The 1973 Constitution assigns policy, planning, and financing responsibility to provinces and service provision to LGs The 18 th amendment has resulted in fiscal, administrative and functional decentralization of several sectors to provinces Currently, five actors are providing services across the country: Households (self provision). According to the PSLM , at least 46% in urban areas and 84% of households in rural areas receive water through hand-pumps, motor-pumps, and dug wells in urban areas. According to the MICS 42% of households in urban areas and 95% in rural areas are not connected to a public sewer in urban areas Communities operate and maintain (O&M) of smaller rural water supply and sanitation systems PHED is responsible for construction and major O&M of rural water supply and sanitation, and construction and major O&M of urban water supply and sanitation. PHEDs are responsible for all engineering works for rural and urban areas except for the million+ cities WASAs/KWSB Million+ cities of Lahore, Faisalabad, Gujranwala, Rawalpindi, Multan & Quetta have WASAs and Karachi has KW&SB as service providers Municipalities Intermediate towns have municipalities/municipal administrations as service providers

- Slide 5 on institutional arrangements should come after Slide 6 Access to W & S in the South Asia area. Best to bring in the regional context up front. Island of success & achievements like UU Punjab to Sindh to KP, OPP in Karachi, Corporate Urban utility in Peshawar no mention on OPP?