Project Manager: Rajiv Chalasani Mark Goesmann Kevin Staake David Nyman Client : Dr. Lynn Beck Department of Economics.

Slides:



Advertisements
Similar presentations
Point of Sale (POS) Client & Back Office Server. Operational Concept What is our Objective? What is our Objective? What are our Goals? What are our Goals?
Advertisements

GNU / Linux A free operating system. Summary History What can you find on a Linux OS Linux Economy.
PROJECT IN DISTRIBUTED SYSTEMS IPERF FOR ANDROID Developers: Shir Degani, Yuval Degani Supervisors: Prof. Roy Friedman, Alex Kogan.
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
Chapter 8 Designing with Cascading Style Sheets. Chapter 8 Topics Building three different types of complete Web pages using CSS: Build a style sheet.
Systems Analysis and Design in a Changing World, 6th Edition 1 Chapter 6.
The project plan. December 16, Agenda The project plan –Risks –Language decision –Schedule –Quality plan –Testing –Documentation Program architecture.
Uninstalling Sectra & Installing Merge PACS DO NOT uninstall Sectra Before August 21,2011 “GO LIVE”
Thesis Proposal Virtual Reality in Construction Cost Estimating By: Mandy Frazure Date: 5/12/04.
CryptKeeper Project Plan 1 CryptKeeper Project Plan.
A brief overview of the project By Group 2 Barry Amir Bhumi Shubh.
A brief overview of the project By Group 2 Barry Amir Bhumi Shubh
Copyright © Team #4 CSCI 6838 Spring Ad Hoc Graphical Reports CSCI Research Project and Seminar Team #4 March 1, 2007.
Web Platform Performance Analysis for AOL Team #4 ECE 498A Spring 2004.
Requirement Analysis Functional & Non-Functional Requirements Scenarios Use cases: – View Fixtures – Manage Tournament – Register Team – Report Discrepancy.
Incell Phonium Processor Project Plan Document Dale Mansholt Aaron Drake Jon Scruggs Travis Svehla.
SIUE Injury Tracking System Project Plan. Team Members: Robbie Marsh Robbie Marsh –Project Manager/Webmaster Ken Metcalf Ken Metcalf –Lead Programmer.
Managing Software Development With Microsoft ® Project 2000 And Team Folders Sam Brooks
Project Manager: Rajiv Chalasani Mark Goesmann Kevin Staake David Nyman Client : Dr. Lynn Beck Department of Economics.
WaveMaker Visual AJAX Studio 4.0 Training Installation.
. Client : Dr. Lynn Beck Department of Economics.
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Team and Client Rajiv Chalasani- Project Manager Mark Goesmann – Lead Designer Kevin Staake – Lead Implementer Dave Nyman – Quality Manager Client : Mr.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
1 R.O.M.P Robot Orientation Mapping Project (Project Plan) Team Evolution Peri Subrahmanya: Lead Designer Michael Lazar: Project Manager Sean Hogan: Lead.
Accomplishments: Implementation Login form Dictionary Inputs Calculations(Partially Completed) Output(Partially Completed) Made a test database.
Project Dragon Small Business Website Content Management System.
Archivists’ Toolkit: Introduction March 12, 2007 Jody Lloyd Thompson.
AutoTester & UAT Automation Framework By SSTZ-UAT.
MSE Presentation 1 By Padmaja Havaldar- Graduate Student Under the guidance of Dr. Daniel Andresen – Major Advisor Dr. Scott Deloach-Committee Member Dr.
Ad Hoc Graphical Reports Ad Hoc Graphical Reports Copyright © Team #4 CSCI 6838 Spring CSCI Research Project and Seminar Team# 4 (
GOAL User Interactive Web Interface Update Pages by Club Officers Two Level of Authentication.
Unified Distributed (UDub Mail) Life Cycle Objectives Sachin Pradhan Gabriel Maganis.
In the BeginningIn the Beginning. Blockhead Ken Kenney Lead Programmer Program Documentation Seth W. Phillips Team Leader Lead Documenter Jay McCullough.
The Juggernaut Team Tyler Douthitt  Project Manager  Lead Website Developer Mike Harman  Lead Programmer Eric Rakers  Lead Documenter  Lead Analyst.
The basics of knowing the difference CLIENT VS. SERVER.
Reconfigurable Communication Interface Between FASTER and RTSim Dec0907.
By, Rutika R. Channawar. Content Introduction Open Handset Alliance Minimum Hardware Requirements Versions Feature Architecture Advantages Disadvantages.
Thrdplace Social Networking Team #7 1. TRR Outline Operational Concept Overview System benefits to Customer 1.Introduction Demo of System Operational.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
NAVSEA Liaison Scott Huseth Faculty Advisor Dr. Jiang Guo Team Members Areg Abcarians David Ballardo Niteen Borge Daniel Flores Constance Jiang June 3,
Basics Components of Web Design & Development Basics, Components, Design and Development.
Introduction of Wget. Wget Wget is a package for retrieving files using HTTP and FTP, the most widely-used Internet protocols. Wget is non-interactive,
ISS Team Group Member ◦ Nguy ễ n Nh ậ t Minh ◦ Nguy ễ n Kh ắ c Khu ◦ Ph ạ m Ng ọ c Hi ế u ◦ Nguy ễ n Ng ọ c Khánh ◦ Nguy.
ISYS 350 Building Business Applications
2009 printable calendar 2009 January 2009 February 2009 March 2009 M T
2013 printable calendar 2013 S F T W M January
Multilevel Marketing Tree Viewer
S F T W M January
ISYS 350 Building Business Applications
ISYS 350 Building Business Applications
Presenting: Aimee & Catherine.
2019 printable calendar 2019 January 2019 February 2019 March 2019 M T
ISYS 350 Building Business Applications
Chapter 3 Hardware and software 1.
2020 printable calendar January 2020 February 2020 March 2020 M T W F
ISYS 350 Building Business Applications
ISYS 350 Building Business Applications
2017 printable calendar 2017 January 2017 S F T W M February
Chapter 3 Hardware and software 1.
2016 printable calendar 2016 S F T W M January
2009 printable calendar 2009 January 2009 February 2009 March 2009 M T
2016 printable calendar 2016 S F T W M January
2010 printable calendar 2010 January 2010 February 2010 March 2010 M T
printable calendar 2008 January 2008 February 2008
2014 printable calendar 2014 S F T W M January
2015 printable calendar 2015 S F T W M January
2013 printable calendar 2013 S F T W M January
Power Market Game.
from Lutz Dietrich and Hans Kluge
Presentation transcript:

Project Manager: Rajiv Chalasani Mark Goesmann Kevin Staake David Nyman Client : Dr. Lynn Beck Department of Economics

Overview User Interface Main architecture Subsystems Database Class Diagram Development Tools Lifecycle Milestones Conflict Resolution and Risk Activities and Ethics

User Interface Log in screen Main forms Tabs Navigation pane Input devices Database viewer Sequential steps Out put Summary Printable Savable Viewable

Prototype

Main architecture Minimum Requirements 64mb ram, 512mhz processor Windows 2000 or equivalent Unix OS Software Requirement (JRE 5) Browser that supports Java Virtual Machine

Subsystems Database Access Modify GUI Takes input Shows output

Database Class Diagram

Web site Information about our project Web version of application Stand alone for download Help

Development Tools Java Swing GUI toolkit MySQL NetBeans Using JDK 6 Subversion Bugzilla

Lifecycle

Work Distribution Domain Walkthrough Design Design Inspection Code Code Inspection Promote To Build 1%40%3%45%10%1%

Milestones DateDescription March 27Have time line, and other diagrams done April 10Have a “paper” prototype done and main overall model April 24High fidelity prototype - features list and design features May 8Have a working high fidelity prototype and final presentation August 28User test on high fidelity September 11Make changes and start GUI and features A September 25GUI done and approved and features B October 9Work on background code October 23Have a working version of the program and features C November 6Web applet done and features D November 20User test December 4 More user test and final touches December 18Deliver end product to client and final presentation

GANTT Chart

Organization Rajiv Chalasani Planning, Process, Website Mark Goesmann Customer Interface, Design Kevin Staake Implementation, Test Dave Nyman Quality, Co-Test, Support

Conflict Resolution 1. If conflict arises team will vote. 2. If vote ends in tie the team leader will decide best action 3. If conflict unresolved go to boss

Risk LikelihoodCostPlan Temporary Loss of Team member 100%3-7days Redistribute work evenly to other members New features wanted by client 10%3 days Revisit high level design, decide whether the changes are reasonable Inexperience with Features of Java/Netbeans/mys ql 80%7 daysStudy documentation on the feature needed to be used.

Activities Learn HTML and CSS Learn Java Learn MySQL Familiarize ourselves with NetBeans

Ethics ACM Code of ethics Be respectful Produce reliable software

Any Questions? Thank you for your time and consideration