Chapter 22 Selecting Interior Finishes

Slides:



Advertisements
Similar presentations
Interior Finishes: Part Two
Advertisements

BUILDING CONSTRUCTION
UNIVERSITY of NORTHERN COLORADO HOT WORK PROGRAM.
Background Surface Treatments
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Chapter 24 Finish Ceilings & Floors
Acoustics 5 Materials Rino D.A. Fernandez, uap Class Instructor.
Fire-Resistive Construction (2nd part)
Installation of Mechanical and Electrical Services
Unit 10 Interior Finishes Part Illustrated Words and Concepts Figure 10-1 The Arrangements for Building Services of a Three-story Office Building Figure.
WOOD LIGHT FRAME CONSTRUCTION
Summary of NFPA 101 Interior Finish Requirements
Interior Finishes: Part One
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Skyscraper Construction
INTD 51 human environments building systems. heating/ventilation/air-conditioning (HVAC) maintain a comfortable indoor climate control temperature and.
Chapter 20 Cladding with Masonry & Concrete
Chapter 23 Interior Walls & Partitions. Interior Partitions Performance Criteria  Strength  Fire Resistance  Durability  Acoustical Isolation Materials.
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE DESIGN OF BUILDINGS VULNERABLE GROUPS. COMPONENTS OF FIRE building materials unattended stoves Loose electrical connections overloaded electrical.
Chapter 4: Air Leakage Control: Materials and Techniques
Wall Coverings  Selected according to: ○ Function ○ Size ○ Existing furnishings ○ Budget ○ Maintenance.
Presented by Edgar Furtado & David Vella FIREPLACE & FLUE REPLACEMENTS 1359 WHITE OAKS BLVD., OAKVILLE.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
2009 Annual Conference September 22, 2009 Tom Skebey, CFM.
Chapter 27 Insulating Structures. Objectives After reading the chapter and reviewing the materials presented the students will be able to: List the ways.
 Helps to prevent the transfer of heat either into or out of a building  Winter – keep heat in  Summer – keep heat out  Heat is transferred through.
Summary of Energy Star Site Inspection July 11, 2007
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Partitions Compartmentation One area of a building is separated from another by the use of fire rated materials System that creates self contained areas.
2009 The Physical Environment
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
HAZARDS IN THE HOME. Environmental Hazard Radon Asbestos Lead Hazardous Waste Carbon Monoxide.
Finishing the Building
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
DRAWING ON EXPERIENCE … BUILDING ON STRENGTH Six Storey Wood-Framed Buildings Unique Structural Opportunities & Challenges Kurt Ruhland, P.Eng. Director,
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
ART 2640, Building Systems of Interior Environments Fall Semester 2014 Tuesdays & Thursdays 9:00-10:20 Grover Center W314 Matthew Ziff, Associate Professor.
6 Building Construction. 6 Objectives (1 of 3) Describe the characteristics of the following building materials: masonry, concrete, steel, glass, gypsum.
Fire Safety By Alicia Civile and Alexandra Fernandez.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Case Study: The Chapman Graduate School of Business Nicole Figueroa/ Kamilah Bermudez/Elizabeth Berryman Acoustics Assignment #5.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
Design Development Code analysis Partition types.
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
Fire-Resistant Materials & Assemblies Part 2 Chapter 5.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
COMMUNICATIONS AND CONTROL SYSTEMS. Interior Designer must know: Client’s priorities How space will be used Where equipment is located Location of phones,
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
1/21/2016D.S. Sachdev1 Internal Cladding Systems in Buildings.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
APPLICATIONS OF TECHNOLOGY
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
Ceilings and Ceiling Systems
How Completed Interiors Are Achieved: Designing & Building
SURFACE FINISH.
NFPA 600, INDUSTRIAL FIRE BRIGADE Module : 11 BUILDING CONSTRUCTION.
INTD 503- Materials Topic: ceilings
Commercial Construction Projects
INTD 503- Materials Topic: Partition Walls
Arch205 building construction wall systems
Suspended ceiling.
FBE04 BUILDING CONSTRUCTION AND MATERIALS
Minuteman Vocational Technical Regional High School Progress
Ceilings and Ceiling Systems
Building standards Mr. Da Silva.
Presentation transcript:

Chapter 22 Selecting Interior Finishes

Finishes Functional Parameters Durability Acoustical performance Fire safety Relationship to mech. & elect. services Changeability Fire resistance Aesthetics Design compliance / enhancement

Interior Finishes One of the purposes - Conceal or accommodate the building services Equipment & distribution systems: Mechanical (HVAC) Plumbing (water, sewer,storm) Sprinkler Electrical (power, communication, etc.) Vertical transportation Others: computer connections, vacuum, etc.

MPE System Installation Shafts - vertical runs of pipe, duct, wiring, elevators, etc. Concealment and prevention of fire migration Suspended Ceilings - Horizontal runs of MPE Floors - services cast into floor, access flooring Plumbing Chases - water, sewer Mechanical Spaces - rooms, penthouse, roof, basement, mezzanines

Horizontal runs of Piping Horizontal Runs of Duct

Overhead Rough-in: High Rise Corridor Sprinkler Duct Duct Cable Tray Electrical Plumbing Overhead Rough-in: High Rise Corridor

Overhead Rough-in; Low Rise Hotel Corridor Electrical Cable TV Plumbing Sprinkler Unistrut Overhead Rough-in; Low Rise Hotel Corridor

Plumbing Chase

Plumbing Underground

MPE Rough-in for Elevated Slab Electrical Plumbing Sleeves

Partition Rough-in Plumbing Electrical

Partition Framing to Conceal Fan Coil Unit

Rooftop Equipment HVAC Equipment Heating & Cooling

Cooling Tower (“ground” or roof mounted) HVAC Equipment Cooling Tower (“ground” or roof mounted)

Roof Top Mechanical & Electrical Space (concealed)

Fiberglass Construction - Communications Transmission

Mechanical Equipment Room

Electrical Panels

Interior Finishes Sequence Overhead Rough-in (duct, pipe, electric home runs/service) AND MPE Vertical Distribution Systems (plg, duct, elec.) Partition Framing (CMU, metal framing) Partition Rough-in (plg, elec., communications, etc.) Ceiling Framing & Rough-in (DW, acoustic grid, lights, HVAC, etc.) Cabinetry, Built-in equipment and furnishes Ceiling Finishes, Wall Finishes, Floor Finishes Sequence depends on: Type of materials / systems used

Interior Finishes Sequence Primary Considerations for Sequence: Need for subsequent operations - framing/RI Priority for Location EX. - electric pipe vs. sewer Durability of material Ability to withstand unconditioned Space- cabinetry/doors Ability to withstand construction abuse - soft vs. hard tile Project Schedule Requirements Availability - lead time, field measurements

Considerations for Selecting Interior Finishes Appearance Durability & Maintenance Acoustic Criteria Fire Criteria Relationship to MPE services Changeability Cost Toxic Emissions

Appearance Present / Carry out a particular Concept Interior space - usage, feel, form, etc. Lighting Color Pattern Texture etc.

Durability & Maintenance “Highly durable finishes generally cost more…” Selection generally determined by “need”/use Intensity of use - “wear & tear” Water resistance requirements Cleanliness & maintenance requirements Examples “hard” flooring in an airport vs. carpet in an office drywall ceilings in a hospital vs. acoustic in retail/office CMU in public restrooms or mechanical room vs. drywall VWC in a corridor vs. paint

(They absorb or reflect sound - space use typ. determines) Acoustic Criteria “Interior finish materials strongly affect the quality of listening conditions and the levels of acoustic privacy inside a building.” (They absorb or reflect sound - space use typ. determines) Sound Transmission Class (STC) of Partitions A measure of sound transmission Full scale testing to determine STC rating Can also use a field test to verify Requires - proper construction partition, sealing MPE penetrations, doors, etc.

Acoustic Criteria Ways to Reduce Sound Transmission Proper selection of materials / components Floors, ceilings & walls Proper installation Sound absorbing insulation Resilient partition mountings Isolation of equipment

to reduce sound transmission Sound Insulation and Resilient Mountings to reduce sound transmission

Cement/Gypsum Self-Leveling Floor Covering to ‘Insulates’ floor and Seals joint between partitions & floor Cement/Gypsum Self-Leveling Floor Covering to reduce floor-to-floor sound transmission

Equipment Isolation Mount

“smoke, not heat, is the primary killer in building fires” Fire Criteria Typically governed by Building Codes Concerned with: Combustibility Flame spread (how quickly fire spreads / material burns) Fuel Contributed Rating (combustibility of material) Smoke Developed Rating (smoke contribution) “smoke, not heat, is the primary killer in building fires” Fire Resistance

“Smoke” caulking @ MPE penetrations

Fire Resistance Ratings Full Scale Tests to determine an assembly’s rating Must maintain physical & structural integrity Not permit passage of flame or hot gases Insulate to keep cool the side not exposed to the fire Openings Restricted in size Must be protected to prevent passage of fire/gases Doors - rated Duct - Fire/smoke dampers Piping - sleeves and sealant

Pneumatically Operated Fire Damper Fire Damper with Fusible Link

Rated Opening in Exit Corridor

Rating Label on Corridor Doors

Changeability How permanent are the interior finishes? Office, Retail Changes in services and finishes often Lighter, easily changed construction materials acoustic clg., drywall, moveable partitions, carpet, etc. Government Building, Theater Changes in services and finishes less often / seldom Heavier, harder to change construction materials drywall clg., plaster, CMU, stone, hard tiles

Cost First (initial) Cost Life-Cycle Cost Installed cost Highly important with tight budget and/or short life Life-Cycle Cost First cost + maintenance + replacement + energy costs Important if: Building useful life is long Ownership is retained over an extended period Budget considerations allow higher initial cost

Toxic Emissions of Materials Solvents, finishes, etc. Airborne fibers Susceptibility to mold/mildew Radon Gas Sick Buildings

Trends in Interior Finish Systems Components vs Single system Constructed to accommodate change EX: partitions anchored to grid, modular Heavy to Lighter Materials EX: plaster/CMU to drywall, hard tiles to vinyl/carpet Less dead load, often less cost Wet systems to “Dry” systems Plaster to gypsum drywall to acoustic Terrazzo to hard tile to carpet/vinyl