ARCH-432 Vapor Retarders and Air Barriers Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain.

Slides:



Advertisements
Similar presentations
Heating Losses- Infiltration and Ventilation
Advertisements

The Building Skin: SPAIGR
HEAT LOSS & HEAT GAIN HEAT FLOW. Heat flows from high temperature to low temperature There are 3 types/methods of heat flow/transfer: 1.Conduction- through.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Building Science Basics WEATHERIZATION INSTALLER/TECHNICAN FUNDAMENTALS.
VI. GREENHOUSE COVERINGS A. Selection - factors to consider 1. Photosynthesis –Transmission vs plant reception 2. light quality – nanometers.
Building Envelope. Energy Conservation House design and orientation Lifestyle changes Energy efficiency.
1 Trade Skills HVACR116 Fiberglass Duct Board and Insulation Material.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
“Do not take anyone’s advice as to how this building should be assembled.”
Heating Systems Forced Air Systems.
Department of Energy Energy Savers PowerPoint: Heating and Cooling 4 of 12.
“Sustainable Building Systems and Construction For Designers” Chapter 7: Walls.
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Heating and Air Conditioning I
The House as a System 1. Systems in a Home Electrical Plumbing Comfort Control (HVAC) Structural Moisture Control Air Infiltration Thermal Insulation.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
The Three Tiered Philosophy
WALTER SCARBOROUGH CSI CCS CCCA SCIP AIA D+D Specifiers Series Sponsored by Air Barriers.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Energy Movement WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Station 4 ?? Temperatures and Moisture Moisture Meters Pin Contact Data Loggers Spot Temperature Meter Thermal Imager Cautions and Safety.
Assumptions about Indoor Environments Mark Lawton P.Eng Patrick Roppel M.A.Sc.
1 Meeting ASHRAE Fundamentals, Standard 55 & 62.1 with Chilled Beams Displacement Ventilation.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – July 2012eere.energy.gov Moisture Barriers WEATHERIZATION INSTALLER/TECHNICIAN FUNDAMENTALS.
The House as a System 1. Air Temperature and Water Vapor.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Attic Ventilation WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Conduction Cooling Loads
HVACR416 - Design Air Distribution Air Properties and Behavior Important properties of interest include: o Weight of air. o Manner in which air.
Heat Loss & Gain Calculations 1. How Heat Moves in Homes Conduction is the transfer of heat through solid objects, such as the ceilings, walls, and floors.
This 12 part PowerPoint series is taken directly from Energy Savers Booklet, Tips on Saving Energy & Money at Home, U.S. Department of Energy.
Heat Loss HVAC CNST 305 Environmental Systems 1 Dr. Berryman.
Heat Transmission HVAC CNST 305 Environmental Systems 1 Dr. Berryman.
Standardized Curriculum WAP Training Plans and Resources.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Chapter 4: Air Leakage Control: Materials and Techniques
Chapter 3: The House as a System To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Building science.
Chapter 27 Insulating Structures. Objectives After reading the chapter and reviewing the materials presented the students will be able to: List the ways.
 Helps to prevent the transfer of heat either into or out of a building  Winter – keep heat in  Summer – keep heat out  Heat is transferred through.
HVAC523 Heat Gain. Heat First law of thermal dynamics states that HEAT TRAVELS FROM HOT TO COLD. 95 degree outside air will flow through the building.
National Tribal Forum on Air Quality Co-Sponsored by: Institute for Tribal Environmental Professionals & National Tribal Air Association.
Indoor Air Quality Diagnostic Tools for Tribal Professionals Building Science Review 1.
1 HVACR416 – Design Principles Air Exchange. 2 HRV’s (Heat Recovery Ventilators)
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – December 2012eere.energy.gov Energy Movement WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Objectives Compare locations in North America Potential for moisture problems Different driving forces Analyze potential for moisture problems in cooling.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
ASHRAE A Ventilation Standard for Residential Structures Ventilation and Acceptable Indoor Air Quality in Low- Rise Residential Buildings.
Moisture Transport Quantitatively and qualitatively describe transport by 1.Liquid flow 2.Capillary suction 3.Air movement 4.Vapor diffusion.
Insulation and Infiltration
HVACR416 - Design IAQ / Ventilation / Pathways. Ventilation Most air handling units distribute a mix of outdoor air and re-circulated indoor air. Some.
Heating Systems.
Lecturer prof. Iskandarova GT. 1. Hygienic requirements for heating, 2. Comparative evaluation of sanitary heating systems, radiant systems and air heating.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
1 Indoor Air Quality: Mold Jim Woods Air Quality Specialist Makah Air Quality Project Makah Tribe.
Air Leakage and Water Vapor Control Chapter 6. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
3/11/2004 Objectives Analyze potential for mold and condensation in different climates and different building types Describe moisture transport in buildings.
Building Envelope. Physical separator between interior and exterior spaces – Walls – Floors – Roofs – Fenestrations (any opening in the structure) – Doors.
Objectives Compare locations in North America Potential for moisture problems Different driving forces Analyze what motivates building codes Read Lstiburek.
VENTILATION AND FENESTRATION
Day 3 Part 3 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
GCSE ENERGY; THERMAL ENERGY TRANSFER 2
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010eere.energy.gov Moisture Assessment WEATHERIZATION ENERGY AUDITOR SINGLE FAMILY.
Draught Finder Trevor Clark 3. WIND, AIR & VAPOUR BARRIERS Qualified
Thermal mass dynamics 1.00 Heat absorption
CHAPTER 3 VENTILATION.
Details These are drawings of specific elements where the designer wants to provide more detailed information than can be seen in the larger drawings.
A Ventilation Standard for Residential Structures
Presentation transcript:

ARCH-432 Vapor Retarders and Air Barriers

Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain B. Rome C. Greece D. Turkey E. Macedonia

Add Infiltration Through Open Door Determine Door Usage ת = Number of People per Minute Determine CFM per person (D) CFM = ת x D

Infiltration by Crack Method Add CFM from Crack losses to CFM for Open Door losses

Mitigate These Losses How do you reduce or mitigate these losses?

Mitigation Strategies Pressurization Q S = 1.1 x CFM x (T 2 – T 1 ) Vs. Q S = 1.1 x (CFH/ft of crack x ft of crack)/60 x ΔT You own the variables!

LEED Points Available Environmental Quality (EQ) “Ventilation” Credit 1 – Install permanent CO 2 monitoring system with feedback to ventilation system Credit 2 – Ventilation system 30% above ASHRAE Standard 62.1

Infiltration Variables Wind velocity and direction Stack effects Corner rooms Exhaust fans on or off Pressure zoning Frequency of use Maintenance

Stack Effect

What You Need To Know The cause and effects of infiltration and exfiltration on moisture migration

What Do You Need To Be Able To Do Be able to calculate the dew point within a composite wall or ceiling Properly place an air barrier in a wall Properly place a vapor retarder in a wall, if one is needed

Terms Temperature gradient Vapor barrier Vapor retarder Air barrier

Design Goals Keep water from getting in Let water out if it gets in Wetting prevention versus drying Select materials and locate vapor retarders to allow the assembly to dry Different for each climate zone

Temperature Gradients The temperature differential between two separate surfaces as heat transmits across them. A Proportional calculation  Uses Indoor/outdoor DB Temperatures  R values Purpose  Determine surface temperatures MRT Dew Point

Thermal Breaks Significantly reduce the Resistance of the wall assembly

Concrete Wall

Failure Analysis Prof. Kirk’s one-of-a- kind, surefire process guaranteed to result in a mind- numbing law suit.

At inspection, you see… North Side Siding warps Siding pulled away

You see… North Side Windows You note that the snow extends into the closet

Check for condensation within walls -20 o 10 o 0 o -10 o 20 o 30 o 40 o 50 o 60 o 70 o 80 o F Temperature Heat Transmission and Exfiltration (ventilation) Infiltration IA: DB=75 o F WB = 56 o F OA: DB=-5 o F DP: 39 o F

Definitions Vapor Retarder – The element that is designed and installed in an assembly to retard the movement of water by vapor diffusion Class I –.10 perm or less Class II –.10 perm to 1.0 perm Class III – 1.0 perm to 10.0 perm Vapor Barrier – A Class I vapor retarder

Air Barrier Air barriers are systems of materials designed and constructed to control airflow between conditioned and unconditioned spaces An air barrier is not necessarily a vapor barrier (i.e., they can be permeable)

Air Barrier Rules Water vapor moves from the warm side of building assemblies to the cold side Climate dependant Season dependant  In cold climates (winter) humid indoor air can condense inside a cold wall  In hot and humid climates (summer) humid outdoor air can condense inside a cold wall

Air Barrier Rules In hot and humid climates, place the air barrier/vapor retarder on the outdoor side of the insulation or wall sheathing In very cold climates, place the vapor barrier on the indoor side of the insulation

Placing Air Barriers For a climate that is both hot/humid and cold, where do you place the air barrier?

Construction and Installation The air barrier on the outside must be continuous Individual sheets must be taped together Entire sheet must be taped to all window and door frames, foundations and roofing

Construction and Installation Dry all material before interior finish is applied Problems often occur on accelerated or fast-track projects Seal all ductwork and its connections

Placing Vapor Retarders Air barriers are more effective than Vapor Barriers Vapor permeation is minor compared to infiltration Vapor retarders make a wall more fragile Vapor retarders can prevent seasonal drying Vapor retarders can be very important Cold climates Any building with a high indoor moisture level

Goal Keep high humidity out of the walls

Placing Vapor Retarder Guidelines Locate only on the warm side of the wall (except basement) Avoid vapor barriers where vapor retarders will work Avoid vapor retarders on both sides of assemblies Avoid vinyl wall coverings on the inside of air- conditioned assemblies Avoid polyethylene vapor barriers, foil faced batt insulation and reflective radiant barrier insulation on the interior of air-conditioned assemblies

Placing a Vapor Retarder 1A – Very hot, humid 1B – Very hot, dry 2A – Hot, humid 2B – Hot, dry 3A – Warm, humid 3B – Warm, dry 3c – Warm, marine 4A – Mixed, humid 4B – Mixed, dry 4C – Mixed, marine 5A – Cool, humid 5B – Cool, dry 5C – Cool, marine 6A – Cold, humid 6B – Cold, dry 7 – Very cold 8 - Sub arctic

Vapor Barriers Where would you put a vapor retarder in the proposed assembly?

Cold and Very Cold Climates Open cell

Drainage Planes Weep holes and slots They allow the wall to drain  From leaks  From condensation

What about Concrete Floors