1 August 23, 2010 Jefferson Lab Status Hugh Montgomery.

Slides:



Advertisements
Similar presentations
U.S. Department of Energy’s Office of Science Dr. Raymond Orbach February 25, 2003 Briefing for the Basic Energy Sciences Advisory Committee FY04 Budget.
Advertisements

February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
Output from this Series of Workshops: A science vision for the RHIC future 1.Provide a science case for the future RHIC program that makes clear its importance.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Jefferson Lab Strategic Plan Bob McKeown User Meeting June 8, 2011.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
Thomas Jefferson National Accelerator Facility Secretary of Technology Page 1 Jefferson Lab Overview Deb Magaldi Public Affairs
SURA Jefferson Laboratory Committee report J. L. Matthews, Chair Massachusetts Institute of Technology November 5, 2004.
1 January 10, 2011 Jefferson Lab Status Hugh Montgomery.
Bob McKeown Presentation to SoLID Collaboration March 22, 2013 Jefferson Lab Update.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
BESAC Dec Outline of the Report I. A Confluence of Scientific Opportunities: Why Invest Now in Theory and Computation in the Basic Energy Sciences?
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility CWL SURA.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Director’s Comments on the BNL Strategic Plan RHIC/AGS Users Meeting May 29, 2008 Steve Vigdor, filling in for Sam Aronson.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Swapan.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
1 June 8, 2008 Users Group Annual Meeting Hugh Montgomery.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
Jefferson Lab Overview Bob McKeown April 20, 2015.
Thomas Jefferson National Accelerator Facility Page 1 August 22, 2011 Jefferson Lab PAC Laboratory Overview Hugh Montgomery.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Jefferson Lab’s Enabling Technologies: A Call for Strategic Planning W. OREN JLAB Engineering Division 9 February 2012.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  WBS’s  WBS 1  Funding profile  Schedule  Critical.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Argonne Accelerator Institute Activites Rod Gerig Argonne May 18, 2007 Presentation to the Fermilab-Argonne Directors’ Collaboration Meeting.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
1 Jefferson Lab Organization – December 2009 Director Accelerator Science Advisory Comm. Nuclear Physics Program Adv. Comm. Photon Science Program Adv.
1 CF lab review ; September 16-19, 2013, H.Weerts Budget and Activity Summary Slides with budget numbers and FTE summaries/activity for FY14 through FY16.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
GlueX Collaboration Meeting
Jefferson Lab Overview
Future Trends in Nuclear Physics Computing Workshop
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Preparations for a Lehman Review
Introduction to Jefferson Lab
View from Lab Management HPS Collaboration Meeting
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Scientific Computing Strategy
SOLID Collaboration Meeting
SNS-PPU upgrades the existing accelerator structure
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
Perspectives from DOE NP
Presentation transcript:

1 August 23, 2010 Jefferson Lab Status Hugh Montgomery

2 Outline Jefferson Lab Nuclear Physics Strategic Plan/Vision Laboratory Organization and Personnel Other Laboratory Activities and Issues Longer Term Future Summary

3 Jefferson Lab At-A-Glance Created to build and Operate the Continuous Electron Beam Accelerator Facility (CEBAF), world- unique user facility for Nuclear Physics –Mission is to gain a deeper understanding of the structure of matter Through advances in fundamental research in nuclear physics Through advances in photon science and related research –In operation since 1995 –1,258 Active Users (World’s largest Nuclear Physics User Community) –159 Completed Experiments to date; ~21 remaining in 6 GeV program –Produces ~1/3 of US PhDs in Nuclear Physics (334 PhDs granted, 226 more in progress) Managed for DOE by Jefferson Science Associates, LLC (JSA) Human Capital: –720 FTEs (at 3/15/10) –22 Joint faculty, 19 Post docs, 30 Undergraduate; 47 Graduate students –1,258 Users (end of FY09) –1,110 Visiting Scientists K-12 Science Education program serves as national model Site is 169 Acres, and includes: –63 Buildings; 685K SF in DOE Buildings –Replacement Plant Value: $318M FY2010 Total Lab Operating Budget: $124.1M Non-DOE Budget: $5.0M

4 Vision, Mission, Strategy Vision Mission Strategy To be the provider of choice for world-class science and facilities in support of the DOE Office of Science’s mission. To enable breakthroughs that ensure our nation’s future Advance fundamental research in nuclear physics to gain a deeper understanding of the structure of matter Advance photon science and related research into the nature of materials. Develop the key technology and position Jefferson Lab’s user facilities for continued leadership roles Accelerator Science Applied Nuclear Science & Tech Large Scale User Fac./Adv. Instr. Major Laboratory Initiatives Core Capability Groupings JLAMP and 4 th GLS 12 GeV Upgrade Project Exp. Nuclear Physics Program ELectron Ion Collider SRF Technology Photon Science Nuclear Physics

5 Science Strategy for the Future Science in the 21 st Century Physics, Chemistry, Biology – major progress based on: –Advanced accelerator facilities –Operation as international user facilities Nuclear Physics: –Execute the 12 GeV Upgrade Project Highly recommended by NSAC –Experimental Nuclear Physics Program, 6 GeV, 12 GeV Nuclear physics into 2020s –Develop Electron Ion Collider, extend beyond CEBAF scope Photon Science: –4 th Generation Light Sources: JLAMP facility –User driven photon science, accelerator R&D Program –Development and participation in future light sources

6 Strategy for the Future – Major Initiative Experimental Nuclear Physics Program Scientific exploitation of CEBAF at 6 GeV and 12 GeV Outstanding physics remains that is best done utilizing the capabilities of the present CEBAF accelerator and its experimental equipment during the 2 years remaining before the final Upgrade shutdown. Once the 12 GeV Upgrade Project is completed, we envisage a program of experimental measurements for in excess of ten years. The Vision for the program: –Enables the national scientific strategy of understanding the structure of matter –Enables completion of 8 of 13 Office of Science milestones for hadronic physics –Aims for excellence and pre-eminence in a number of key areas of nuclear physics: Confinement and its manifestation in hadronic states with exotic quantum numbers; the structure of hadrons; the structure of nuclei; Standard Model tests via high precision at low energy.

7 Jefferson Lab Organization Director H. Montgomery Accelerator Science Advisory Comm. Nuclear Physics Program Adv. Comm. Photon Science Program Adv. Comm. University Relations Deputy Director Science & Tech R. McKeown Deputy Director Operations and Chief Operating Officer M. Dallas Experimental Physics L. Cardman Accelerator A. Hutton Theoretical & Computational Physics D. Richards (acting) Free Electron Laser G. Neil 12 GeV Project Office C. Rode Chief Financial Officer & Business Srvs. J. Scarcello Environmental Safety, Health & Quality M. Logue Chief Information Officer/Chief Technical Officer R. Whitney Engineering W. Oren Facilities & Logistics J. Sprouse Legal Counsel Project Management and Integrated Planning Community Outreach, Science Education and Public Affairs Human Resources Internal Audit JSA Board of Directors Chair

8 Personnel Changes Deputy Laboratory Director – Science Bob McKeown AD for Theoretical and Comp. Physics Mike Pennington Deputy AD for Accelerators Fulvia Pilat 12 GeV Project APM Physics Glenn Young Hall D Leader Eugene Chudakov (ex Hall A) Very Pleased with these appointments Experimental Nuclear Physics Dennis Skopik -- Partial Retirement last July Kees de Jager -- has asked to step down as Hall A leader Larry Cardman -- has asked to step down as AD for Exp. Nucl. Phys. Search Committee is active

9 ARRA “Stimulus” Funds = early receipt of ~half of planned FY10 & FY11 funds Lengthy Federal budget Continuing Resolution in FY11 is a concern. 12 GeV - $310M Total Project Cost (as of May 2009) CD-4A Dec 2014 CD-4B Jun 2015

10 12 GeV UPGRADE SCHEDULE Physics schedule unchanged. Cryomodule install/ testing moved into 6-month down. Use FY10 downs; shift accelerator installation work into 6-month down. MANDATE: Do not put follow-on beam delivery at risk !!! Start of Commissioning: Hall A October 2013 Hall D April 2014 Halls B and C October 2014

11 CIVIL CONSTRUCTION - Hall D Complex June-July 2010 Hall D Counting House Basement Walls/Stairwell Hall D – NW Corner Last wall lift

12 Ready for Equipment – May 5 th five months ahead of Level 2 Milestone Date Cryogenics equipment installation underway CHL Building Addition Erected Steel CIVIL CONSTRUCTION – Central Helium Liquefier (CHL) #2 Interior

13 Accelerator Construction Highlights cryomodule cavities beam transport magnets cryogenics coldbox vacuum valves cold tuner etc. etc. etc. Power Systems – parts arriving Beam Transport Quadrupole Magnets (~60 of 114) at JLab First 4 meter Dipole Magnet at JLab

14 Hall B Detectors HTCC prototype molds and mirrors (JLab) BC-404 BC-408 Panel 1a SVT sensor bonding and probe testing (UNH and Moscow State) Drift Chamber R2 wire stringing (ODU, and Idaho State) FTOF PMTs and timing test results (US Carolina, JLab)

15 Hall C - SHMS Infrastructure 1 st Cryogenic Control Reservoir Magnet Control Racks SHMS and HMS in Hall C Dipole vendor proposed Support Structure and Shield House Manufacturing Design progressing HB and Q1 Contracts Awarded Q2/Q3 - 5 bids received

16 Hall D Detectors Barrel Calorimeter Sixteenth Production Module The Mighty BCAL Press First BCAL Modules Arrive! Preparing Solenoid Test Central Drift Chamber Endplates

17 Upgrade Project Status Overall Project (End of June 2010) –Funding $145M –Cost Performance Index0.94 –Schedule Performance Index0.97 On average less than a month behind schedule Contingencies maintained –Contingency ~$60M, ~ 50% of Est. To Complete. FY11 is very constrained Availability projected for FY12 and FY13 –Effort on Project exceeds 120FTE Lehman Review (April 2010) –Very Satisfactory Review Manpower management, appeared satisfactory Schedule holding, civil schedule recovering –Concerns Hall D Solenoid

18 Funding FY09 Approp FY10 Approp FY11 Pres. Budg. Summary Comments ME Research6,1506,2006,265 Theory Research3,4003,5994,150 Accel Ops47,12047,14049,328 Accel Capital Equipment SRF R&D1,6351,3651,400 Accel AIP9501,050 Exp Sup Ops24,55925,56724,800 Exp Support Capital Equipment4,5005,2004,700 GPP1,8002,000 Subtotal NP Base90,24492,32193, GeV28,62320,00036,000 Subtotal NP Base & 12 GeV118,867112,321129,893 National LQCD Ops & CE SciDAC Total NP119,618112, ,433 Funding FY09, FY10, FY11 Favorable President’s Budget Request $1.8M up from FY10, but less than cost of living $2M pressure Receiving supplemental funding to enable g2p/gep

19 FY11 Budget and Consequences As yet there is no FY11 Budget –Senate Markup is -$100M wrt SC Pres. Request Specifics are not good for nuclear physics Upgrade is not impacted –House Markup is -$200M wrt SC Pres. Request Details not available, but rumored to be bad. Continuing Resolution expected –“6 month” CR Will start running as planned, no advantage in delay 12 GeV Project can ride 3 months OK –“12 month” CR Will need to curtail running Major reduction in 12 GeV Project work, major delay

20 Facilities: Resolve critical shortage and poor quality of space by constructing 278,000 sq ft and refurbishing 280,000 sq ft of work space; addressing safety and building code issues by updating outdated building systems; reducing deferred maintenance; and increasing energy efficiency. –Technology Engineering Development Facility (TEDF) (SLI) provides 38% of new and 31% of refurbished space (CD-3A approved 3/26/10) –CEBAF Center Expansion and Rehab (SLI 2016) ~ 34% of new space – Lab’s $32M GPP investment provides ~28% of new space. Utilities: Replace/upgrade year old site utilities to meet SC mission requirements by increasing cryogenics capability; increasing capacity and adding redundancy to the power distribution system; increasing cooling water capacity to meet mission requirements and replacing site cooling towers. –Utility Infrastructure Modernization Project (SLI 2011) Communications: Upgrade 1960s subsurface communications systems with 627 miles of fiber optic cable and 42 miles of building computer cable (SLI 2011). Strategy To Modernize JLab

21 Technology and Engineering Development Facility Test Lab Rehab SRF Addition TED Building Addition to Test Lab for SRF TED Bldg for Engineering & Shops Rehab Test Lab Eliminate Unsuitable Space

22 TEDF+ Project Status Status –Project Construction Phase is underway Schedule –CD-1 Sep 08 (complete) –CD-2 Jul 09 –CD-3 A 2 nd Qtr FY 2010 –CD-3 B 4 th Qtr FY 2010 –CD-4 New construction 4th Qtr FY 2012 Rehab 4 th Qtr FY 2014 General Plant Project ARRA Funding from Office of Nuclear Physics –Important ancillary work on buildings such as End Station Refrig. Buiilding

23 Strategy for the Future – Major Initiative ELectron Ion Collider (ELIC) Further extension of electron – nucleus scattering physics Developing the concept and the physics case and initial design of a future ELectron Ion Collider is essential to understand the future evolution of experimental nuclear physics in the U.S.A. and in the world. According to the 2007 NSAC Long Range Plan, “The ELIC would explore the new QCD frontier of strong color fields in nuclei and precisely image the gluons in the proton.” Goal is to develop the PHYSICS CASE for the next long range plan. The Vision for the program: –The next generation of electroweak nuclear physics beyond CEBAF at 12 GeV would demand an Electron Ion Collider TJNAF will participate in the development of the physics case for the EIC TJNAF will engage in R&D to develop accelerator and detector technology enabling a very high luminosity, polarized Electron Ion Collider. An initial stage, a medium-energy electron-ion-collider, MEIC, would accommodate subsequent energy upgrade. MEIC would be a high-luminosity, polarized electron-ion collider which would use CEBAF as injector into an electron storage ring. MEIC would have a center-of-mass energy of GeV and extremely high luminosity approaching 1x10 35 cm -2 s -1. The high luminosity is crucial to probe unknown essential features of the proton landscape, such as the impact of spin-orbit correlations. The booster rings, electron collider ring, and ion collider ring are designed as a “figure 8”, a design directly aimed at spin physics opportunities. The range of nuclei considered includes polarized light ions ( 1 H, 2 H, and 3 He) and medium to heavy nuclei (such as 12 C, 40 Ca, and 197 Au).

24 Strategy for the Future - Major Initiative JLAMP and 4 th Generation Light Sources A Next Generation Photon Science Facility at Jefferson Lab TJNAF has existing platforms with which it could demonstrate accelerator physics and technologies that address the needs of light source facilities as outlined in BESAC’s report “Directing Matter and Energy: Five Challenges for Science and the Imagination”. BESAC also delivered a position paper “Next Generation Photon Sources for Grand Challenges in Science and Energy” to SC. Two approaches to producing the required photons are identified: Free Electron Lasers and Energy Recovering Linacs. TJNAF has world class expertise in both technologies. TJNAF received funding from BES to participate in R&D, focusing on cavity and cryomodule development ultimately to permit the demonstration of well controlled, pulse-to pulse repeatable, high duty factor X-ray bursts of femtoseconds duration and unprecedented brightness. The Vision for the program: Jefferson Lab has proposed to build a continuous wave, high average brightness, short pulse free electron laser operating in the VUV/soft X-ray regime named JLAMP (Jefferson Lab AMPlifier). JLAMP would produce photons at an average brightness exceeding that of the FLASH facility in Germany. JLAMP would provide a platform for: –Ultrafast studies of emergent/correlated behavior in complex and nanomaterials related to energy and the environment, and with a strong user base of support as defined in recent BES reports. –Research in accelerator concepts which have the potential for substantial reduction of costs and better performance for future large-scale light sources. –Eventual participation in construction of a large scale next generation light source wherever it is built. –Accelerator research and training relevant to DoD ONR.

25 Summary PAC role is to provide advice with respect to the experimental nuclear physics program which is the core activity of the laboratory. We are concurrently constructing the 12 GeV Upgrade Project. We are also taking opportunities to upgrade the laboratory facilities and infrastructure. Consequently there are challenges to balance the different activities within constrained resources. (But we are getting support from Office of Nuclear Physics.) We are also looking to the long term future of Jefferson Laboratory