1 WP1 Technical Overview Progress since last meeting Budapest 24 – 25 th November 2004 Mike Fitch, BT.

Slides:



Advertisements
Similar presentations
Purchase of Assets in UK Assets and Expenses. What is an asset ? An asset is usually defined as premises, machinery or equipment that is owned by the.
Advertisements

13th Meeting of the Regional Interagency Working Group on ICT, 20 November 2009, Bangkok, Thailand 13th Meeting of the Regional Interagency Working Group.
Cellular Networks.
PAWS: Use Cases I-D: draft-ietf-paws-problem-stmt-usecases-rqmts Basavaraj Patil, Scott Probasco (Nokia) Juan Carlos Zuniga (Interdigital) IETF 82.
FCC Lifeline Broadband Pilot Program May 3, 2013 Kimberly Scardino Wireline Competition Bureau Federal Communications Commission.
CAPANINA Multimedia Applications Demo Specifications for Trial 1 Milan Lalovic Wireless Networks, BT Exact.
July 20, 2007 DBC confidential. Duplication strictly prohibited. 1 DigitalBridge Communications Next-generation broadband for South Carolina October 17,
3.2 Investment Appraisal Chapter 19. Investment To purchase capital goods  Equipment  Vehicles  New buildings  Improving existing fixed assets.
Using of cash flow for the financial stability and causes for changes in the amount of financial means, for the short-term planning of incomes and expenses,
Broadband services in Amaroussion WG1: Broadband Eleni Maglara, European Project Manager Municipality of Amaroussion Telecities Summer event Ronneby, 2-4/6/2004.
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
RAD ISM 01/2011 Slide 1 Wireless Mobility System.
Corporate Finance Lecture 5. Topics covered Decision trees Decision trees Dealing with uncertainty Dealing with uncertainty –Sensitivity analysis –Senario.
ISMT221 Information Systems Analysis and Design
Lecture(4) Instructor : Dr. Abed Al-Majed Nassar
Financial and Managerial Accounting
Web-site Design Strategy.  For P5, learners need to draw up plans for the evaluation of the website design.  The plans should include consideration.
Measuring the experience consumers have when using broadband services Tim Gilfedder Technical Advisor 3 rd July 2015.
WiMAX Presented By Ch.Srinivas Koundinya 118T1A0435.
1. 2 Communications from Aerial Platform Networks delivering “Broadband for All” Will deliver ‘Broadband for All’ from high altitude aerial platforms.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Wireless Access Standardization in China Zhiqin WANG CCSA Document No: GSC16-GRSC9-19 Source: CCSA.
The 22 nd meeting of the INTOSAI Working Group on IT Audit (WGITA) KPI Project Final Report — Key Performance Indicators Methodology for Auditing IT Programs.
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Recent mobility strategy developments in HEAnet Mike Norris 9 th November 2011.
1 Technical Overview David Grace (UOY) First Annual Review, Brussels 10 February 2005.
Using Value for Money Analysis to Evaluate Highway Public-Private Partnership Projects ARTBA P3 Conference Washington, DC, July 15-17, 2015 Patrick DeCorla-Souza,
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
Chairman Kevin J. Martin Remarks to the Georgetown University McDonough School of Business Center for Business and Public Policy November 30, 2006.
John Munnery Chairman of the Board of Directors, TransTelecom Ltd.
OECD’s Fixed and Mobile pricing baskets and progress on a mobile broadband indicator 2008 Global Event on Measuring the Information Society, Geneva, 27.
Tariq J Qureshi (TQ) Sr. Vice President +1 (954)
Objectives Overview Discuss the purpose of the components required for successful communications and identify various sending and receiving devices Differentiate.
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
1 WP1 Technical Overview Progress since last meeting Barcelona 4-5 th March 2005 Milan Lalovic, BT.
Ia m. a business leader with proven excellence in Product Management, Project Management, Business Development and Graphic Design. Analytical Skills People.
FIG-1 Ethernet DSLAM Wi-Max BTS DSLAM Wi-Max CPE Up to 30kmts INTERNET BACKBONE Location-1 Location-2 Wi-Max CPE BRAS Ethernet Switch FIG 1- DSLAM BACKHAUL.
WiMAX - The new Wireless Standard TELE 480 Mike Davison 11 Oct 2006.
1 WP2: Communication Links and Networking Mihael Mohorčič Torino, December 2003.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
AGEC 407 Investment Analysis Time value of money –$1 received today is worth more than $1 received in the future Why? –Earning potential –Risk –Inflation.
1 WP1 Technical Overview Progress since last meeting Brussels 10 th February 2005 Michael Fitch.
FIN 614: Financial Management Larry Schrenk, Instructor.
IT Services Model Business Requirements IT Strategies Goals
 Internet has become an integral part of our lives and our dependence on internet is increasing day by day. We used to access internet through Dial-up.
Introduction to Telecommunications, 2/e By M.A.Rosengrant Copyright (c) 2007 by Pearson Education, Inc. All rights reserved. Figure 24–1 CDMA spread spectrum.
V6OPS WG IETF-72 IPv6 in Broadband Networks draft-kaippallimalil-v6ops-ipv6-bbnet Presented by: David Miles Kaippallimalil John Frank Xia July 2008.
ICT Indicators Statistics in Vietnam Overview Report Nguyen Gia Bac National Institute of Information and Communications Strategy Ministry of Information.
Community Broadband Scotland Alaistar Nicolson Operations Manager HIE Development Officer Event Drumossie Hotel – Inverness 16 November 2012.
Jan Kuzelik, Tesco Stores CR a.s. B2B Communication Jan Kuzelik Project Manager July 17 th 2003 Prague.
Capital Improvement Project Town of Chelmsford IT FY2007.
Internet Options Physical Lines Copper Wire DSL Coaxial cable Electrical lines Optical fiber Wireless Satellite Mobile Carriers 5G Wi-Fi Providers: Hughes.
Transition Readiness Event – Background Reading May 2016
2017 GEO Trust Fund Budget Report of the Budget Working Group (BWG) Agenda Item 5.4 GEO-XIII Plenary St. Petersburg Russian Federation John Matuszak.
APNIC Open Policy Meeting: August 2001
2 TTC WG restructuring TTC is responsible for ICT standardization except for radio and broadcasting issues in Japan. TTC is accredited by MIC to engage.
TIA Overview Dr. Mark Epstein, Qualcomm Inc. Head of Delegation, TIA
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Mobile Wireless Backhaul for Fast Moving.
Project planning Unit 3 Employability and Professional Development
Interworking Architecture for WLANs, WMANs and 3G Cellular Networks
SMME Development through Universal Service & Access Programmes Presentation to the ICT Symposium Unlocking the Potential of the Digital Economy through.
TIA Overview Dr. Mark Epstein, Qualcomm Inc. Head of Delegation, TIA
ICT Indicators Statistics in Vietnam Overview Report
Estimating Project Cash Flows

Eric Wolf Vice President, Technology Strategy & Planning PBS


Stimulating Rural WiMAX

Presentation transcript:

1 WP1 Technical Overview Progress since last meeting Budapest 24 – 25 th November 2004 Mike Fitch, BT

2 WP1 Overview WP1 : Applications and Services WP1.1 Applications and Services Development D01 was delivered in Feb 04 No activity since last meeting WP1.2 Business Modelling M9 delivered in July 04 M12 delivered 17 th Nov 2004 on business models, acceptance criteria and some example models of services WP1.3 Architecture Design / Interworking Trial and measurements for Internet to trains and moving vehicles, report issued 5 th Oct 04 Network and applications designed and demonstrated in trial 1 at Defford, report issued 10 th Nov 04

3 Milestone M12 Issued 17 th Nov 04 Business models, acceptance criteria, services likely to make money Available on CAPANINA website

4 M12 Business models and acceptance criteria – assumptions Design costs are the same for all services, £300k manpower and variable equipment / installation Operational costs extrapolated from current experience (eg cellular / network costs Discounted cash flow models with at least 12% discount rate and preferably 18% Positive cumulative discounted cash flow after maximum of 3 years Inflation and depreciation on capital are both 2% PA Numbers of users is estimated from mobile market predictions but carry large uncertainty, especially with WiMax and other broadband initiatives

5 M12 Example services that might make money (in order of likelihood) Broadcast based broadband delivery Large number of small users WiFi / /WiMax backhauling Medium number of medium users Broadband to moving vehicles Medium number of medium users Special events and disaster recovery Small number of large users - although the case for providing this depends on more than money Internet connection to homes and offices Not enough users in coverage area, small market segment