The Neighbourhood Plan Not a wish list of projects but a planning policy document Should not repeat local or national policy A blueprint for sustainable.

Slides:



Advertisements
Similar presentations
Parish meeting April 23 rd Discussion of planning applications – WYE2 in detail Traffic analysis for the Neighbourhood Plan The new Our Place Wye project.
Advertisements

PLANNING THE FUTURE OF SEVENOAKS DISTRICT Alan Dyer Planning Policy Manager Sevenoaks District Council Presentation to Sevenoaks Society 7 October 2009.
BISHAM NEIGHBOURHOOD PLAN PUBLIC MEETING December
Planning: Can localism work in your area? Dr Michael Harris Deputy Head of Policy & Research John Romanski Senior Neighbourhood Planning Advisor, Planning.
Claire Milne Windsor Neighbourhood Plan Co-chair
1 An overview of neighbourhood planning and protection of open space.
Community Planning Awbridge – January 2014 By Marianne Piggin & Sam Knight.
Interested in Neighbourhood Planning in Cotswold District?
Copyright 2009 Northumberland County Council Northumberland Local Plan Core Strategy Update Riding Mill Parish Council 28 April.
A COMMUNITY LED PLAN FOR BISHOPSTONE? Public Meeting – 18 th October 2012.
Somerford Keynes Parish Council Neighbourhood Development Plan PARISH PRESENTATION 19 th JANUARY 2015.
Issues and Options Consultation September Plans A Neighbourhood Plan Our vision and local planning policies Housing, Business and Employment, Tourism,
What’s it like? “A unique Cotswold town with a gritty character quite unlike some of its mellower, prim and pretty neighbours” Stroud Preservation Trust,
Bath and North East Somerset – The place to live, work and visit PLACEMAKING PLAN.
Wiltshire Green Infrastructure Strategy. What is green infrastructure? The Wiltshire Green Infrastructure Strategy Wiltshire’s existing green infrastructure.
Leicestershire and Rutland Association of Local Councils and the Campaign to Protect Rural England Supporting Communities in Planning: Planning Workshop.
Planning and Localism – How it can work for you John King Friends of the Peak District
Trevor Warrick Spatial Policy and Implementation Manager
Settlement Boundaries Where do they come from? What do they do? What is the future?
Aberdeenshire Local Development Plan 2016 Identification of issues.
Copyright 2009 Northumberland County Council A Neighbourhood Plan for Broomhaugh and Riding Peter Rutherford, Northumberland.
Core Strategy – Radstock Action Group 14 January 09 Bath & North East Somerset’s Core Strategy David Trigwell Divisional Director Planning & Transport.
Salford Draft Core Strategy Graham Gentry Head of Spatial Planning.
Langdon Parish Council Site Allocation Consultation Two sites at East Langdon One site at Green Lane, Martin Mill.
Wootton Wawen Neighbourhood Plan Wootton Wawen Neighbourhood Plan Welcome Survey feedback Current status of activities What next?
National Planning Policy Framework Member Briefing 1 st May 2012 Mark Russell Planning Advisory Service.
Meeting with Governors Kislingbury Primary School December
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Phase 1 Consultation Results 23 rd September 2014.
Your town – your plan Bishop’s Stortford Neighbourhood Plan All Saints, Central, South and part of Thorley Neighbourhood Plan Team Meeting 17 th February.
West of England Joint Waste Development Plan Document Allan Davies Planning Policy Officer North Somerset Council West of England Partnership Office North.
#neighbourhoodplanning Golden Rules. First Golden Rule PLAN POSITIVELY “Planning must be a creative exercise in finding ways to enhance and improve the.
© 2007 PMP. All rights reserved. Wednesday 18 th July South Northamptonshire Council Open Space, Sport and Recreation Study and Green Space Strategy.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Neighbourhood Planning. Frequently Asked Questions What is Neighbourhood Planning? What can a Neighbourhood Plan do – and what can it not do? What are.
Planning Policy Briefing Community Plan Local Plan Part 1 South East Plan Local Plan Part 2 Local Plan 2006 Village Design Statement Neighbourhood Plan.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
SWIFT NETWORKING MEETING: NEW EASTERN VILLAGES (NEV) 24th September 2015 Samantha Howell Strategic Allocations Planning Manager and NEV Programme Lead.
Regional planning I local plan I design & regeneration I transport planning I research & information Southend-on-Sea Core Strategy Development Plan Document.
Neighbourhood Development Plan December 1 st, 2013.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
STREET CAPACITY??? Congestion and traffic problems highlighted by Holford in 1950! Some improvements, but the problems keep growing More growth = more.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
Bere Regis: Neighbourhood Plan Setting The Scene.
Little Chalfont Community Association Little Chalfont Parish Council 0.
Herefordshire Local Plan Members’ Seminar 9 October 2015.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
SGNDP STEERING GROUP MEETING 20 TH JANUARY 2016 SGNDP Steering Group 20/01/20161.
HAVE YOUR SAY! Six week consultation period 15th February - 28th March 2016 DRAFT UTTOXETER NEIGHBOURHOOD PLAN.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
planning aid for scotland unique national charity helping people engage with planning impartial & independent not part of Scottish Government or any Local.
Welcome to the first community meeting for The Effingham Village Plan.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Woodford Neighbourhood Forum 1. 2 This presentation is a brief summary of the work of WNF. It is supported by two circulated documents The Annual Progress.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
New Forest National Park Local Plan Review NFALC Briefing - 21 April 2016 Steve Avery – Executive Director, Strategy & Planning.
19th November 2015 Wealden Local Plan – Issues, Options and Recommendations East Hoathly with Halland Parish Council.
Broadclyst Neighbourhood Plan
Simon Williams Footprint Futures 2 November 2015
The Plan - Information Stage 1
Neighbourhood Planning
Future Village development key requirements
Shaping the future of Laverstock and Ford Parish
Winkleigh Neighbourhood Plan What is the Neighbourhood Plan?
New Southwark Plan: Area Visions and Site Allocations Consultation
Stroud District Local Plan Briefing on Stroud District Local Plan (- Conrad Moore, Planning Strategy Team) January 2016.
Neighbourhood Planning in the North Wessex Downs AONB
PUBLIC CONSULTATION WORKSHOP BBB VILLAGE HALL 10 NOVEMBER 2014
ELLINGHAM PARISH COUNCIL NEIGHBOURHOOD PLAN
Royal Leamington Spa Neighbourhood Development Plan 2029
Presentation transcript:

The Neighbourhood Plan Not a wish list of projects but a planning policy document Should not repeat local or national policy A blueprint for sustainable development

The plan must fit in with the local planning context Ashford’s Core strategy Tenterden and Rural Sites Development Planning Document National Planning Policy Framework

Figure 1.1 Wye with Hinxhill Parish boundary in local context with nearby major development allocations marked

Our Plan is based on wokshop Our Plan is based on consultation, the household survey and workshop output that developed our…………… Vision Principles Core objectives

Vision  ‘Wye should remain a distinct settlement with definite boundaries. It should retain a balanced community providing some local employment and should not become purely residential.  Any development should respect the rural landscapes around it, so that it retains its rural character. The environment should continue to make the community feel safe.  The active and energetic community should continue to enjoy many activities.  Any changes should respect Wye’s history and its historic buildings, but should enable most of the needed facilities and amenities to be provided in the village.’ This vision is based on what people value now and how these characteristics should be protected from future change. The overall aim is to retain Wye as a vibrant village.

Five Core Objectives have led to five General Policies The objectives : 1. To protect Wye’s sense of place within its surrounding countryside including the views into and from the village. 2. Wye’s conservation area and architectural heritage must be protected. 3. Development should not have severe impacts on traffic in Wye and its linked rural roads. 4. The promotion of sustainable business activity. 5. Generation of affordable homes integrated into mixed developments

Objective 1 To protect Wye’s sense of place within its surrounding countryside including the views into and from the village. Figure 4.1 The designated village boundary.

Figure 2.1a Landscape setting for Wye

Figure 2.4 Views and viewpoints in and around Wye

Objective 1 To protect Wye’s sense of place within its surrounding countryside including the views into and from the village. Policy G1a Development will be encouraged within the village boundary (see Figure 4.1). The following green spaces within the village boundary (see Figure 2.1a) will be protected from development. Churchfield Green Allotments The Green Sports fields Village Hall playing field Access to the river bank The Havillands meadow Green spaces in established housing developments Policy G1b Developments that detract from the views identified in Section into, out of and within the village, will not be supported.

Five Core Objectives have led to five General Policies The objectives : 1. To protect Wye’s sense of place within its surrounding countryside including the views into and from the village. 2. Wye’s conservation area and architectural heritage must be protected. 3. Development should not have severe impacts on traffic in Wye and its linked rural roads. 4. The promotion of sustainable business activity. 5. Generation of affordable homes integrated into mixed developments

Figure 2.2 The historic legacy of Wye

Objective 2 Wye’s conservation area and architectural heritage must be protected. The community, through the household survey, has strongly supported the existing village design statement (VDS). The VDS (Appendix E and Background document BD8) is currently recognised as Supplementary Planning Guidance by ABC. By including it within the Neighbourhood Plan it will become a part of the Ashford Development Plan. Policy G2 All planning applications must adhere to the basic principles and guidelines set out in the Wye Village Design Statement Entrances to the village should be visually welcoming and the designs of proposals should reflect guidance within the VDS.

Five Core Objectives have led to five General Policies The objectives : 1. To protect Wye’s sense of place within its surrounding countryside including the views into and from the village. 2. Wye’s conservation area and architectural heritage must be protected. 3. Development should not have severe impacts on traffic in Wye and its linked rural roads. 4. The promotion of sustainable business activity. 5. Generation of affordable homes integrated into mixed developments

Figure 2.7 Transport and walking in Wye showing key road junctions

Figure 2.8 Diagram showing the extent of queuing on January 9th am with existing traffic. Queues extend along Harville Rd and Bramble Lane to the west and Churchfield Way and Bridge St to the east.

Objective 3Development should not have severe impacts on traffic in Wye and its linked rural roads. Traffic flow through Wye, parking difficulties and queuing at the level crossing were the most frequently highlighted issues in responses to the household survey (BD1) and have been analysed in detail (BD4). Development is encouraged, but proposals for new business activities or housing must ensure that they will not create unacceptable levels of congestion, damage the quality of life in the Parish or the character of Wye. There must be no harmful impacts on Wye as a tourist destination within the AONB. Policy G3 New development will only be permitted where it will not cause a significant increase in the volume of traffic leading to: Severe queuing along the roads leading to the level crossing and the failure of queues to clear when the gates are open, or Creation of highway safety issues because of the overuse of rural roads leading to Wye.

Five Core Objectives have led to five General Policies The objectives : 1. To protect Wye’s sense of place within its surrounding countryside including the views into and from the village. 2. Wye’s conservation area and architectural heritage must be protected. 3. Development should not have severe impacts on traffic in Wye and its linked rural roads. 4. The promotion of sustainable business activity. 5. Generation of affordable homes integrated into mixed developments

Figure 2.1b Land use plan for Wye.

Objective 4The promotion of sustainable business activity Section 2.2 outlines the need to replace employment opportunities lost after the closure of Wye College. One goal of the Neighbourhood Plan is to recover some of the jobs lost, many of which supported the village’s retail and commercial activities. Strengthening the economic sustainability of Wye, including the growth of tourism, supports the village as an active tier 2 hub for surrounding settlements. Policy G4 Proposals that promotes sustainable business development to replace jobs lost through the closure of the college, particularly in education, food production, research and tourism will be supported.

Objective 5:Generation of affordable homes integrated into mixed developments The Plan notes the existing ABC policy that developments of more than 15 dwellings should include 35% of affordable housing. There was very strong support for Local Needs Housing in the household survey. We have conducted two local needs surveys (see BD6). The integration of housing needs with affordable housing in mixed developments is the approach supported by the Parish Council. Policy G5 Local Needs Housing should be met by integration within the affordable housing component of any new developments. This policy is supported by paragraph 54 of the NPPF and ABC Lettings Policy (Revision 2014) and responds to evidence identified within the Local Housing Needs Survey

The Plan contains specific policies dealing with Community issues Traffic Countryside and Environment Business Housing Our policies are backed up by survey results and detailed analyses for example of business potential and traffic (in background documents)

General policies are supported by those focusing on specific topics Countryside and Environment Policies (example) E 1 Existing green and other spaces (as shown in Fig 2.1a and b) should be preserved and enhanced.

Traffic policies (example) In support of General Policy G3, Transport Policy T1 further requires that Developers must demonstrate through traffic modelling, that their proposals will not have adverse impacts. T1 Any application for development of business activity (involving more than 5 workers) or residential development of more than 10 dwellings must be supported by traffic analysis including modelling of traffic flow at the level crossing and travel plans that encourage walking or cycling within the village. Impacts on the roads leading into and within the village, schools access and effects on neighbouring residents’ convenience must also be addressed.

Housing policies In developing housing policies due regard has been taken of the following issues Planning context - ABC’s policy indicates 45 for (none built so far) but no numbers for because of uncertainty over WYE3 Historic rate of growth – 50 every 10 years Availability of land – mainly WYE3 Impact on traffic and the environment – as analysed by modelling We want to support business development as well as housing The aim has been to create a blueprint for sustainable development

Figure 5.1 Overview of housing development on WYE1, WYE2 and WYE3.

Table 4.1 Indicative numbers of dwellings NP proposals to 2030 Windfall and change of use 40 WYE1 25 WYE2 a 25 WYE3 Up to 70 Other areas of potential change and rural sites b 15 Total Up to 175 a Planning approved b Nine dwellings already proposed on the Old Brickworks site Naccolt

Housing policies cover Phasing –numbers built every 5 years Tenure and housing type Density and layout Access to Broadband

Site policies provide more detail about each development WYE1 WYE2 WYE3 Naccolt Old Brickworks Potential windfall and change of use sites All of these site allocations contribute to overall numbers

In preparing policy for WYE3 the Council adopts the following strategy The Council treats WYE3 as a single area for development. Individual areas such as ADAS, are addressed. But each area is considered as a component of an integrated development. A mixture of education, business and housing is proposed.

WYE3 PROPOSALS Non-residential development ADAS site - return to woodland or establish a solar farm Withersdane - Clinic/rehabilitation centre with low traffic intensity Grade II buildings - allocated to the Secondary (Free) School Grade I buildings – redevelopment with funding from English Heritage, the Architectural Heritage Fund and Heritage Lottery Fund for Community use (see Appendix B). Kempe Centre – development as a high-tech business hub. Consolidation of horticultural businesses Renewal of artisan units along Occupation Rd (retained as business use). Housing Russell Labs and Sports Union site west of Olantigh Rd………….20dph (13 units) Residential accommodation within the Old Campus………………………... (5 units) Site East of Olantigh Rd and Occupation Rd…………………… dph (30-45 units) North of the Kempe Centre………………………………………………….…20dph (7 units)

WYE3 development west of Olantigh Rd

WYE3 development east of Olantigh Rd

WYE3 views into the development

Parish projects identified for developer contributions Improvement to the village hall Traffic calming and parking Solar/biomass energy generation on ADAS Grade I buildings for community use Orbital cycle route Environmental projects

Organisation of the text for the Neighbourhood Plan Main text covering Background to the Parish and Wye The planning context Development of our vision and principles Objectives and general policies Specific policies Site policies Appendices cover various issues supporting the main text Background documents will be available on line Copies of the latest drafts are available

Timetable Pre-submission consultation to various groups including Key consultees eg AONB, English Heritage Local planning authority Significant landowners Local community organisations Neighbouring parish councils Minimum 6 week consultation period –completion target December 2014 Submission of the plan to ABC following consultation The key addition to the pre-submission is the consultation statement that responds to all comments. The plan will probably be modified depending on responses received Completion target March 2014 Independent examination following assessment by ABC This may lead to further modification of the plan Completion target May 2015 Referendum in the autumn of 2015 – the General Election causes delay

Acknowledgements Mark Hanton Studios –maps and plans MLM consultancy –traffic modelling Jonathan Rodger Localities and Planning aid - guidance from Brian Whitely ABC - advice from Policy Planners Simon Cole and Katy Wiseman