SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, 2005 1 The RF Power Coupler Development Program at LAL-Orsay and.

Slides:



Advertisements
Similar presentations
Higgs Factory, HF2014 at IHEP, 2014 Oct. 101Eiji Kako (KEK, Japan) High Power Couplers for Higgs Factory Eiji KAKO (KEK, Japan)
Advertisements

30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
L. Ge, C. Adolphsen, K. Ko, L. Lee, Z. Li, C. Ng, G. Schussman, F. Wang, SLAC, B. Rusnak, LLNL Multipacting Simulations of TTF-III Coupler Components *#
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
Coupler without copper coating S. Kazakov 11/13/2013.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
A general comment first: The questions ITRP has posed to the proponents focus largely upon technical issues for the linear collider. These are important.
Anders Sunesson RF Group ESS Accelerator Division
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
Test Results of TTF-V Couplers for ILC H. JENHANI (CEA/IRFU) 1.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Coupler Multipactor Studies F. Wang, B. Rusnak, C. Adolphsen, C. Nantista, G. Bowden, Lixin Ge.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Titanium Nitride Coating by Reactive DC Magnetron Sputtering as a Multipactor Suppressor on Coupler RF Ceramic Windows Walid KAABI Anti e - Cloud Coatings-
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
IFMIF Power Coupler for HWR Superconducting cavities SRF LINAC GROUP H. Jenhani 1, N. Bazin 1, P. Bosland 1, B. Branas 2, P. Brédy 1, P. Carbonnier 1,
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
R&D for Fundamental Power Coupler in SRF Mass-Production
Tongming Huang (IHEP) On behalf of the power coupler working group
ILC-SCRF Test Facilities considerations
T5.2: Harmonization - Material and Component Reference
Development of X-band 50MW klystron in BVERI
Power Couplers, HOM Couplers and Tuners for the XFEL
Power coupler at DESY & for XFEL
NC Accelerator Structures
Chris Adolphsen Sergei Nagaitsev
Findings in RF Power Couplers after operation on cavities in PXFEL2
World Wide Fundamental Power Coupler meeting #3
SNS Fundamental Power Coupler History
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
High Power Couplers and… pushing the limits of SC cavities
Review of the European XFEL Linac System
Multipacting Simulations of TTF-III Coupler Components*#
Performance of Large Grain TESLA cavities
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Nick Walker (DESY) EU GDE Meeting Oxford
V. Veshcherevich Cornell University
Presentation transcript:

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and DESY-Hamburg for TESLA and the European X-FEL T. Garvey Labratoire de l’Accélérateur Linéaire – Orsay, W.D.-Möller, DESY-Hamburg

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Function of the power coupler Transmit the radio-frequency waves from the power source (klystron) to the accelerating cavity.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Additional coupler functions Minimise forward loss of power from klystron to cavity. Isolate the evacuated cavity from the air filled wave-guide Protect the cavity against ‘contamination’. Minimise the thermal losses between the wave-guide (room temperature) and the cavity (2 K). Allow flexibility for thermal cycling of cryomodule. Allow variable “coupling” to the cavity.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Coupler power requirements TTFTESLA 500 / TESLA 800X-FEL Peak power 208 kW230 kW / 925 kW200 kW Repetition rate / Pulse length 10 Hz 1.33 ms 5 Hz / 4 Hz 1.37 ms / 1.33 ms 10 Hz 1.33 ms Average power 2.8 kW 1.6 kW / 4.9 kW2.7 kW Coupling (Qext) adjustable ( ) fixed 3x10 6 / 2.5x10 6 adjustable ( ) Operating frequency: 1300 MHz

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The solution…. the TTF-III coupler

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Co-axial is easy for: - variable coupling - fabrication - assembly two windows for: -clean assembly -safe operation cold coax: -at 70 Ohm, 40 mm diameter warm coax: -at 50 Ohm, 62 mm diameter D.C. bias:-suppress multipacting flexibility: -bellows in the warm and cold coax ceramics: -Al 2 O 3 with TiN coating copper plating: -20 μm -high thermal conductivity -high purity, hydrogen free Design of the TTF-III Couplers

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Multipacting – resonant discharge when mixing vacuum and RF with surfaces having SEE > 1. Apply thin coating (~ 10 nm) of TiN to reduce SEE of Al 2 O 3 ceramic surface. Power levels scale as ~ Z.  diameter) 4

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Warm assembly Warm ceramic protection cap

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Cold assembly

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Wave-guide assembly HV input coil

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, RF Coupler in Module module 70K shield 4K shield cavity cold windowwarm window

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Coupling to the VUV-FEL LINAC Cavities Power towards cavity Coupler

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Coupler development RF design –Electromagnetic, multipactor, mechanical, thermal. Fabrication Reception, preparation, assembly High power tests

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, RF design of couplers Extensive use of electro-magnetic simulation codes -coupler well matched; VSWR < minimise E-fields in critical areas.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, TTF-III coupler production requires many technologies. Copper coated bellows E-beam welding Ceramic-metal brazing Laser weld of bellows TiN coating

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Coupler reception, preparation and mounting Inspection Cleaning with ultra-pure water High temperature vacuum bake-out Assembly in Class 10 clean room

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Source

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, High power test configuration Pair of couplers under test at Orsay.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, RF “conditioning” RF conditioning (or processing) is the procedure whereby the coupler power is gradually increased from zero to its nominal operating level. Corresponds to ‘controlled’ desorption of gases from RF surfaces ⃕ multipacting Surfaces “cleaned-up” as result of conditioning. Cold surfaces can re-collect gas following periods of operation. Interlocks required to protect coupler during processing ⃗ monitor vacuum levels, electron activity, light signals reflected and transmitted power, window temperature.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Diagnostics used as interlocks Photo-multiplier Vacuum port Electron pick-ups

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Control and Data Acquisition

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Conditioning procedure Pulse length 20  s, ramp power to 1.0 MW in 0.2 dB steps Pulse length 50  s, ramp power to 1.0 MW in 0.2 dB steps Pulse length 100  s, ramp power to 1.0 MW in 0.2 dB steps Pulse length 200  s, ramp power to 1.0 MW in 0.2 dB steps Pulse length 400  s, ramp power to 1.0 MW in 0.2 dB steps Pulse length 800  s, ramp power to 0.5 MW in 0.2 dB steps Pulse length 1300  s, ramp power to 0.5 MW in 0.2 dB steps Sweep 1.3 ms, 50 to 500 kW. Interlocks e- pick-ups, photo-multiplier, vacuum, ceramic temperature Wave-guide sparks – stop operation!

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, RF Coupler DESY  Total of 40 RF power couplers connected to the superconducting cavities in the VUV FEL linac, eight per module.  All couplers in the VUV FEL linac have been processed and operated up to the limit of the cavity performance.  RF power couplers have been tested up to 1 MW of pulsed power at 1.3 ms pulse length, 2 Hz on the test stand.  RF power couplers operated ~270,000 coupler*hours.  TTF-III couplers have been tested together with cavities at gradients of 35 MV/m (600 kW) 5 Hz without degradation of cavity or coupler.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Coupler processing data RF power as a function of time for different pulse widths. Electron activity as a function of RF power and pulse width.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Conditioning times for couplers Why are the conditioning times different ? - real differences between couplers ? -differences in preparation / installation ? -Answer is object of our present studies.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, R&D to reduce conditioning time Investigate new threshold levels for safe operation Apply titanium-nitride on all RF surfaces Use glow-discharge treatment of RF surfaces DC bias sweep to provoke multipactor Alternative anti-multipactor coatings

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Measures towards cheaper coupler production Industrial study of coupler “mass” production for X-FEL.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, TTF-V Proto-type Essentially = TTF-III “warm” part + 62 mm   “cold” part. Larger diameter – to transmit more power and push multipactor levels to higher power Candidate coupler for a two x 9 cell TESLA/ILC cavity Engineering drawings and technical specifications completed. Four such couplers will be built in 2005 for high power tests in early Will be subsequently used for studies on RF conditioning times.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, TW60 Coupler Proto-type Radically different from TTF-III coupler, uses “thin” planar ceramic windows. Easy to braze, low dielectric loss. Insensitive to multipactor Warm transition is matched with reduced- height wave-guide  standing wave. “Line of sight to cavity” Cold window matched with reactive impedance elements on inner co-ax. Low power measurements already performed. High power tests planned for 2006 on four proto-types to be built by ACCEL.

SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, Summary The TTF-III coupler performance is adequate for the X-FEL project The TTF-III coupler may also be acceptable for ILC Alternative ILC designs are being studied R&D is in progress to reduce processing times Industrial studies will lead to reduced costs Thank you for your attention I thank all my DESY and Orsay colleagues for their contributions to this work