CALICE Summary of 2006 testbeam for the ECAL

Slides:



Advertisements
Similar presentations
INFN Milano, Universita` degli Studi Milano Bicocca Siena IPRD May Testbeam results of the CMS electromagnetic calorimeter Alessio Ghezzi.
Advertisements

Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
Experimental Particle Physics
Scintillator Tile Hadronic Calorimeter Prototype (analog or semidigital) M.Danilov ITEP(Moscow) CALICE Collaboration LCWS04, Paris.
Prototype sPHENIX Calorimeters
The CALICE test beam activities Fabrizio Salvatore Royal Holloway University of London (for the CALICE collaboration) ALCPG07, FNAL, Chicago, 22 nd October.
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
25 seconds left…...
Number bonds to 10,
Results from first tests of TRD prototypes for CBM DPG Frühjahrstagung Münster 2011 Pascal Dillenseger Institut für Kernphysik Frankfurt am Main.
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
or getting rid of the give-away particles in a test-beam environment
Beam test of Silicon-Tungsten Calorimeter Prototype
CALICE SiW Electromagnetic Calorimeter
Test Beam Request for the Semi-Digital Hadronic Calorimeter
the CALICE test beam set-up and running experience
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Preparation for CERN test beam
CALICE scintillator HCAL
CALICE News The 2007 beam tests have started!
The DHCAL: an overview José Repond Argonne National Laboratory
ScECAL+AHCAL+TCMT Combined Beam FNAL
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Rick Salcido Northern Illinois University For CALICE Collaboration
Michele Faucci Giannelli
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London On behalf of the CALICE-ECAL Collaboration Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan Content Introduction Briefly, what does the ECAL look like ?? The three 2006 test beam periods and their objectives Data taken 1, 10 or 100 TBytes on disk ? Electron and hadron events A few event displays. Noise issues A perfect detector would be amazing ! Conclusion A successful experience Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

The Electromagnetic Calorimeter prototype W layers wrapped in carbon fibre 3 modules with different tungstene thickness, total = 24 X0. PCB+Si layers:8.5 mm ECAL prototype: 30 layers of variable thickness Tungsten Active silicon layers interleved Front end chip and readout on PCB board Signals sent to DAQ 200mm 360mm 62 mm 6x6 1x1cm2 Si pads Conductively glued to PCB Area now completed for 30 layers Last year : only 14 layers Last 1/3rd expected in May 2007. Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

Overall objective of 2006 beam test for ECAL Characterize detector performances Test and tune the simulation. Once we trust the simulation  optimisation of the detector Identify hardware problems to correct them before building the whole so-called EUDET module. Test particle flow algorithm. Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan 2006 beam test period Feb Installation @ DESY . First cosmic events in the “tent”. DESY TB area, 1-6 GeV electron beams, with only 24 layers . 14 days in total. May July 27th Aug 8th ECAL CERN period : cancelled !! No beam, SPS fault, not ours.... AHCAL+TCMT period : transformed into 5 days ECAL+5 days AHCAL stand alone + 3 days, courtesy of ATLAS, for ECAL stand alone. Aug 25th Sept 6th Oct 11th Oct 30th Combined ECAL+AHCAL + TCMT , with ECAL-AHCAL @ 6cm Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

DESY TB setup Tracker: 4 drift chambers ECAL: 24 layers, 5184 channels First tests of ECAL-HCAL combined acquisition Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan DESY Data Samples Garbage and empty events Multi-particle events Energy (mip) per event  Shower fully contained Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan CERN installation  Particle ID: Cherenkov counter, 1bit signal  Tracker : 3 XY proportional chambers (MWPC)  Calorimeters : ECAL: 30 layers, 6480 channels HCAL: 15 modules, 3240 channels TCMT: 8 modules, 160 channels Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

CERN- August period in figures + 30 Millions of Muon events for calibration. Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

A few hadron runs combined with AHCAL and TCMT Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan October 2006 period Add another 70 Million physics events ! + 14M only for HCAL calibration + 3.5 M of HCAL only runs Detail of the 70 M: - 42M of muons for calibration - Another 3.8 M dedicated to electron studies between 6 and 50 GeV - And 23 M of hadronic events between 6 and 80 GeV - Dedicated to beam tuning : “only” 1.2M Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

Electron runs Electron combined runs E (GeV) e+ (kEvts) e- (kEvts) 6 208 128 8 218 10 152 172 12 211 15 476 124 16 310 18 303 231 20 390 210 30 409 50 305 Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan Hadron runs Combined pion runs E (GeV) π+ (kEvts) π- (kEvts) 6 481 1804 8 1872 10 968 1878 12 1568 15 722 1616 18 1728 20 769 1559 30 3298 40 1457 50 1533 80 1860 Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan Summary of events Add the final plot showing nb of events per day over the whole CERN period, separating tuning/calib/physics ??? Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan The data taken CERF period: parasitic muon high intensity, wide distribution  Very important for calibration !!! Combined run, goal: ECAL EM program - e 10-45 GeV, from 50 GeV beam, with 0,10,20,30 deg - small samples of p 30-80 GeV too large distance ECAL-AHCAL up to 10 million events in one day! AHCAL stand alone, ECAL removed - 1 day @ 10 GeV secondary beam tested p / e 6,10,15,20 GeV - 3 days @ 50 GeV secondary beam e 10-45 GeV and p 30-80 GeV All what was collected in the ECAL run: 60 GeV secondary beam, tested e 10-45 GeV and p 30-80 GeV. !!! large fraction of time invested in beam tuning !!!  3 additional days “courtesy” of ATLAS: AHCAL and TCMT out of beam line, ECAL re-installed for high statistics low energy runs (thanks to all voluntary shifters) Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

Electron and π showers in the ECAL Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan A few more displays For the October runs... Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

A few problems, “of course” Pedestal instabilities : results in “noisy” layers, with a correlated noise over a whole PCB of up to 50% of a MIP !!! Not understood yet ! Currently investigating on an hardware point of view !! A preliminary procedure to correct this effect event by event is applied in the data reconstruction, but need further studies. “Square events” : appearence of hits around some wafers, in the guard ring zone. Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

Pedestal instabilities ... A Good PCB Muon run (ECAL threshold : 0.5 MIP) Noise A PCB with unstable pedestals Noise Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan “Square” events ... Proportion of events concerned : high energy data (electrons 45 GeV) : ~4% low energy data (electrons 3 GeV) : < 10-3. Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan Conclusion A successful experience !! Lots of data taken, stable detector running, people on-site to solve the problems as soon as they appear... ... Further plans : TB in May-June next year (currently in negociation with CERN) + Fermilab with DHCAL in fall 2007. Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan Chop, chop ! Happy analysing everybody !! Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan CERN installation Muon 1 Muon 2 3x3 10x10 m trigger beam 400 m 11000 * all in mm Beam instrumentation: 1) ~500 m beam line after Be trg = magnets, collimators, secondary trg, abs 2) Cherenkov detector for e/p separation < 40 GeV 3) 3 x/y pairs of Multi Wires Proportional Chambers (MWPC) with double readout, multi-hit capability 4) veto counter, r/o analog amplitude, to separate multi-particle events 5) trigger system 2) 3) 4) 5) are integrated in the DAQ and read out event by event π event Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

ECFA meeting - Valencia - A.-M. Magnan View of an ECAL board Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan

Beam quality issues @ DESY Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan