Macomber Map Demonstration

Slides:



Advertisements
Similar presentations
Working for the future - today
Advertisements

Integrated Building Solutions, Inc. Web Based Facility Integration Tools CFRT Visualization Project.
AMI & Grid Data Analytics & Analysis Management Platform Page  1 What does this platform offer? Our tool is a next generation grid management software.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
August 14, 2003 Blackout Final Report
PacifiCorp-CAISO EIM Initiative Overview
Cyber Security and the Smart Grid George W. Arnold, Eng.Sc.D. National Institute of Standards and Technology (NIST) U.S. Department of Commerce
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
© InLoox GmbH InLoox PM for Outlook product presentation Project management software – integrated in Microsoft Outlook.
Technology Navigator Reports Reporting Solutions for the Financial Institution Industry
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Smart Integrated Infrastructure The Progression of Smart Grid Presentation to National League of Cities Martin G. Travers – President, Telecommunications.
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Workflow Based Tools Simplifying All Job Functions.
GridWise ® Architecture Council Cyber-Physical System Requirements for Transactive Energy Systems Shawn A. Chandler Maseeh College of Electrical and Computer.
Network (Common) Model Management System Presentation to ERCOT October 21, 2008 Thomas F Garrity Vice President Energy Management and Automation Siemens.
ERCOT 2013 Winter Storm Drill (WSD) Summary Brian Barcalow Training Specialist, Sr.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
1 The Tres Amigas SuperStation VLPGO November 2011.
Common Information Model and EPRI Smart Grid Research
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Esri UC 2015 | Technical Workshop | Land Records Maps and Apps for State and Local Governments Chris Buscaglia Scott Oppmann.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Transmission Reliability Performance Metrics November 5, 2009 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Ohio Digital Government Summit Disease Surveillance (Homeland Security session) October 5, 2004 Rana Sen Deloitte Consulting LLP.
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Bulk Power Transmission System
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Listen to Your Meters! Pradeep Murthy SunTec Business Solutions.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
Load Modeling for Dynamic Studies ROS Meeting – July 2005 ERCOT System Planning.
The Prajna Project Utilities for Understanding Edward Swing.
Overcoming Barriers to Smart Grids & New Energy Services UT Smart Grid Conference April 7 th, 2011 Trip Doggett President & CEO Electric Reliability Council.
ERCOT 2014 Hurricane Drill (HD) Summary Brian Barcalow Training Specialist, Sr.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
Chapter 5 McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Overview of Real Time Grid Reliability Management Carl Imhoff Pacific Northwest National Laboratory January 27-29, 2004 Washington, D.C. Transmission Reliability.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
© 2008 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. Cyber Security and the National.
FERC Staff’s Report on Demand Response and Advanced Metering.
Congestion FTR’s ISO Charges Congestion FTR’s ISO Charges Performance Monitoring is Essential for Harmonizing Reliability and Markets Distributed Generation.
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Integration Update October 24, 2006 Daryl Shing, Enterprise.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
GRID OPERATIONS ORGANIZATION John Adams Director, Grid Operations (office) (cell)
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Reliability Assessment Committee Reliability Workshop Priorities
Reliability Assessment Committee Reliability Workshop Priorities
Time-Based Management of Large Scale Network Models
Presentation transcript:

Macomber Map Demonstration Michael E. Legatt, Ph.D. Principal Human Factors Engineer mlegatt@ercot.com / 512-248-4232 EPRI Project on Human-Centered Situation Awareness December 10, 2010

All content contained herein, literary, pictorial, graphic or Copyright / Trademark The materials included within the presentation are the intellectual property of the Electric Reliability Council of Texas. All content contained herein, literary, pictorial, graphic or otherwise are copyright protected © 2010, ERCOT, Inc., Michael E. Legatt, Ph.D. Macomber Map ©™ All rights reserved. December 10, 2010 EPRI - Human-Centered Situation Awareness

Need for wide-area and high-level views “Alarm storm” “Dust storm” History Need for situation awareness and user experience enhancements in control rooms Blackout of 2003 Main issues: Need for wide-area and high-level views “Alarm storm” “Dust storm” Locations of equipment Navigation between one-lines Naming conventions for equipment Data integration across multiple systems Increased cognitive load as operators increasingly managing more tasks with more complex systems. This trend is only continuing (e.g., advanced metering) December 10, 2010 EPRI - Human-Centered Situation Awareness

History Gary Macomber & Kate Horne performed initial research on the needs in control room in 2005. I started at ERCOT in 2007, working with on UI improvements in the control room, meeting at least once a week with control room operators and other key staff. Over the ensuing years, ongoing prototyping, display building and integrated visualization systems were developed with refinements based on continual user feedback. In 2008, Gary passed away a week before approval to develop one of these prototypes into a new control room UI, and it’s named in his memory – Macomber Map. December 10, 2010 EPRI - Human-Centered Situation Awareness

Macomber Map Macomber Map is a visualization tool – business processes run by the core systems Macomber Map being used in control room, by NERC, FERC, and TRE for monitoring, engineers for studying, training. Focus on situation awareness, configuration to ERCOT control room operators and their needs. Core functionality: Integrates the many data sources in the control room: network model, real-time and study energy data, market data, so that an operator can see all data for single element (e.g., a generator), across applications and systems. A “Google” approach to the transmission grid, allowing operators to locate elements by a series of keywords (e.g., name, county, voltage, owner) Linking all transmission elements to a point on the map, to prevent alarm and dust storms December 10, 2010 EPRI - Human-Centered Situation Awareness

Core functionality (continued) Macomber Map Core functionality (continued) Operating in a pyramid approach, allowing operators to drill down quickly from high-level to detailed data rapidly: “forest and the trees.” Consistent positional awareness, regardless of detail level Linking equipment with ownership and operatorship information for rapid response. When possible, linking problems with potential solutions. Allowing operators to aggregate data within regions (e.g., Hurricane Dolly). Focus on operator needs (e.g., display relative to ambient lighting, color schemes with potential for tobacco-induced decreases in color discriminability) December 10, 2010 EPRI - Human-Centered Situation Awareness

Many departments using tools derived from Macomber Map (over 20) Control room Network modeling group Congestion Revenue Rights (CRR) group MIS Group (Contour map of locational marginal pricing and settlement point pricing) Training group Engineering User Experience improvements Several projects using MM core libraries for quicker development, easier business process integration, significant cost savings to ERCOT. MM Loader, OS Tracer, Contingency Auto-definitions, EMS Tray, CIM Comparison Tool, CIM Indexer, LMP Contour Map, EMS integrated dashboards, December 10, 2010 EPRI - Human-Centered Situation Awareness

Integration with additional systems and data (e.g., TruWind) Ongoing enhancements Integration with additional systems and data (e.g., TruWind) Using MM as a test platform for research, determining optimum color patterns, etc. Increased utility in viewing historical data Additional weather data December 10, 2010 EPRI - Human-Centered Situation Awareness

Macomber Map December 10, 2010 EPRI - Human-Centered Situation Awareness

Macomber Map December 10, 2010 EPRI - Human-Centered Situation Awareness