Adam Schechter, PhD Coordinator: Systems, Compliance, Education Human Research Protection Program Yale University.

Slides:



Advertisements
Similar presentations
iStar How to Create an Amendment
Advertisements

USC Clinical Trials Office (CTO) Submitting your Studies to CTO For Processing Soheil Jadali Director, Clinical Trial Office.
CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction California Department of Education Special Education Self-
Combinational Circuits
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
OIE Tuition Process Enhancement Info Session January 2014 Presented by: Chris Schwarzer International Finance Director, Office of International Education.
TEXAS SOUTHERN UNIVERSITY OFFICE OF RESEARCH LINDA M. GARDINER, Ph.D. DIRECTOR DEPARTMENT OF RESEARCH ENHANCEMENT AND COMPLIANCE SERVICES.
Submission to Approval What happens to my protocol once I submit it to the HIC office.
Case Tools Trisha Cummings. Our Definition of CASE  CASE is the use of computer-based support in the software development process.  A CASE tool is a.
1 © 2006 by Smiths Group: Proprietary Data Smiths Group Online Performance Review Tool Training.
U.S. Department of Agriculture eGovernment Program February 2004 eAuthentication Integration Status eGovernment Program.
Presented by: Virginia Hendricks Information Audit.
Welcome to the Turnitin.com Instructor Quickstart Tutorial ! This brief tour will take you through the basic steps teachers and students new to Turnitin.com.
CPP Fall 2014 IRB Training Session Version 10/7/14.
Keys Chapter 8 Database Design for Mere Mortals. Why Keys Are Important They ensure that each record in a table can be properly identified. They help.
I T ’ S J UST A L ITTLE C HANGE ; O H AND I T ’ S T IME TO R ENEW ! H OW TO SUBMIT AMENDMENTS AND RENEWALS Human Investigation Committee Human Research.
Configuration Management
Handouts Software Testing and Quality Assurance Theory and Practice Chapter 11 System Test Design
Welcome to the Manage Quality Assurance module of the “MIP Release 3 Study Workflow Training” course! This module guides you through the process of managing.
Updated 08/10/   This user guide serves the following purposes:  Introduce users to UMeNET login procedures and UMeNET.
How to Obtain Institutional Review Board (IRB) Approval Richard Wagner Associate Director UCSF Human Research Protection Program August 14, 2008.
Collaborating with the Quality Code Christopher J Cox Head of Collaborative Partnerships, Nottingham Trent University.
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
School and LEA Users
Presented by Joan Kossow Data Compliance Manager The Changing Face of Claims Processing &
Managing the development and purchase of information systems (Part 1)
Implementation Yaodong Bi. Introduction to Implementation Purposes of Implementation – Plan the system integrations required in each iteration – Distribute.
1 Improving Administration in Your Financial Aid Office SFA’s Tools for Success.
Northcentral University The Graduate School February 2014
2004 National Oral Health Conference Strategic Planning for Oral Health Programs B.J. Tatro, MSSW, PhD B.J. Tatro Consulting Scottsdale, Arizona.
INFORMATION YOU ALWAYS WANTED TO KNOW BUT WERE AFRAID TO ASK!
Examining data using Microsoft Access Queries Using Criteria and Calculations SESSION 3.2 This section covers specifying an exact match condition in a.
Agency (BU) Query Manager Training State of Indiana Instructor: Lori Shapiro, ENTAP.
The Institutional Review Board: A Community College Toolkit Dr. Geri J Anderson.
THE NUTS AND BOLTS OF ADVISORY COMMITTEES Development of Work-Based Learning Programs Unit 6-- Developing and Maintaining Community and Business Partnerships.
CSC Michael Moeller Metadata Specialist.
EPAF Demo Screenshots Session #10741 March 24, 2005 HEUG 2005 Conference Las Vegas, Nevada.
1 Access to the World and Its Languages LRC Technical Assistance Workshop (Part 1) Access to the World and Its Languages I N T E R.
Renewals A HOW-TO. Objectives 1.Why are renewals necessary? 2.What projects require a renewal? 3.How do I find the form? 4.How do I fill out the form?
Improvement Planning Mischele McManus Infant/Toddler and Family Services Office of Early Childhood Education and Family Services July 20, 2007
Guidance Training (F520) §483.75(o) Quality Assessment and Assurance.
Presented By WVDE Title I Staff June 10, Fiscal Issues Maintain an updated inventory list, including the following information: description of.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
October 9 th, 2015 University of Pennsylvania TIES Cancer Research Network Y3 Face to Face Meeting U24 CA Session 5 Regulatory Update.
January 2009 Copyright © 2009 Mississippi Department of Education Intervention Screen and Reports January 13, 2009.
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
January 2012 Mississippi Department of Education Office of Instructional Enhancement and Internal Operations/Office of Special Education 1 Noncompliance.
California Department of Public Health / 1 CALIFORNIA DEPARTMENT OF PUBLIC HEALTH Standards and Guidelines for Healthcare Surge during Emergencies How.
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Pool of experts database and further enhancements.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Documentation Requirements for Hospital Accreditation -By Global Manager Group.
ATRK & CMC—The Perfect Pair. Presentation Outline Brief Introduction CMC Screen & The 4 Definitions of Communications Management ATRK Screen Tying together.
HTBN Batches These slides are intended as a starting point for further discussion of how eTime might be extended to allow easier processing of HTBN data.
FIRE1000S - Self-Paced FIREBIRD Training Training on the Federal Investigator Registry of Biomedical Informatics Research Data (FIREBIRD) for Clinical.
Blackboard Learn 9.1 Communicating with Students © 2010 Blackboard Inc. All rights reserved.
DAMIR for Releasers Tuesday 10/30/2007 Breakout Session 5A Wednesday 10/31/2007 Breakout Session 3A.
© 2016 University at Buffalo Click Training Agreements Module University at Buffalo Office of the Vice President for Research and Economic Development.
Make-Up Testing/Undo Student Test Submissions
Melissa Wagner & Jaime Patel
Introduction to the Human Research Protections Office (HRPO)
How to Submit a New Human Ethics Behavioral Application
How to Create and Start a Test Session
Click Training Agreements Module
Parent-Teacher Partnerships for Student Success
{Project Name} Organizational Chart, Roles and Responsibilities
Click Training Safety Module
Presentation transcript:

Adam Schechter, PhD Coordinator: Systems, Compliance, Education Human Research Protection Program Yale University

Goals 1. To identify the main elements of the electronic submission process as it applied to the IRB. 2. To demonstrate the process for creating routing maps, business rules, and meta-rules. 3. To show how an institution’s particular business practices can be designed in the Coeus system. 4. To illustrate the Yale experience as an example throughout.

Electronic Submission: The Basics The main purpose of electronic routing is to simulate an IRB’s business practice with paper submissions. Routing is the process of electronically moving a protocol submission through the various required review components of an institution. Rules are tests that determine how the submission will be routed.

Initial Swimlanes At Yale, the established paper submission process involved not only approval from the HIC, but also approval from other committees and offices external to the HIC. As such, these needed to be incorporated into the electronic routing schema where appropriate:

Example: Yale School of Nursing (Draft)

Maps Unit Hierarchy  Routing is dependent upon a well-structured hierarchy

Maps Maps are tied to a unit  Each unit can have multiple maps

Maps Maps are made up of stops or levels. Stops are made up of one or more users. Each level of the unit hierarchy can have maps. Within the hierarchy each unit’s rules will be evaluated and the appropriate maps are inserted into the routing.

Maps Users are placed in “stops” in each map. Within each stop, users can represent approvers or alternate approvers.

Maps Maps can utilize multiple levels within which stops and users can be placed by requirement.

Maps And from the Lite side:

Business Rules Roles that can setup business rules:  Business Rules Maintainer – Department  System Administrator – Department  Application Administrator – Research Office

Business Rules Business rules are the nuts and bolts of electronic routing. They also represent the various components of the swimlane diagram we saw earlier. When creating a business rule, you can choose from four types: 1. Notifications 2. Questions 3. Routing 4. Validation

Business Rules Note that Functions, Questionnaires, and Columns can be used as conditions to build business rules:  Functions: Developed at the database level with the capacity to execute a true/false query and return the result.  Questionnaires: Developed within Coeus by combining (pre- generated) questions and returning user responses.  Columns: Simple values found in specified code tables in Coeus.

Business Rules Here is an example of a business rule “shell”:

Business Rules As with any logic proof, business rules can be built upon and modified depending on the conditions and functions that are incorporated. For instance, a very basic business rule might require any protocol submission to be reviewed by a particular group of people (identified by the maps we discussed earlier). In this case, the business rule would look like this:

Business Rules Note that the function “All Protocols” was used in combination with the conditional “Equal to” and the truth value “True”, along with the selected map “Triager”. In plain-speak, the rule says that whenever any protocol submission is submitted electronically to the IRB, it must be routed to the “Triager” map in order to await review by the people associated with that map.  The submission is also routed to each reviewer’s inbox along with the basic protocol information and the date of the submission.

Business Rules If we were to create a business rule with two conditionals, it would look like this: In plain-speak, this business rule indicates that when a submission is the initial submission for a protocol and a subject population of “children” (pre-selected) has been chosen by the investigator, the submission should route to the “Regulatory/PPRC Scientific Review” map.

Business Rules And from the Lite side: + =

Business Rules

If we add the previous two conditionals together, we get the following “if-then” business rule: Again, in plain-speak, this indicates that if a submission meets the criteria for “Test Rule 2” (first submissions and children, it should route to the “Regulatory/PPRC Scientific Review” map. Otherwise, all submissions (including those in Test Rule 2) should be routed to the “Triager” map.

Meta-Rules Once business rules have been established within a particular route, meta-rules can be used to organize and prioritize them as necessary. At least one business rule must be present in order for a meta-rule to be created for a unit. A unit can only have one meta-rule for each type of rule (Notifications, Questions, Routing, Validation). Three “Rule Criteria” are used in the creation of meta-rules: “Next”, “If True”, and “If False”.

Meta-Rules For example, choose which of your available business rules will serve as the “Parent Node” (i.e., the first one used):

Meta-Rules Next, follow the same procedure for “Child Nodes”, each of which should exist in a pre-determined order under the Parent Node, following the logic of the Rule Criteria. So, if a node is selected with “Next” as the criterion, it will automatically follow the previous node without any assessment of truth value. “If True” and “If False” will verify truth value before sending the submission to the next node, accordingly:

Testing As always, testing is extremely important to the development of a good routing schema. The more a tester can mimic the possible actions of both Lite and Premium users, the more confident she can be that the routes will work as expected once they hit prime time. In this way, having clearly defined roles (user, administrator, approver, etc.) for each of the testers involved can only help ensure that the test will be as successful as possible. It is also important to have as many of the “real world people” as possible involved in the testing process. For instance, if an external review committee will be reviewing protocol submissions involving children, inviting actual reviewers from that committee to participate in the route tests will both emulate the Production instance and provide de facto training for the reviewers as well.

Education & Trainings There are three main groups to focus on when providing training for newly-created routes: 1. Department Users (Research Community, Lite) 2. Technical Users (IRB Administrators, Premium) 3. Tangential Users (External Committee Approvers, Both) Each group requires a carefully tailored explanation not only of the technical “how-to’s” involved in the routing functionality, but also of their respective roles in the bigger picture of the electronic submission process.

Education & Trainings A variety of materials can be used for good education. Here is a (non-exhaustive) list of some effective ones:  Comprehensive manuals for administrators and end users.  Quick guides offering abbreviated “how-to” instructions on individual topics.  Correspondence (usually by ) to the community at large notifying them of the pertinent details of the release.  Large group training sessions with the purpose of outlining the updates/changes/enhancements forthcoming.  Small group training sessions with the purpose of offering individualized assistance for users.  Multimedia-based presentations or training sessions offered on a website.

Education & Trainings Yale’s HRPP utilizes all of the above methods for training where possible. Here is an example of the website we use to provide our end users with updated information and training materials:

Go-Live! Once it is clear that the electronic route is accurate and the potential users are trained, the route can be placed into Production. A good method for “testing” while in Production is to begin routing with a Pilot group first. This may require initial and subsequent refinements to the various components we’ve discussed so far. Keep in mind that as user groups grow, office procedures change, and system enhancements are released, routing should be viewed as a malleable process. Don’t assume that because your routes work now, they will work without tweaking for years on end.

Thanks! Adam Schechter, PhD Coordinator for Systems, Compliance, & Education Human Research Protection Program Yale University (203)