Solution Statement Template. Presentation title goes here in Arial 36pt regular Subheading/Speaker’s name in Arial 24pt regular Date in Arial Roman 24pt.

Slides:



Advertisements
Similar presentations
St. Louis Public Schools Human Resources Support for District Improvement Initiatives (Note: The bullets beneath each initiative indicate actions taken.
Advertisements

Project Management Skills for QOF leads Quality and Outcomes Framework Assessor Training.
The Roadmap to Successful Xpert Implementation - 37 steps -
Conducting Patient Safety Rounds with Staff. First Steps Set the stage –Unit and Hospital Leadership Support –Identify a “champion(s)” for each unit where.
Recent Emergency Study in Palestine Triage System At Al – Makassed Hospital Emergency Department Jamal Al-Wahadneh 2009.
Project leaders will keep track of team progress using an A3 Report.
Acknowledgements RHH ED staff Safety and Quality Unit RHH for their participation and valuable contribution Next Steps It is envisaged over the next 12.
1 1 Chapter 1 Specimen Management Professor A. S. Alhomida Disclaimer The texts, tables and images contained in this course presentation (BCH 376) are.
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Sutter Solano Laboratory Lean Six Sigma Project
E.S.K Loh 1 J.Y.H Lee 1 R.Y.L Yong 1 J.W.S Setoh 1 1)Department of Pathology and Laboratory Medicine, KK Women’s & Children’s Hospital, Singapore Process.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Skill Mix Solutions in Emergency Care Role of the Nurse Consultant Paula Bennett – Nurse Consultant Emergency Department.
PPA 502 – Program Evaluation Lecture 10 – Maximizing the Use of Evaluation Results.
Orientation to Performance and Quality Improvement Plan
Problem Management Overview
Overview of DMAIC A Systematic Framework for Problem Solving
0 Prepared by (15pt Arial) [Insert name of presenter 15pt Arial Bold] [Insert title] [Insert Hospital name] Month 200X (12pt Arial Bold) Understanding.
The Introduction of a Virtual Online Assistant (Live Chat)
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Allied health student training Pre-placement training requirements Welcome to the video-conference. This video-conference will be recorded. Your participation.
Right Patient, Right Blood
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
Edward M. Haugh Jr. ESC Consultant. III. Recommendations for Applying Outcomes Planning to ESC  I. Introduction to Outcomes Planning II. A Sample ESC.
Eastern Health: Improving ED to Ward Transfer
LOUGHBOROUGHCOLLEGE Business Support Self Assessment
Implementing universal Lynch Syndrome screening in a large healthcare system.
Planning for Resiliency. Primary Reference Emergency Management Principles and Practices for Healthcare Systems, The Institute for Crisis, Disaster and.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
1 FASTER TRANSFERS FROM THE EMERGENCY DEPARTMENT TO THE WARD Auckland City Hospital Presenter: John McTaggart Innovation Poster Session, HRT1215 – Innovation.
ENTER THE TITLE OF YOUR PROJECT HERE INNOVATION DISCOVERY EVENT Insert Date Names of Innovator(s): XXX Place your laboratory’s logo/logos here Department.
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
A GP for Me -A GPSC Initiative 2015 Quality Forum Dr. Brenda Hefford- Executive Director, Practice Support and Quality, Doctors of BC Shana Ooms, Director,
Karen McCleod, Sandwell and West Birmingham Hospitals NHS Trust Richard Johnson, Pan Birmingham Cancer Network.
Dispensary and Administration Site Information Presentation.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
Extended Scope of Practice Projects Request For Proposal Information Session Tuesday 28 February 2012, am Extended Scope of Practice – Physiotherapists.
The Health Roundtable Improving the patient journey through ED Presenter: Kate Jurd Health Service: Toowoomba Hospital Innovation Poster Session HRT1215.
ED Stream Workshop Acute MOC August 2013 ED Stream Workshop 1.
Internal Auditing Effectiveness
MicroLoan Foundation: Creating balanced staff incentives Daniella Hawkins, Social Performance Manager.
BUBBLES LAB Friday, September 19, 2014 IWBAT: analyze and evaluate appropriate charts, graphs, and tables. IWBAT: use SI units for measurement. IWBAT:
Roadmap & Actions Expert Consultation Health in All Policies.
Safer Start 8am Monday 08 th February – 8am Monday 15 February.
Template. Project Title : Facility: TeamSponsorCHR Data analysisProcess MappingPatients interviews  Key Findings Issue / Focus AreaMeasure#Root cause.
Update for nurses and phlebotomists taking blood samples for Transfusion in General Practice The Hospital Transfusion Team
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Effectiveness of risk management process towards error reduction in the laboratory at Sakra World Hospital AUTHORS: Dr. Shabnam Roohi Mr. Deepak Agarkhed.
Risk Assessment Meeting Introduction Slides --- Your Hospital’s Name --- Hospital at Night Patient Safety Risk Assessment:
6/11/2016 SIP I NOE Reduction Project Ann - Marie Ward Lab Services Group Leader.
Risk Assessment Meeting Introduction Slides --- Your Hospital’s Name --- Hospital at Night Patient Safety Risk Assessment:
Quality Management Checklist An essential guide to assist you, the quality expert, in enforcing the standards you expect on a daily basis across the whole.
What Can Go Wrong? How Often? How Bad? Is there a Need for Action?
LEAN SIX SIGMA PROJECT TEMPLATE
Instruction This template should be used Only for The Best Employee Engagement category. Template can be modified, subject to your company template or.
Risk Assessment Meeting
A quick tutorial in technical writing
Ward Stock Management Guide
The idea Policy Process Procedure.
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
5S-KAIZEN IMPLEMENTATION IN BMC
Date: NAME: Phone: ORGANISATION:
Objectives and Benefits Team and Timeline
Organizing Your Laboratory Notebook
Key Value Indicators (KVIs)
EVALUATION OF COUNTERMEASURES PDCA
EVALUATION OF COUNTERMEASURES PDCA
Proposal Title Grade-Level/Subject Area
ORDER > BOOK IN > BOOK OUT
Presentation transcript:

Solution Statement Template

Presentation title goes here in Arial 36pt regular Subheading/Speaker’s name in Arial 24pt regular Date in Arial Roman 24pt regular The Solution Background / Issues Highlight the issues and their root causes (as identified during the diagnostics) Solution Briefly describe the solution and point how it will fix the issue Feasibility To evaluate the ease of implementation, highlight in this section: The magnitude of the change. For this your may want to explain what is in scope and what is out of scope The resources required The timeframe until full implementation The potential risks / challenges to implement and how to manage them Major dependencies Solution title - Use 1 statement for each solution Reference # Ease of Implementation LowMediumHigh Project name Solution owner xxx Project owner xxx

Presentation title goes here in Arial 36pt regular Subheading/Speaker’s name in Arial 24pt regular Date in Arial Roman 24pt regular Benefits Expected impact on KPIs Other Benefits List other benefits not included in KPI Cost Solution title (cont.)- Use 1 statement per solution DescriptionCostFrequency KPI DescriptionBaselineTarget Cost LowMediumHigh Impact on KPI LowMediumHigh Does our solution have a positive impact on: Yes / No Patient Flow / Access Patient Outcomes Patient Experience Patient Safety Staff Experience Waste Reduction

Solution Statement Example

Presentation title goes here in Arial 36pt regular Subheading/Speaker’s name in Arial 24pt regular Date in Arial Roman 24pt regular The Solution Background / Issues NEAT performance for the hospital was on average 58% over the last 12 months, while our target is 75% Process mapping and data analysis highlighted that the turnaround time for pathology analysis was on average 2h33min. Tests is the number one delay for 65% of ED patients Root causes: 1)Pathology samples taken in ED are not differentiated from those taken throughout the hospital 2)No mechanism exists for urgency of sample to be communicated to laboratory staff Solution ED and Lab will agree on turnaround time for main tests (see attachment) ED and Lab staff will develop special ED stickers Lab will provide 6 education sessions to ED staff Research: Hospital Gama proved a 5% NEAT improvement through better labelling (med. Journal, 2013, ed Nov, p40) Feasibility Turnaround time will only be agreed for the 4 main tests: full blood count, EUC, CRP, NPA. These represent 80% of the ED urgent tests. No major resources required (stickers and time for 6 training sessions) Implementation from 01/02/15 to 10/03/15 Implementation led by Lab manager, closely supported by ED NUM and ANUMs No major dependency identified Major risks: 1)Non compliance of turnaround time: performance and impact will be reviewed monthly at committee meeting 2)New staff / on leave staff not trained: absent staff will be allocated a buddy, training to be recorded in training roster / welcome training, pamphlets available in storage room next to laboratory supplies Solution 1: Pathology Sample Labelling Reference #4Nsol1 Ease of Implementation LowMediumHigh 4Neat: Improving patient flow in the Emergency Department Solution owner Lab manager (Michael Blood) Project owner ED project manager (Greg Gantt)

Presentation title goes here in Arial 36pt regular Subheading/Speaker’s name in Arial 24pt regular Date in Arial Roman 24pt regular Benefits Expected impact on KPIs Other Benefits Patient satisfaction will be measured before and after the implementation Expectations will be clearer which will help staff prioritise their work, and increase their satisfaction Timely results can also lead to better patient outcome when time is critical This first project will strengthen working relationships between ED and lab Reduced repeated requests and blood collection Cost Pathology Sample Labelling (cont.) DescriptionCostFrequency Training time (6 x 30min) 6 x.05 x $60 = $180 Once (Feb 2015) Stickers and printing$50Monthly (ongoing) KPI DescriptionBaselineTarget Pathology turnaround time2h331h15 NEAT (impact of this solution)58%63% Cost LowMediumHigh Impact on KPI LowMediumHigh Does our solution have a positive impact on: Yes / No Patient Flow / Access Patient Outcomes Patient Experience Patient Safety Staff Experience Waste Reduction