Case Study _ Smart Art Team Type: Cross FunctionalTeam Size: 6 members Project Meetings: 12 Primary Metric: Specific customer complaint on average every.

Slides:



Advertisements
Similar presentations
Upgrading from Calibration Manager to Blue Mountain RAM
Advertisements

1 SmartFix Machines&Equipments Maintenance Software Design by I-TEAM.
Factory Objectives Value of Asset Management Strategies.
Outlook 2 Everything feels good now as prices are high. However...
Total Productive Maintenance
KPI Familiarisation.
Resource efficiency: cut costs in plastics processing Workbook 2: managing resource efficiency.
Delivering cost effective Project Management & Process Improvement Presented by Andrew Donnelly.
Business Analysis Identify Long Chain “Buy/Make/Sell” Business Processes Identify Business Requirements and Metrics 137 Critical Requirements Map Business.
MSAENV472B Implement and Monitor Environmentally Sustainable Work Practices Neale Farmer – Coordinator Major Environmental Initiatives – Hunter TAFE
Jidoka for Quality Improvement Lean en France, 20 May 2011 Yves Mérel, FCI Group Lean Director.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Overall Equipment Effectiveness (OEE) 1 OVERALL EQUIPMENT EFFECTIVENESS (OEE) Factory Pulse Logix Automation Systems Pvt. Ltd.
Overall Equipment Effectiveness (OEE)
Productive Maintenance
Process Industries Benchmarking Professor Munir Ahmad School of Science and Engineering Teesside University NEPIC Presentation.
IBM SPSS Solutions A SELECT INTERNATIONAL COMPANY.
Corrective & Preventive Action Programme l Corrective and preventive action managed by one programme l Closely linked to the internal audit programme l.
Business and IS Performance (IS 6010) MBS BIS 2010 / th September 2010 Fergal Carton Accounting Finance and Information Systems.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Shalagh Rigney, Tara Nolan, Kristen Sibilia March 26, 2008.
Duffuaa1 Module Objectives w Understand Key Measures For Maintenance Performance (MP) w Learn how to use these MP w Learn about Techniques for Continuous.
Taking care of our people Being good neighbours
BPT3133 – PROCUREMENT IN INDUSTRIAL MANAGEMENT
Total Productive Maintenance OVERVIEW. Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
LECTURE NOTE. WORLD-CLASS MANUFACTURER Mistake-free ● Fast ● Lean ● Flexible ● Environment-friendly TOTAL QUALITY MANAGEMENT PRODUCTS Delight customers.
Solution Overview for NIPDEC- CDAP July 15, 2005.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
Sustainable Consumption and Production
The “realities” of an Operations Manager. What is Operations Management ?
Driving and Sustaining Quality & Innovation in Manufacturing Processes Thursday, January 19, 20121Quality Presentation - EFY.
Sustainable Procurement & Life Cycle Analysis Heather Pearce 9 th February 2010.
© Copyright 2010 Dresser-Rand Gasket Cell Relocation [Revision: May, 2011] Team Members: Cody Willmart, Aaron Marcotte, Jacky Li, Daniel Swol, Tyler Borden.
Cost of Quality - COQ MGMT-5060 Operations Management.
1 Maintenance Performance Measures Management needs information of maintenance performance for planning and controlling the maintenance process. The information.
Case Study – Flowers Owing to client confidentiality, the grower’s business cannot be named. However, this is a real case study from The case reflects.
Procurement’s Impact on Logistics Business Marketing 880 Spring 1999 Bernard J. LaLonde Steven Robeano.
Clean Facilities… Sustainable Solutions Local Touch… National Reach.
Copyright © 2006 Pearson Education Canada Inc Chapter 10 Producing Goods and Services.
Presented by Linda Martin
Managing Your Energy Costs Energy Webinar Series This Activity received funding from the Department of Climate Change and Energy Efficiency as part of.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
L3: GP METHODOLOGY / 1 Asian Productivity Organization, Tokyo Overview and Methodological Framework of GP Methodology Guiding Principles of GP GP Methodology.
“Without the Cost of Waste …”
Trial & Prove The RouteMilestones 1-4 SM ‘Buy-in’ W/S 4 Day Launch Workshop/ Initial Training POLICY DEVELOPMENT & DEPLOYMENT Pilot Projects, Plant Clear.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
© Max Zornada (2005)Slide 1 The Cost of Quality and the Cost of Poor Quality "Defects and errors are not free. Someone makes them and gets paid for making.
Logistics Management LSM 730 Lecture 4 Dr. Khurrum S. Mughal.
Connecting the dots … between Finance and Operations in Telecoms Don van Splunteren VP Sales, NAAP Global Solutions.
DISTRIBUTION Distribution can be defined as an operation, or a series of operations, which physically bring goods manufactured or produced by any particular.
Introduction to OEE (Overall Equipment Effectiveness)
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
 Alan Barnard [Company Name] [Submission Title] LAA ENVIRO AWARDS 2010.
WHAT DOES CONTROLLING IN CHANNEL OPERATIONS ENTAIL? Utilize ROI as a tool to monitor performance Manage customer relationships.
Kaizen Focused Improvement Teams (F.I.T.) Training Pack.
Internal Mediation in Transport for London London Underground.
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
DL SHAH AWARD QUALITY COUNCIL OF INDIA QUALITY IMPROVEMENT & STANDARDIZATION IN THE LINE CARTON PACKAGING CATEGORY – SPICES DHARAMPAL SATYAPAL GROUP DS.
ME Summer 2013 Systems Engineering, Part II Session July 2013 Mr. Larry Hopp, CPL.
Supply Chain Management
AAtom ERP.
Sustainability & Carbon Management
LOGISTICS NETWORK.
Procurement’s Impact on Logistics.
Across the entire value chain
Rev Copyright ® Desco Industries, Inc. Rev:
Operations an exploration of basic manufacturing operations, forecasting, budgeting and control.
Presentation transcript:

Case Study _ Smart Art Team Type: Cross FunctionalTeam Size: 6 members Project Meetings: 12 Primary Metric: Specific customer complaint on average every 19 days causes $75k in rework annually Root Causes: Communication, Process Flow, Records management Outcomes: Analyse production conflicting communication channels Process map and modify work instruction flow Creation of ‘Specification Folders’ Purchase of filing equipment Ownership & accountability Production staff awareness training Overall Benefit: 90% reduction in customer complaints / rework; $67,500 saved

Case Study _ Screw Loose Team Type: Cross FunctionalTeam Size: 10 members Project Meetings: 12 / 5mths Primary Metric: Machine Set Up team spent 8% of ‘setting’ time searching for parts. Project Focus: Spare / consumable parts inventory control Root Cause: No sustainable and organised system in place Outcomes: Critical parts identification Min / Max stock levels set Portable parts trolley for consumable spares Reorder cards generated Awareness training for Set Up team Responsibilities allocated Audit process implemented Overall Benefit: $50,000 production opportunity minus $1,000 in materials and in- house implementation labour

Case Study _ The Innovators Team Type: Area basedTeam Size: 12 (across shifts) Project Meetings: 8 Primary Metric: Screen damages were costing $8,000 /week Project Focus: Reduce damages by 75% Root Causes: Machine settings, calibration, training, repair technique Outcomes: Blade angle trials and solution standardisation Operator training Manufacture calibration tool Modify repair technique Overall Benefit: $300,000 saved in reducing production stoppages and replacement materials purchase.

Case Study _ Outside the Box Team Type: Cross FunctionalTeam Size: 10 members Project Meetings: 6 Primary Metric: Bottling Line efficiency at 35%. Root Causes: Manning allocation to large batch packaging. Project Focus: Improve Overall Equipment Efficiency and produce to target. Outcomes: Study of out-feed bottlenecks Two shift approach Shift One: Supplementary labour for trial, increase headcount x 1 Shift Two: Shift 2IC manages supply chain to the line Overall Benefit: Trial shifts averaged 113% OEE (2% difference between shifts) Overall task averaged 84% OEE, inclusive of product changeover 63% increase in production rates during the trial ($110k bonus) Task completed with 72 man-hours of original planned labour to spare

Case Study _ Supa Green Team Type: Cross FunctionalTeam Size: 6 members Project Meetings: 11 Primary Metric: Production income generated per Power Unit consumed Root Causes: Lighting design, machine operation and maintenance Project Focus: To increase income to power usage ratio Outcomes: Lighting survey Install energy efficient lighting to the factory Repair sources of energy loss Installation of timers Staff awareness campaign Benefit / first six months, post solution implementation: 21% power efficiency; $19k savings. $700k production without power costs attached Increased benefit with Carbon Tax implementation

Case Study _ Logistic Nightmares Team Type: Area basedTeam Size: 7 members Project Meetings: 9 Primary Metric: 14% complaint to Inventory Control process Root Causes: Time, accountability, process deficiencies Project Focus: Implement system to attain <90% compliance Outcomes: Clarify and standardise Inventory Control process Schedule cyclic counts Set accountabilities and KPI’s Train logistics staff Overall Benefit: Compliance to Legislative Authority targets 100% compliant to target with warehousing operations Solutions were able to be replicated in another area