Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.

Slides:



Advertisements
Similar presentations
SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
Advertisements

Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
1 ETSO views on Transparency Urban Keussen Member of ETSO Steering Committee Head of Task Force on Congestion Managament ERGEG Public Hearing 6th July.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Update on transit compensation mechanism application in Baltics Arnis Staltmanis Head of International Project Department 16 September 2009, Vilnius.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Energy Agency of the Republic of Serbia
Securing competitive energy for industry A “target model” on market integration from the perspective of industrial energy consumers Florence Forum Rome,
Civil Societies Expectations on the Energy Union Providing Secure and Affordable Energy to EU Citizens EESC Hearing May S Nies Susanne Nies Corporate.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Walter Boltz Chairman, CEER Gas Working Group Enabling Markets Initial assessment of merging market areas & trading regions Gas Target Model.
Transparency in the Central West Electricity Regional Energy Market Office of Energy Regulation (DTe) MINI FORUM Paul Giesbertz.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Union for the co-ordination of transmission of electricity UCTE, 15 Boulevard Saint-Michel, 1040 Brussels, Belgium, UCTE comments on ERGEG.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
IG Meeting Flow-based Coordinated Auction Allocation Scheme for the CEE – Region Report WG – CA Christian Todem 18 th IG Meeting, Vienna April 30 th 2008.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
INTEGRATION PLATFORM FOR FUI REGION November 22th, 2010 Miroslav Hašek Unicorn Systems.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
ETSO Comments on the draft Congestion Management Guidelines
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Baltic Energy Market Interconnection Plan (BEMIP)
Walter Boltz Chairman, CEER Gas Working Group
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Presentation transcript:

Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006

Pursuing the Optimum. Two Paths Unilateral Auctions Bilateral Auctions Multilateral Auctions Market Coupling Unilateral ATC assess. Coordinated ATC assess. Technical Profiles Flow-Based When dealing regional capacity allocations, a maximised social welfare can be reached through two different paths:  market coupling first (sharing energy bids)  flow-based modelling first (optimal use of the system) Sharing bids path #1 Grid models path #2

ETSO Vision on Achieving the Optimum Effective and timely use of available data by TSOs, including  regulatory and market frameworks which facilitate free and confidential data exchanges  access to relevant data from market participants  efficient data exchanges between TSOs Progressive development of the ETSO regional flow-based transmission model

What is the Flow-Based Model? An improvement of the NTC/profiles concepts, supporting  regional auctions (explicit or implicit), complying with new CM Guidelines  a highly meshed grid Elaborated by TSOs, based on a reference state of the power system

What is the Flow-Based Model? cont. Adding more accuracy (=security)  preserving the zonal/hub model  reducing the impact of wrong predictions  increased but moderate volume of data to be exchanged by TSOs Step-by-step implementation possible  technical dry-run implementation  decentralised / centralised

Theoretical Comparison of Models Flow based modeling maximises the security domain allowing for more cross-border trade opportunities flow-based Security domain Coordinated ATC assessment max(A=>B+A=>C) Coordinated Technical profiles assessment B A C

Heading for Some Cultural Changes? Reaching the limits of TSO subsidiarity  Political will and compatible regulatory frameworks are both required  supporting free and confidential exchange of data between TSOs  supporting a single set of regional capacity allocation Rules Using a regional flow-based transmission model means that…  all capacity (explicit) or energy (implicit) bids are simultaneously cleared  the market will find its most efficient XB trades by itself  no more sub-optimal ex-ante sharing of fixed NTCs  congestion income is shared on a regional basis

What Roadmap for the Region? Integrating the national wholesale markets in this region should be seen as the priority  Central Western REM > 50 % of the IEM  interconnected to all other REMs Local initiatives should always be supported  implementation of market based mechanisms since end of 2005 on all interconnections  implementation of Trilateral Market Coupling in 2006

What Roadmap for the Region? cont. A common regional allocation of capacities through the integration of all spot markets as the natural next step in the region …and beyond! Aiming at the optimum thanks to the development of an underlying flow-based transmission model as the final target

ETSO ‘Flow-based’ Publications ‘List of data European TSOs need to pursue optimal use of the existing transmission infrastructure’, December 2005 ‘FMC-Flow-based Market Coupling’, September 2004 ‘Cross-Border Electricity Exchanges in Meshed AC Power Systems’, April 2004 ‘Coordinated Congestion Management, an ETSO Vision’, April