TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1.

Slides:



Advertisements
Similar presentations
Ensure Vendor/Engineer of Choice Product Quality
Advertisements

Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
BoRit Superfund Site Timeline
Software Quality Assurance Plan
1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
ASME Nuclear Conformity Assessment
Degree and Graduation Seminar Scope Management
SUBSAFE Approved for Public Release
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Radiopharmaceutical Production
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Westinghouse Non-Proprietary Class 3© 2013 Westinghouse Electric Company LLC. All Rights Reserved. 1 October 2013 Westinghouse Overview and AP1000 ® Plant.
© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
From Research Prototype to Production
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
May 2002[NUMUG] Listening to the Wind1 of 17 LISTENING TO THE WIND TVA Experience with Installation and Operation of Ultrasonic Wind Sensors Kenneth G.
Commissioning HVAC Systems: Lessons learned throughout
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Safety Department Fire Drills.
Vermont Yankee Decommissioning Update
Office of Nuclear Materials Safety and Safeguards
Flooding Walkdown Guidance
CR3 and Crystal River Energy Complex
Nuclear Power Update for The Society of American Military Engineers
Plant Vogtle Units 3 and 4 Alex Thirkell.
SNC/SCANA – New Build Configuration Management
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
Release 3 Update 07th March 2018.
UPPSALA UNIVERSITY_GERSEMI PROJECT
2015 January February March April May June July August September
Presentation transcript:

TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT Ed Freeman Engineering Manager 1

May Application for Construction Permits for WBN Unit 1 and 2 requested January Construction Permits for WBN Unit 1 and 2 issued October Application for an Operating License for WBN Units 1 and 2 Requested June Safety Evaluation Report for Operating License for WBN Units 1 and 2 (NUREG – 0847) issued September NRC “Show Cause” Letter to TVA Project History 2

Late WBN Unit 2 Construction Suspended May Nuclear Performance Plan (NPP) Describes Actions to Identify and Correct Problems at WBN December Safety Evaluation Report WBN NPP WBN Unit 1 (NUREG-1232) November NUREG-0847 Supplement 5 issued October FSAR Amendment 91 issued November Low Power Operating License for WBN Unit 1 issued February Operating License for WBN Unit 1 issued 3

Project History July TVA Formally Deferred WBN Unit 2 January 2007 – Detailed Scoping Estimating Planning Study July NRC Staff Requirements Memorandum August TVA Board Approves 5 Year Program for Completion of Construction of WBN Unit 2 August Construction Reactivation Letter July Construction Permit Extension 4

Installation Status Major structures complete System and component installations are substantially complete Approximately 6600 pipe hangers installed Substantial amount of instrument tubing incomplete Electrical cables 90+% pulled and terminated Some major components used in operating units – RCP’s, Charging Pump, Aux Feedwater Pump, RHR Heat Exchanger Equipment condition is good 5

Issues Related to Configuration Control Construction was stopped with incomplete documentation of installation status Some QA records were lost or incomplete Cable pull and termination cards were missing ASME data package assembly had not begun 79-02/-14 piping and hanger program documentation missing or not completed Operating units tended to use parts or whole components for maintenance replacements Very few as constructed drawings done 6

Objective for Completion Sound design supported by analysis Plant configuration that matches the sound design Construction completion statements or walkdown data for the configuration QA records for equipment and material ASME N-5 and N-3 forms signed off for applicable systems Refurbishment records establishing “as new” equipment condition Completed and successful test procedures documenting performance objectives met 7

Configuration Recovery Process Design Baseline Verification program – Review existing calculations produced for the licensing of U1, prepare a new U2 calc or make adjustments to the calculation for two unit operation – Review the original design documentation against current design standards and practices – Review/regenerate design criteria and system descriptions for every system – Program reviews (ie – Appendix R, EQ, 79-02/-14) for compliance status and objectives – Compare U1 existing design against U2 walkdown information – Review documentation of installations for incomplete or missing records 8

9 Configuration Recovery Process Field walkdowns Operational modes/flow diagrams “Pipe Tight” for Turbine Building Piping Isometrics Pipe Hanger detailed walkdowns (B31.1 and 79-02/-14) ASME N-5 regeneration Conduit installation and supports Cable Tray supports Cable terminations Some cable signal tracing Instrument Panels HVAC ductwork Embedded Plates 9

10 Configuration Recovery Process Walkdown information compared to U1 configuration control drawings, U1 design changes, U2 as designed drawings to determine the gap between installed and desired configuration Engineering packages issued for the gap Engineering Document Construction Release issued for incomplete construction or changes to existing design Process has controls for working in the vicinity of an operating unit Addresses ASME N-5 completion issues and deficiencies Construction closure process insures correct installation 10

WBN Unit 2 Refurbishment Refurbishment/Restoration - Performance of activities to restore a component to its former good condition. Inspections - disassembly to the extent necessary to verify or measure critical attributes (which may be affected by time), cleanliness, conditions of bearing or seating surfaces or components. Cleaning - Removal of dirt and other contaminants using pressurized air, water, approved solvents, etc., as necessary. System/component flushes, as part of the startup testing program, may be credited where applicable. Lubrication - Removal of old grease/oil from reservoirs, bearings, and other lubricated components and replacement with vendor specified or other engineering approved lubricants. Parts Replacement - Replacement of all “soft” parts which would degrade over time, such as gaskets, packing, elastomers, etc. “Passive Refurb” – Inspection of structures, piping, physical attributes to verify no significant pre-service degradation 11

12

13

Preoperational Testing Component testing to demonstrate installation/refurbishment of individual items Full RG 1.68 testing program – Individual system functionals – System performance tests Flushing program/System cleanliness Integrated Safeguards Testing April 2011 Integrated Leak Rate Testing July 2011 Cold Hydro May 2011 Hot Functional August

Turnover to Operations Turnover process will include a validation that: – Required design calculations and other documents are complete and unverified assumptions have been closed – Design packages have been completed in the field – As constructed and configuration control drawings have been issued – Special programs and corrective actions for previous construction deficiencies have been completed – Refurbishment is complete – Preoperational testing is complete 15

Watts Bar Unit 2 Project Status Tracking to complete within the 60 month schedule Critical path - delivery of key equipment – Control systems, valves, pumps Engineering and licensing activities are on schedule FSAR amendment has been submitted Construction bulk work is gaining momentum CCW and annunciator systems turned over for startup testing 16

DSEP TVA Board Decision Full Power Operation October 2012 FSAR Amendment / OL Update Ready for Fuel Load April 2012 Regulatory Framework Construction Reactivation letter Licensing Activity Significant Project Milestone Major Engineering Complete – March 2010 Detailed Project Schedule Commence Principal Construction Activities Turbine on Turning Gear – October 2010 Primary Hydro – May 2011 Hot Functional – August 2011 Integrated Safeguards Testing – Apr 2011 U2 Emergency Plan Drill – May 2011 Fill Ice Condenser – July WBN2 Construction Completion Status

18

19

20

21

22

23

24 Questions? ? 24