ViNGN CCI Build Update Broadband Business and Technology Committee Meeting October 7, 2013.

Slides:



Advertisements
Similar presentations
LAN & WAN Products Fiber Optic Cable Military Navy Shipboard Fiber Optic Cable Low Smoke Zero Halogen MIL-TAC Cables Military Tactical Fiber Optic Cables.
Advertisements

Our Capabilities Robust Integrated Systems Expertise & Resources, Inc.
CCNA Discovery 01 – Computer and Network Fundamentals On the web: cis140lmc.g-school.net © 2011 G-Tech Educational Services Presented by: Phillip Place.
Qualifications Experience Upper management has 25+ years combined experience in fiber optic communications.
Install L2 Switch Head End CATV
Massachusetts Broadband Institute Community Representative MassBroadband 123 Briefing Judy Dumont, Director September 10, 2010.
Sonja Wall OCAN Program Manager The ABC’s of OCAN: Anchors, Broadband, & Connecting Communities.
Fiber-Based Collocation Architectures C-POI CLEC Collo Fiber Entrance Facility CLEC Provided Fiber Facility Qwest Wire Center Typical Fiber-Based Collocator.
PLC Based Interlock systems Workshop 4-5 December ITER Organization Headquarters - St Paul-lez-Durance-France ITER Central Interlock System: Central.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Planning and Cabling Networks Network Fundamentals – Chapter 10.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
UC2B Canvassing to Support Customer Acquisition and Construction Dr. Jon Gant Research Associate Professor University of Illinois at Urbana-Champaign Graduate.
Broadband Coalition Meeting August 22, 2012 Agenda 1.Introductions and Organization 2.CCI Build-out Plans and Schedule 3.FAP Details (locations and layout)
Diploma in Information Technology Principles of Information Systems and Data Management Classroom Local Area Network & Internet.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
What is a Computer Network? Two or more computers which are connected together.
CISCO NETWORKING ACADEMY Chabot College ELEC Router Introduction.
Fiber Optics MECHANICAL SPLICES.
DATACOMMUNICATIONS An overview of the University’s network By Jacob Pagendarm.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
Fiber Infrastructure Revitalization SUNY Oswego’s case study for the future of your information infrastructure 6/15/05. Timothy J Kraft RCDD, CCNA,NNDE.
Jones/NCTI ™ in the Palm of Your Hand Installer Online Coming October 2009.
Rack Mounted Network Equipment Patch Panels Network Switch Router Rack Servers HDD Arrays UPS System Provides circuit protection and an uninterruptable.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Internet Through an ISP Networking for Home and Small.
OSC (Ohio Supercomputer Center) 1224 Kinnear Road, Columbus, OH (614) www.osc.edu THIRD FRONTIER OVERVIEW OPLIN MEETING April.
Multi-Use Network Update Presented to: Colorado Higher Education Computing Organization CHECO Spring Conference 2001.
Cisco Threaded Case Study
Tsunami preparedness in the US Virgin Islands Jacqueline J. Heyliger Deputy Director Virgin Islands Territorial Emergency Management Agency (VITEMA) Roy.
By H.B.O. Systems July 13, 2000 Presenters: Janet Hughes, John Banister, Karen Oliver.
1 NYSERNet Updates and the Next Generation Network Joint Techs Meeting Salt Lake City, Feb 2005 Bill Owens.
Wausau CAN: Marathon County, Wisconsin 18: Community Anchor Institutions to be connected 0: Community Anchor Institutions currently connected 0: Total.
For Discussion Purposes Only Digital 395 August 2-5, 2011 Vendor Overview for Electronics Requirements.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
1 Access, Edge and Core Networks. 2 Access networks and physical media Q: How to connect end systems to edge router? r residential access nets r institutional.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Harrison High School Network Information Harrison High School uses a Windows 2008 RS server and a Windows 7, XPN client platform with ring-star topology.
©2007 D-Link India Ltd. All rights reserved. xStack Switching East Coast Railways (ECoR) Bhubaneswar.
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
Gigabit Community Challenge Webinar February 22, :00 A.M. CST.
Connecticut Education Network “Forum” June 14, 2001.
Where we are... Public Interconnects: Number of peers on switch ~60 Aggregate bandwidth through switching fabric ~530mb/s average - ~680mb/s peak.
Illinois Rural HealthNet Alan Kraus, Project Coordinator Illinois Rural HealthNet Regional.
Introduction to Computer Networking Connecting to a Router M Clements.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
The Internet and the World Wide Web Group 2: Ashala LaShaina Kiera Jessica A Luis.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Internet Through an ISP Networking for Home and Small.
Icon Library Optimized for MS Office Applications
Planning and Cabling Networks Network Fundamentals.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
September 30, 2008 Jim Van Dyke, Web:
New FCC Forms 470 and 471 I 2013 Schools and Libraries Fall Applicant Trainings 1 E-rate Program New FCC Forms 470 and 471 Proposed Changes.
Networks DEVICES. Repeater device to amplify or regenerate digital signals received while setting them from one part of a network into another. Works.
Lincoln Public Schools Lincoln, Nebraska Lincoln Public Schools Work Session 10-Year Facility and Infrastructure Plan Update October 22, 2013.
Connecting to the Internet Through an ISP
LCLS Undulator Undulator Controls Integration Network Status April 29, 2008.
Planning and Cabling Networks
Beginner Eligible Services
Regional Broadband 101 Efforts and Impacts
Leader in Fiber Optic Management & Connectivity Solutions
Connecting to the Internet Through an ISP
Planning and Cabling Networks
Planning and Cabling Networks
Planning and Cabling Networks
How Computers Work.
How to build 2300 Miles of Fiber in Your Spare Time
Planning and Cabling Networks
Planning and Cabling Networks
Connecting to the Internet Through an ISP
Presentation transcript:

viNGN CCI Build Update Broadband Business and Technology Committee Meeting October 7, 2013

Agenda 1.Introductions 2.Fiber cable deployment progress 3.FAP construction progress and completion schedule 4.Connecting to CAI’s 5.Undersea cable deployment progress

STX02 DROPS: 100% CAI: 2/27 STX03 DROPS: 100% CAI: 0/13 STX04 DROPS: 0% CAI: 0/4 STX05 DROPS: 0% CAI: 0/11 STX06 DROPS: 50% CAI: 0/6 STX16 DROPS: 0% CAI: 0/7 STX15 DROPS: 76% CAI: 0/17 St. Croix (West) Backbone Fiber Installed Backbone Innerduct Placed

STX12 DROPS: 0% CAI: 0/1 STX09 DROPS: 57% CAI: 0/14 STX13 DROPS: 0% CAI: 0/7 STX17 DROPS: 0% CAI: 0/22 STX07 DROPS: 0% CAI: 0/4 St. Croix (East) Backbone Fiber Installed Backbone Innerduct Placed

STT01 DROPS: 44% CAI: 0/17 STT02 DROPS: 88% CAI: 0/8 STT05 DROPS: 0% CAI: 0/7 STT16 DROPS: 70% CAI: 0/30 St. Thomas (West) Backbone Fiber Installed Backbone Innerduct Placed

STT14 DROPS: 95% CAI: 0/43 STT12 DROPS: 84% CAI: 0/19 STT13 DROPS: 0% CAI: 0/6 STT10 DROPS: 67% CAI: 0/3 STT09 DROPS: 38% CAI: 0/8 St. Thomas (East) Backbone Fiber Installed Backbone Innerduct Placed STT11 DROPS: 88% CAI: 0/17

STJ01 DROPS: 0% CAI: 0/20 STJ02 DROPS: 0% CAI: 0/11 St. John Backbone Fiber Installed Backbone Innerduct Placed

Splicing the fiber cables into a complete network

Fusion splicing fibers and training a local tech Completed spliced fibers in tray

Splice tray enclosure for pole mounting

Fiber/Facility Access Point (FAP) STT10 (Nadir) Cisco ME 3800 Aggregation Switch (1)

FAP # Local NameContractor % Building completeGen/PowerHVAC Racking & DuctDC Power % Completed Drops BB Fiber Terminated Notes STX02FrederikstedBenton/JBC100 STX03Boy & Girls ClubBenton/JBC100↑ 10/ STX04UVIBenton/JBC100↑ 10/1110/1410/150 STX05Villa La ReineAT100 10/1910/2310/240 STX06Woodson SchoolAT100 10/2310/24 50 STX07Dept EducationAT90 ↑ 10/2810/27 0 Working on epoxy flooring and elect trim STX09Gov’t HouseBenton/JBCn/a 7557 STX12Cotton ValleyBenton/JBC100 ↑ 10/1310/18 0 STX13DPWBenton/JBC100 0 STX15Juan Luis HospitalEleven10 11/0211/23 76 STX16Roebuck – Ind. ParkBenton/JBC100 ↑ 10/0710/12 STX17WAPA RichmondAT15 11/0711/26 STT01VitemaBalbo 44 STT02UVIBenton/JBC 65↑ 10/2911/11 88 STT03Bonne EsperanceCancelled Cancel STT05Estate DorotheaBenton/JBC 5 hold STT09Eudora KeaneBenton/JBC 100 ↑ 09/2910/30 38 STT10NadirBenton/JBC 100 ↑ 10/0411/02 67 STT11Ft. MylnerRumina 65 ↑ 11/1211/14 88 STT12Schneider HospitalBenton/JBC 100 ↑ 10/1111/05 84 STT13WICO – HavensightBenton/JBC 15 ↑ STT14Boy ScoutsApex Pending reassignment 100 STT16Nisky CenterRumina 75 ↑ 10/2411/09 70 STJ01Cruz BayCustom 100 ↑ 10/2911/17 0 STJ02Myra KeatingCustom 100 ↑ 11/0311/20 0

Super FAP STX02 (Frederiksted): Cisco ASR 9006 Core Router (1) Cisco ME 3800 Aggregation Switch (2)

Community Anchor Institutions Schools…………………… Libraries……………………. 7 Healthcare Providers….. 19 Public Safety……………… 42 Colleges……………………. 4 Government Offices…… 124 Public Broadcast Sys…. 2 Community Centers…… 37 Total 316 viNGN is bringing a 4-fiber cable and interface to each CAI at no cost to them and which is capable of delivering at least 1 gigabit service through an ISP of their choosing!

Athalie McFarlane Petersen Public Library-Frederiksted

Aerial Attachment Building Entry Point

Patch Panel Cisco ME 3400 Premise Aggregation Switch

…and 100 megabit+ service becomes a reality in the USVI!

CAI Connection Schedule

Beach Manhole Installations

Summary and Conclusions Construction is proceeding on all aspects of the network. As CAI’s are connected and their segment of the network is lit, gigabit service may begin. Completion of the network build is expected by year end 2013.