OPMA 5364 Project Management Part 7 Project Risk Management.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PROJECT RISK MANAGEMENT
Project Management - Part 2
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Project Uncertainty Management.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Engineering Economic Analysis Canadian Edition
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Chapter 7: Managing Risk
Project Management Techniques.
Projmgmt-1/33 DePaul University Project Management I - Risk Management Instructor: David A. Lash.
Project Risk Management
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
8 Managing Risk Teaching Strategies
Prepared by: Michael Palazzo
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
© Harry Campbell & Richard Brown School of Economics The University of Queensland BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets.
Project Management Part 7 Project Risk Management
PMI Knowledge Areas Risk Management.
Chapter 11: Project Risk Management
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
S.Cholette, based on McGraw-Hill/Irwin Managing Risk.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
Quick Recap.
Uncertainty in Future Events Chapter 10: Newnan, Eschenbach, and Lavelle Dr. Hurley’s AGB 555 Course.
Time-Cost Tradeoffs Time-Cost Tradeoff Example Time-Cost Tradeoff Example (cont’d) Project Duration (weeks)Critical Path(s)Task(s) Reduced Total Direct.
Information Technology Project Management – Fourth Edition By Jack T. Marchewka Northern Illinois University Power Point Slides by Gerald DeHondt Grand.
© The McGraw-Hill Companies, Software Project Management 4th Edition Risk management Chapter 7.
程建群 博士 (Dr. Jason Cheng) 年 03 月 Software Engineering Part 05.
Advanced Project Management Project Risk Management Ghazala Amin.
Risk Management Handbook by H Global Managing Project - Group H Samuel SuarezMark McCann Ankit TanejaNazmul Alam LaurenceHsuTony Huang Farid MojahediEddie.
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Q N U Schedule Risk Management By Ursula Kuehn, PMP, EVP UQN and Associates.
1 3. M ODELING U NCERTAINTY IN C ONSTRUCTION Objective: To develop an understanding of the impact of uncertainty on the performance of a project, and to.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
SOFTWARE PROJECT MANAGEMENT
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Chapter 7 : Risk Management – part 2
Risk planning Risks can be dealt with by: Risk acceptance – the cost of avoiding the risk may be greater than the actual cost of the damage that might.
1 Critical Chain Project Management  A modern approach to dealing with uncertainty in project management (an alternative to PERT)  Developed by Goldratt.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Risk Management.
Project Planning & Scheduling
The Project Schedule and Budget
Chapter 11: Project Risk Management
Managing Project Risk Chapter 8 Copyright 2012 John Wiley & Sons, Inc.
Project Planning & Scheduling
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
PROJECT MANAGEMENT WITH CPM/PERT.
PROJECT RISK MANAGEMENT
Monte Carlo Schedule Analysis
Software Project Management (SPM)
Managing Service Projects
A New Concept for Laboratory Quality Management Systems
Presentation transcript:

OPMA 5364 Project Management Part 7 Project Risk Management

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.2 Topic Outline: Risk Management Project risks and risk management Identification of risks Risk assessment and risk analysis Contingency planning Time and cost padding Expected values Risk management exercise PERT analysis Computer simulation analysis

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.3 Project Risks Uncertainty  a random chance that something will happen, with no way to control whether it happens Risk  an uncertain event or condition that could negatively impact project performance Each risk has a likelihood, or probability, of occurring and possible outcomes if it does occur

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.4 Managing Risks Since the project manager is responsible for project success, he or she can increase the likelihood of success by better managing risks Risk management is a proactive approach to dealing with uncertainties rather than a reactive approach Some risks can be disregarded and some can be avoided, but others should be planned for

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.5 Project Risk Management Risk management in projects involves: Identifying risks Assessing and analyzing the likelihood and impacts of risks Trying to reduce the uncertainties (by gathering more information or making different decisions) Trying to lessen the impacts of risks Developing contingency plans for critical risks Monitoring risks as the project progresses

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.6 PMI’s View of Risk Management Risk management consists of 6 subprocesses: Risk Management Planning –How to approach and conduct risk mgmt. activities Risk Identification Qualitative Risk Analysis –Assessing likelihoods and possible outcomes Quantitative Risk Analysis –Computer simulations; decision tree analysis; etc. Risk Response Planning Risk Monitoring and Control

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.7 Identification of Risks Identifying all of the possible events or conditions that might occur and may negatively impact project performance A brainstorming session with the project team can be a helpful way to ensure that all important risks are identified Determining symptoms or warning signs that indicate when the risk is about to occur Determining root causes of the risk

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.8 Risk Assessment This info. should be developed for each risk: Description of risk All the possible outcomes of the risk The magnitude or severity of the outcomes Likelihood (probability) of the risk occurring, and likelihood of each possible outcome When the risk might occur during the project Interaction of the risk outcomes with other parts of this project or other projects

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.9 Risk Assessment Matrix RiskLikelihoodSeverity Detection DifficultyWhen System Crash LowHigh Startup Software Glitches HighLowMedium Post- Startup Users Dissatisfied Medium Low Post- Startup Hardware Malfunction LowMedium Startup

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.10 Risk Analysis Tools Probability analysis Decision tree analysis Monte Carlo simulation analysis Life-cycle cost analysis Delphi techniques for consensus Technology forecasting Game theory analysis PERT analysis Sensitivity analysis Expected value analysis

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.11 Reducing Risks Try to reduce uncertainties (collect more information, use more reliable vendors, design for easy production, don’t use leading edge technologies, etc.) Try to reduce the severity of potential outcomes (purchase insurance, convince customer to share the risk impacts, train employees how to respond quickly, etc.)

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.12 Contingency Planning A contingency plan is an alternative plan used if a risk event or condition occurs. Examples: Having a backup supplier for a key material Carrying a safety stock for a key part Having an alternate distribution channel to send products to China (air instead of boat) Having hurricane evacuation plans

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.13 Time and Cost Padding Padding is a commonly used approach to address risks, since it is very easy to implement and since it protects against most minor risks Padding refers to inflating the original time or cost estimates for activities or for the project Unfortunately, this leads to longer project durations and higher costs

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.14 Time and Cost Padding People will generally use up as much time and money as they are allowed (if you don’t use it you lose it!) Student syndrome  if extra padding is built into activity time estimates, some people are likely to procrastinate getting started, and then the protection against risk is lost Although padding can be useful in reducing the severity of risk, it can also lead to inefficiencies and waste

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.15 Expected Values A construction manager is trying to decide what size crew to schedule for tomorrow based on weather: Weather Probability: 10% 20% 30% 40% Expected Alternative Nice Cold Rain Snow Value Large crew $860 $710 $160 $-350 $136 Med. crew $147 Small crew $179 sample calculation: Large .10(860)+.20(710)+.30(160)+.40(-350) = 136

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.16 Risk Management Exercise First Technology Equipment case (25 minutes) Divide into small groups Read case Discuss the issues and answer 2 questions: –Use expected value to decide if it’s economically better to make or buy the component? –Why might management opt for other than the most economical choice?

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.17 Uncertain Task Durations Probability distributions Discrete, uniform, triangular, normal, beta, etc. Most common way to consider task uncertainty is to estimate the most likely, pessimistic, and optimistic durations. PERT analysis assumes a Beta distribution for each task

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.18 Estimating Task Times (with PERT) Activity duration estimates: a=optimistic, m=most likely, b=pessimistic time Expected task duration: T e = (a + 4m + b)/6 Variance of task duration: Var = [(b – a)/6] 2

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.19 PERT Example Task Pred. Opt. Most Likely Pess. T e Var a b c a d a e b f b gc,d h e i f j e,g kh,i T e = (a + 4m + b)/6 Var = [(b – a)/6] 2

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.20 PERT Example Use T e values for task durations on project network to compute slack values. The results of the new computations still shows path b-e-j as the critical path, with an expected project duration of T cp = = Var cp = = StdDev cp = sqrt(2.833) = MS Project with 3 task durations

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.21 Computer Simulation Analysis General purpose simulation software can model how many products flow through all the machines in a factory and on to the warehouse. This capability is much more than what is needed to simulate projects. Monte Carlo simulation is much simpler type of simulation analysis that we can use to model the uncertainty of task durations and costs. Crystal Ball are two such packages.

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.22 Crystal Ball and Project Analysis Crystal Ball allows you to specify any type of probability distribution for each task. You specify all precedence relationships. It then “shoots” random numbers into your probability distributions to simulate thousands of completions of the project. The result is a probability distribution of the total duration of the project, from which you can answer the what-if questions about how long the project might actually take.

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.23 Goldratt’s Critical Chain Assuming that an activity duration is known leads to underestimating project durations Because of this, people tend to pad their time estimates This may result in the “student syndrome” –What is that? This in turn leads to procrastination, which can then result in missing the finish date

Copyright 2004, Dr. Greg FrazierPart 7 - Project Risk Mgmt.24 Goldratt’s Critical Chain Add safety time buffers at strategic points in the project network Safety time buffer at end of critical path is called a project buffer Safety time buffer just before where noncritical paths feed into the critical path is called a feeding buffer.