Asset Operations Webinar April 30, 2015. Slide Title 2 Asset Operations Solutions 2 Consistent process to track plant conditions and capture changes –

Slides:



Advertisements
Similar presentations
EasyDirector® Simplifying the way you manage your business... Full-Featured Contact & Customer Relationship Management Tool Prepared by AITechConsulting.
Advertisements

Highlights: Simplify or expand data required to track time and attendance Configure timesheet formats by individual or group Maintain consistency with.
“The Honeywell Web-based Corrective Action Solution”
SupportCenter Plus Product Overview. Overview 1.What is SupportCenter Plus (SCP) 2.Benefits of SCP 3.Licensing & Pricing 4.Questions.
LeadManager™- Internet Marketing Lead Management Solution May, 2009.
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
Main Menu F3 Exit = Press F3 to exit this screen. Commonly Use Keys: F4 Prompt = Position cursor in front of ‘?’ location and press F4 to display a list.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
HP Quality Center Overview.
1 Low Load Process Jarreau Cycle Objectives l Review applicable NERC Standards that apply l Review CDP 2.6 Low Load Condition Procedure l Describe.
For MIP Fund Accounting Software
PacifiCorp-CAISO EIM Initiative Overview
Compliance on Demand. Introduction ComplianceKeeper is a web-based Licensing and Learning Management System (LLMS), that allows users to manage all Company,
Monitoring a Pipeline and Sharing Data with Key Customers How to do this when you own the pipeline but do not operate it!! Bert Stipelcovich IT Manager.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Employee Central Presentation
© 2001 National Burglar & Fire Alarm Association Chapter 10 The Central Station –24 hour /7day Operation –Receive Signals –Process Signals –React.
Ground Control™ Document Control and Training Manager
SchoolReach FEATURES: Requires No Hardware, Software or Phone Lines to In-stall Launch Calls via Phone or Web Site Detailed Reporting by Answer Type: Live.
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
 Power Costs, Inc All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced without permission.
PCI GSMS Bid-to-Bill Solution for SPP Market
Oracle Finance Overview for IT Advisory Group September 2004.
IdentiTrip 2006 Our Skills Making your Job Easier.
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
Fleet Performance and Reliability in Generation Utilities
Employee Central Administration
 Power Costs, Inc All rights reserved. Confidential and Proprietary to Power Costs, Inc. May not be distributed or reproduced without permission.
PCI Webinar on Using PCI Energy Accounting System to Validate Meter Data March 5, 2015.
1 Introduction to TankWorks Product Scheduling and Inventory Management for Liquid Terminal Operations.
Ripple Technologies, Inc 7/98 LogCaster. Ripple Technologies, Inc 7/98 LogCaster NT Real Time System Monitoring.
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
Event Management & ITIL V3
© 2008 IBM Corporation ® IBM Cognos Business Viewpoint Miguel Garcia - Solutions Architect.
IdentiTrip 2006 Our Skills Making your Job Easier.
Computer Emergency Notification System (CENS)
Listen to Your Meters! Pradeep Murthy SunTec Business Solutions.
3 rd Party Registration & Account Management SMT Update To AMWG January 20, 2015.
NPRR 219 & Outage Scheduler Enhancement Workshop April 28, 2014.
Oracle AP/PO In the Shared Services Environment Management Production and Control Systems.
3 rd Party Registration & Account Management SMT Update To AMWG June 16, 2015.
IPortal Bringing your company and your business partners together through customized WEB-based portal software. SanSueB Software Presents iPortal.
Developing Policy and Procedure Management System إعداد برنامج سياسات وإجراءات العمل 8 Safar February 2007 HERA GENERAL HOSPITAL.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
IdentiTrip 2006 Key Features & Benefits All data imported from MIS system Quick MIS upload annually for new intake and class changes No manual input of.
Course # Unit 2 - OEP and PEMS. Unit 2 OEP and PEMS HQ OEP  OEP Mission  EP Website PEMS  Overview  Benefits  Current Functionality 
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
Managing Reliability and the Markets with PI
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
HP PPM Center release 8 Helping IT answer the tough questions
IdentiTrip Key Features & Benefits All data imported from MIS system Quick MIS upload annually for new intake and class changes No manual input of pupil.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Proficy Workflow for Small/Medium Utilities Wholesale Power Cost Calculations Use Case.
TAC Report to the ERCOT Board
E-NOTIFY and CAER OnLine Training
CPDe Event The Changing Value in Flexibility 19th April 2018.
Lawson ProcessFlow Overview and Actual ProcessFlow Solutions
SupportCenter Plus Product Overview.
System Start-Up and Shutdown
ZTE Customer Request Self-Service Portal Operation Guide V1.0.5
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Authority on Demand Control Authority Rights & Emergency Access
iLab Training for VUMC Departments & Users of VUMC Core Groups
Presentation transcript:

Asset Operations Webinar April 30, 2015

Slide Title 2 Asset Operations Solutions 2 Consistent process to track plant conditions and capture changes – Improve communication – Reduce duplicative recording – Increase consistency – Standardize processes – Alert / warn on deviation, data-not- provided-by-deadline – Audit data entry, approval, and submittal

Slide Title 3 3 In a nutshell ModulePurpose Outage ManagementCapture and manage planned, urgent, and emergency events Journal Logging Application. Automated journal logging for operations, plants, and other departments Plant Instructions Workflow Messaging between Dispatchers and Plant Controllers Plant Interface Allow the power plants to declare unit limits, ramp rates and other characteristics. Allow plants to view day-ahead schedules and (backup) dispatch instructions GADS Used to manage Generating Availability Data Systems (GADS) event lifecycle, including outages, derates, reserve shutdowns, and metrics Energy Scheduling Automate declaration and ISO Self-Scheduling of Qualifying Facilities (QF) and Must-Take Resource Contracts

Slide Title 4 Scenario #1 – Forced Outage event automating a Journal Entry Scenario #2 – Declaration of Limits Change from a Plant Scenario #3 – Issue Message from a RT Operator to Power Plants Scenario #4 – Issue Instruction for a Manual Change of Load – Issue Instruction to reach Set Point 4 3 Scenarios

Slide Title 5 Leverage PCI’s Journal Technology A recording of any occurrence the impacts power system operation or business Searchable Auditable Configurable – Create – Customize – Automate 5 Operator Logging

Slide Title 6 6 Operator Logging  Utilize the journal to enter and monitor events  Record various event types throughout the day  Monitor daily events in a rolling report grouped by Operating Date and Hour Ending  Many Default Log Types provided “out-of-the box”  Custom Log Types may also be defined Each log type has a unique definition of attributes Attributes may be required Attributes may utilize GenBase data

Slide Title 7 Example Business Applications  Operator annotation of events: –Record a brief outage (unit Bravo unresponsive for 10 minutes)  Record operator action –Checklist of Shift to-do-list.  Personnel conflict –Plant operator refused instruction  Deviation from schedule/dispatch –Operator instructs plant to back down from dispatch point due to negative prices  Internal system failure –Computer failed to respond. Rebooted computer. Used backup process.  Inter-tie checkout –Record checkout with counterparty, counterparty agent and time of checkout  Uses: Settlement, Legal, Managerial, Compliance 7

Slide Title 8 8 Suggested Log Types Log TypeDescription Outage Log Logs approval of forced outage records. Automatically generated on approval by GSMS Outage Management. Ops Superintendent Journal entries as chronicled by the operations superintendent. Security - The following roles/group will be granted WRITE access to these logs by default: Superintendents System Log Log used by dispatchers only Security - The following roles/group will be granted access to these logs by default: RT Dispatchers Fuel Issues Notes pertaining fuel or issues with fuel supply Security - The following roles/group will be granted WRITE access to these logs by default: Plant Management, Plant Operations, Superintendents, RT Dispatchers, DA Analyst Power Marketing Notes related to sales and purchasing (trades) Could split Power Marketing into two log types: RT Trades and DA Trades or use an attribute to sub-group them Security - The following roles/group will be granted WRITE access to these logs by default: Superintendents, RT Dispatchers, DA Analyst CurtailmentsCouple journal with PCI e-tag application to automatically log tag cuts Security - The following roles/group will be granted WRITE access to these logs by default: Superintendents, RT Dispatchers, DA Analyst

Slide Title 9 9 Add Journal Entry User can add Journal Entries User can filter, edit, or export Journal Entries Journal Entries can happen in RT, DA or any other time

Slide Title 10 Sample Log Report

Slide Title 11 Scenario#1: Automated Journal Entry Journal – Outage Log Triggered from Forced Outage Event (B) distribution may be configured to issue notices of Events B A Coal Pl User records a Forced Outage (A)

Slide Title 12 Outage Management Planned Outage Forced Outages: Urgent and Emergency Events Plant Test Schedules PSS / AVR Events

Slide Title 13 Plant Interface 13 Make Daily Declarations of key offer inputs Notification and approval process to Front-Office for inclusion in Offers Auditable

Slide Title 14 PI MW Limits Hourly Limit Declarations. Effective until changed

Slide Title 15 PI: Ramp Rates Ramp Rate Curves Default Ramp Rate Choice for unit offers

Slide Title 16 Startup Parameters (A) (B) (C) Capture Other Unit Characteristics such as Start Times, Costs, and Fuel Requirements (A) Start-up Limits (B) Notification Times and current Temperature State (C)

Slide Title 17 PI: Requests & Approvals Open Request Approve Request

Slide Title 18  Used to created auditable and systematic procedures between departments within an organization  Message Categories: Broadcasts Instructions  Records 3-part communications between parties. 18 Plant Instructions

Situational Awareness Column Group 1 Columns Group 2 Split screen provides monitoring for ~70 units without screen scroll (A) Select 1 or more Units or Plants and choose an Action (B) to issue an Instruction (A) (B)

Slide Title 20  Capability for a group to send a message to one or more other users  Spotlight: An Operations group can create, edit and send messages to one or more Plants For commonly-used messages, the system will allow Dispatchers the ability to send pre-formatted messages. Plants will be required to acknowledge messages. Authorized users will be able to view and search historical messages Broadcasts

Slide Title 21 Add new Broadcast

Slide Title 22 o Manually Change Load o Go To … o Go To Emergency Max o Go to Emergency Min o Hold Generation o Go To Set Point o Change AGC Block o Start Up Procedure o Shut Down Procedure o Change (MSU) Configuration Block o Custom Instructions  Capability for one party to deliver instructions to others Spotlight: Managing operations instructions to plants Multiple types of instructions: Requires response by the Plant Control Room within 3 minutes Plants is required to acknowledge messages Authorized users may view and search historical messages

Slide Title 23

Issue – Startup Instruction

Startup Response

Slide Title 26 LocationUserContext Plant SitePlant ManagerPlant Plant SitePlant OperatorPlant Plant SitePlant ViewerPlant Plant SiteCo-ownerPlant Plant Site3 rd Part ContractPlant / Office TradefloorReal Time DispatcherReal-Time TradefloorReal Time TraderReal-Time TradefloorSuperintendentReal-Time TradefloorDay Ahead AnalystPlanning Outage CoordinatorPlanning VariesGADS AdminGADS Back OfficeSettlement AnalystSettlement Validation RegulatoryComplianceAudit / Verification ITAdminAll 26 Who benefits?

Slide Title 27