Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Conservation Action Planning Key Capacity Factors for Achieving Lasting Results.
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
SOFIA Stratospheric Observatory for Infrared Astronomy DCS PDR at RIT3/7/2000 DCS Preliminary Design Review Sean C. Casey USRA Senior Scientist Lead Scientist.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
An overview of the electronic work permit system in use at the ISAC facility ISAC Electronic Work Permit System Rob Shanks, TRIUMF, Vancouver CANADA,
Mechatronics: An On-Boarding Corporate Training Example Jay Bouis Coordinator of Technical Training The Community College of Baltimore County Penny Jung.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
SACS Reaffirmation Project Compliance Certification Team Leaders Meeting Friday, August 27, – 11:00AM 107 Main Building Jennifer Skaggs, Ph.D. SACS.
Exoplanet Exploration Program Large Binocular Telescope Interferometer (LBTI) Operational Readiness Review (ORR) PI: Phil Hinz, UA PS: Rafael Millan-Gabet,
Collaborative Work Package Criteria Suitable for accomplishing in a period of 90 days to 1 year. Work should fall within the expertise of one or more consortium.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Elements of Effective Behavior Based Safety Programs
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
MWA Operations Management Plan (OMP, v. 3) Ron Remillard (MIT); MWA Project Meeting, June 6, 2011.
Get Your "Party" Started: Establishing a Successful Third-party Evaluation Martha Thurlow, Ph.D. & Vitaliy Shyyan, Ph.D.—National Center on Educational.
Solar-B SOT/FPP 1 SOT April 2006Ted Tarbell SOT Collaboration & Data Policy Ted Tarbell, for the Science Working Group 18-Apr-2006.
SACS Reaffirmation Project Compliance Certification Team Orientation Overview Thursday, September 30, – 11:00AM 209 Main Building – Lexmark Public.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Data Processing Progress.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Magellan F/5 Status Eavesdropping PISCO Andrew Szentgyorgyi 25 Apr 2011/Pasadena 4/25/111Magellan SAC/Pasadena.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 FLITECAM December 11, 2008 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 FLITECAM April 28, 2009 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Global Change Master Directory (GCMD) Mission “To assist the scientific community in the discovery of Earth science data, related services, and ancillary.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
March 12, 2003 S.Panacek Control Room Logbook (CRL Abstract Updates from Last Status Report Other News Participants, Timeline, and Deliverables.
Software Configuration Management
IS301 – Software Engineering V:
Operations Concept Simon Radford and Operations Committee
User instrument policy
EVLA Advisory Committee Meeting
Requirements Management - I
Report of the Technical Subcommittee
Information system analysis and design
Presentation transcript:

Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012

Current f/5 Run f/5 Campaign in progress (Megacam tonight) 2012A run 10 Mar - 22 April Instruments are scientifically robust Demand is high Scheduling for 2012B, 2013, &c subject of discussion later

Status of Instrumentation MMIRS and Megacam meet optical/efficiency/performance specifications Mechanical systems – stable/spares on site Electrical systems – stable/spares on site Computers/network – stable but slight concern about spares (DOsip to comment?) Software – stability needs improvement

Support Personnel Vincent Suc (EE) continues to support startup/shutdown Vincent also continues to upgrade/maintain equipment between campaigns, supports upgrade campaigns Igor Chillingarian (SW Scientist) on Cambridge staff to develop MMIRS data reduction pipeline Igor is engaged in observing/debugging/observer support Igor functions as startup MMIRS operations John Roll, Maureen Conroy, Ann Matthews (SW Eng’s) maintain and upgrade software ASz and Brian McLeod continue to support observing on site Warren Brown now Director of Telescope Data Center Warren supervises Cambridge staff activities archiving & validating data Remote software maintenance from Cambridge is extremely effective

Support Personnel Planning Harvard plans to maintain status quo support level as long as it is required Magellan instrument specialists would like to become more engaged in and knowledgable about MMIRS and Megacam science operations Technical staff is becoming more skilled at mounting and demounting f/5 instrumentation CfA will continue dialogue about necessity of Vincent’s support – Vincent is expected to complete PhD in months – If Magellan & CfA feel this level of support is required, we must start a search for a successor in ~10 months

Achieving Software Stability To date, frequent upgrade, bug fixes, enhancements &c have compromised software stability Stability is improving Need to achieve level of stability where Magellan staff can do routine maintenance and operation Dave Osip’s criterion – it should possible for mountain staff to mount f/5 and start operations without CfA intervention

Povilas, Dave O., Brian, John, Maureen, Ann & Ian to compile comprehensive list of software problem, desired/required upgrades and enhancement All parties to hold a “triage meeting” to sort remaining tasks by priority: – Functionality/fixes essential to achieve commissioning – High desirable software task we will set as goals, but not requirements – Software functionality/performance elements that would be really nice, but we will probably not get to Achieving Software Stability (II)

Context for Triage Process Magellan operations assume observers are reasonably skilled and experienced Some light support from staff is provided, but expectation is that observers will know how to take their data We are rapidly reaching a point where the instrumentation works for observers who know what they are doing There is room for improvement, but at this point in time, with very few exceptions, people who know what they are doing get good data

Action Item List Create triage list Schedule software tasks Focus on transfer of information to instrumentation specialists Continue trnasfer of information on instrument mounting to Magellan staff Change u’ filter in Megacam Add final grism to MMIRS Prepare for commissioning

Commissioning f/5 Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012

Commissioning Plan Performance, mechanics, electronics, computer ready for commissioning. Software is stabilizing, but not ready for commissioning Magellan and CfA staff will develop triage list CfA will draft a timeline to address top-tier tasks in the next ~1 – 1 ½ months Draft timeline will be submitted to SAC Will require several months to complete tasks Required commissioning documentation plan will be delivered to Consortium for commissioning in TBD months

Topic for Discussion Many (most?) software issue involve telescope interfaces For instruments with complicated telescope interfaces and high multiplicity of operating modes, might reevaluate balance of consortium and institutional engineering time levies to commission instruments Especially vis-á-vis AO