Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.

Slides:



Advertisements
Similar presentations
1. 2 CASE STUDY NEW CONSTRUCTION PUBLIC SECTOR Case study by SEDAC What they got… ▪Prescriptive Incentive for individual measures. ▪They did not model.
Advertisements

RE-THINK McGILL About sustainability Jeanne M. Wolfe School of Urban Planning.
1Taylor Engineering, LLC Group Think Mark Hydeman, P.E., FASHRAE Taylor Engineering, LLC
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
LEED Gold Woodward Academy Math-Science Building Leadership in Energy and Environmental Design.
Green Building Technology Case Studies in Energy and Environmental Leadership Clay Nesler VP, Global Energy & Sustainability Johnson Controls, Inc. Milwaukee,
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Energy Sustainability at University of Illinois Urbana-Champaign Yu Xu.
LEED CERTIFICATION IN THE RETAIL ENVIRONMENT Maggie Benson and Isabelle Bouthillier Project By:
Sustainable Design & Construction at Yale University July 2009.
Sustainability at UCSB Campus Perrin Pellegrin Sustainability Manager Perrin Pellegrin Sustainability Manager.
Sustainable Design Energy Sciences Building. 2 Sustainability Regulations DOE final rule [10 CFR part 433] (30% better than ASHRAE) DOE Order 430.2b:
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
BECOMING GREEN Santa Margarita High School Academic Building.
Sustainable solutions to large scale architecture, urban planning and design
District Energy Corporation Sustainable Project SW 40 th Thermal Energy Facility To Serve the New Lancaster County Adult Detention Facility April 2011.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Energy Efficiency Office, EMSD
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Learning by Design Using LEED to enhance teaching and learning.
Ecological Design: Creating the Green Mountain Center for Sustainable Living Deirdre Huzzard, Environmental Studies with a Concentration in Science Beth.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
Crabtree, Rohrbaugh & Associates, Architects Montoursville Area School District High School Project Update February 10, 2015.
Houston Independent School District Robert L. Frost Elementary School PROJECT PROFILE PROJECT DESCRIPTION Frost Elementary is a new replacement school.
COLLEGE OF SAN MATEO BUILDING 36 – SCIENCE / PLANETARIUM Design Build and Sustainability Sustainability Conference: Butte Community College August 3 rd.
Green Building Demonstration Project Adam Saling City of San Diego.
Bryant School District Bethel Middle School
Presentation to HOK. 2rw.com NET ZERO ENERGY. SITE < or = renewable energy generated Building produces as much energy as it uses over the course of a.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
NORTHERN NEW MEXICO COLLEGE SERPA Solar Energy Research Park and Academy Summary: Approx 9,800sf classroom and laboratory building All new construction,
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Big Ten Sustainability Conference November 15-16, 2010 Energy Design & LEED Standards.
VIRGINIA TECH COLLEGE OF ARCHITECTURE & URBAN STUDIES Sponsored by: U.S. Environmental Protection Agency U. S. Department of Energy Center for High Performance.
Sustainable Building and Housing
Retrocommissioning Program UBS 677 Washington Blvd, Stamford, CT.
Kim Hockley 1 TOTAL SA – ENERGY EFFICIENT STATION TOTAL 14 TH AVENUE.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
UCSD Student Center: The Center of a Green Campus ENVS 664 Ta-You Huang Oct 16 th, 2012.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Energy Independence Outcomes Increase to 2,300 Tons of Heating and 2,000 Tons of Cooling Thru Geo-Exchange Create Jobs to Stimulate Economic Activity.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Energy Conservation Building Upgrades Alma School District.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Status of CalCAP Implementation Judy Chess, UC Berkeley UC/CSU/CCC Sustainability Conference July 2008 August 1, 2008.
GEOTHERMAL ALTERNATIVES, OPTIONS & SOLUTIONS Engineers. Consultants. Commissioning. MEP ASSOCIATES, LLC Presenter: Jeff Urlaub, PE Mike Luster, PE, LEED.
Greening Your Company in 2014: Opportunities to Improve Cash Flow and Maximize Environmental Benefits June 18, 2014.
GEOTHERMAL ALTERNATIVES, OPTIONS & SOLUTIONS Engineers. Consultants. Commissioning. MEP ASSOCIATES, LLC Presenter: Jeff Urlaub, PE.
Community Meeting, July 18, 2016 Update Designs and Phasing
Objectives of a Green Building
Fun Facts: James M. Bennett High School
Grunenwald Science and Technology Building
The Benefit of Including Energy Recovery System Analysis
INNOVATION lab MEP MECHANICAL/ELECTRICAL/PLUMBING :
Presentation transcript:

Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math

Saavedra Gehlhausen Architects Project Features ACADEMIC 5 Life Science Labs / 1 Stealth Lab (4 Current Labs) Prep/Storage 1 Cadaver Lab 1 Greenhouse Prep/Storage 1 Instrument Room 2 Student Resource Labs Classrooms 10 Large (includes 2 Stealth Labs) 5 Small 1 Math Lab (2 Rooms) Student Life Space 59 Faculty Offices Adjunct Office Space for 16 Faculty Support Office (FSO) Space Departmental Office Space IT Office BUILDING AND CONSTRUCTION Pursuing LEED Gold Certification 23 Alternate Bids All Faculty Requests have been Included 420-Ton closed-loop Geothermal System Chilled Beam Cooling System Connecting Link between CL-I and JCSM 105 New Parking Spaces Pendulum Creek Enhancements Photovoltaic System Greenhouse Green Roofs

Pursuing LEED Gold – 60 Points Required Currently at 68 Leadership in Energy & Environmental Design Energy Savings Measures 420 ton closed-loop geothermal heating and cooling system Chilled beam cooling system Variable air volume air handling units Energy recovery on air handling units Variable volume heating and cooling pumps High efficiency domestic water heating system Variable frequency drives for motors Building-integrated photovoltaics Transformers bearing Energy Star labels High efficiency light fixtures Lighting controls  Occupancy sensors  Daylight harvesting sensors  Multiple switching zones  Use of low mercury lamps Thermally efficient glazing (low-E coatings, ceramic fritting) Reflective white roofing membrane Enhanced commissioning Upon completion, Rock Valley College will likely be the first community college in Illinois to have two LEED Gold projects on its campus.

Saavedra Gehlhausen Architects Closed-Loop Geothermal System The closed-loop Geothermal system include (8) water-cooled heat pump units, primarily loop water pumps, a 164 vertical well geothermal bore field, and associated piping. This system will work to create jobs, reduce energy consumption and greenhouse gas emissions, and leverage grant funding in a learning environment that can promote these initiatives to future generations. ADVANTAGES More efficient than the existing central heating and chiller water plant Places the project in a better position to obtain LEED Gold Certification than more traditional systems Excess capacity will be shared with CL-I building Supports the College’s long standing “green” philosophy Can be used as a teaching tool for sustainable design SYSTEM ECONOMICS Geothermal System Cost $1,783,000 Less Conventional System Cost($ 695,000) DCEO Grant (Pending)($ 420,000) ICECF Grant (Pending)($ 90,000) Remaining Project Cost $ 578,000 Modeled Annual Energy Cost Savings Compared to Traditional System:$76,000 Simple Payback (Including Grants)7.6 years

Saavedra Gehlhausen Architects

Saavedra Gehlhausen Architects

Saavedra Gehlhausen Architects Exterior Elevations South Elevation North Elevation

Saavedra Gehlhausen Architects Exterior Elevations East Elevation West Elevation

Saavedra Gehlhausen Architects

Saavedra Gehlhausen Architects

Saavedra Gehlhausen Architects