Strongsville City School District Facilities Utilization Advisory Committee OSFC Presentation November 3, 2009.

Slides:



Advertisements
Similar presentations
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
Advertisements

Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Hingham Public Schools Preliminary Budget Information FY 2016 Service and Facilities January 12, 2015.
CMSD Master Planning. KEY POINTS  No schools to close for several years  All funding is tied to enrollment counts  The Master Plan will be reviewed.
Dalton Local Schools “Our Opportunity” June 5, 2008.
Lay Facilities Committee Finance Subcommittee Update January 9, 2013.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Fremont City Schools - Visioning Fremont City Schools August 21, 2008.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
SB 540 Task Force Briefing Establishing a Statewide Facility Database & Regional Comparative Analysis Software at the Dept of Education January 21, 2013.
“ Let’s Bond Together ” Issue 3 Expect….Believe….Achieve.
MONTGOMERY HIGH SCHOOL MODERNIZATION & NEW CONSTRUCTION
Planning for Schools in Your Community Lisa A. Laney, Planning Manager Steve Roka, Planning Manager.
Raising the Bar for DCPS School Facilities Best Practice in PK-12 Educational Facility and Capital Planning.
Defiance City School District Master Plan Presentation April 14, 2010 Presented by: Ohio School Facilities Commission Regency Construction Services, Inc.
Discussion and Possible action on the historic designation by the City of Laredo Landmark Board on certain LISD Schools.
College Station ISD Planning for Growth December 12, 2006.
Public Hearing on Proposed Closure of Allegheny 1 Elementary School Wednesday, February 15, 2012 Hollidaysburg Area Senior High School Auditorium 7 p.m.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Strongsville City Schools Recommendations on Building Utilization.
The OHIO SCHOOL FACILITIES COMMISSIONAssessor & RPC Summit; July 1, 2008.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
Recommended Actions for Statements of Interest Prioritized by School Districts Board of Directors Meeting November 28, 2007 Treasurer Tim Cahill, Chair.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
Designing and Programming Schools As Community Learning Centers Firestone/Litchfield Community Learning Center Community Update September 27, 2011 Community.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Charter School Facilities Funding 2010 Florida Charter School Conference November 9, 2010 William E. Fontaine Office of Educational Facilities.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Sandusky City Schools’ Transformation Sub-Committee “The Future of School Facilities” Briefing Document for Community Forum.
OHM-ADVISORS.COM Buckeye Valley Local Schools Elementary Schools Master Plan Update July 21, 2014 ARCHITECTS. ENGINEERS. PLANNERS.
Maintenance & Operations Replacement Levy and School Improvements Bond Election Day: February 9, 2016.
New Market Skills Center Draft 10 Year Major Projects Capital Plan Administrative Council December 2, /02/20111.
Making Our Facilities Better Board of Directors Update – Wednesday, July 24, 2013.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education August 4, 2014 Stakeholder Engagement and Communications Services.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
Palisades Middle School: Fitness Center Board Presentation April 20, 2016.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Wahoo Public School District Facility Planning Update April 18, 2016.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
CHAPEL HILL PARKS & RECREATION Comprehensive Parks Plan Chapel Hill Greenways Master Plan.
Cuba-Rushford CSD Capital Project
Overview of MSBA Building Process and Project Timeline
OABCIG General Obligation Bond Referendum Presentation
Overview of MSBA Building Process and Project Timeline
February 13, 2017.
Capital Project Needs Assessment
Bond and Override Report
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
MIRACOSTA COMMUNITY COLLEGE DISTRICT
FIVE YEAR CAPITAL FACILITIES PLAN (Five Year Plan)
UNION GROVE ELEMENTARY REFERENDUM
OSPI Capital Budget School Facilities & Organization
PROPOSED FACILITIES REFERENDUM
Capital Outlay Workshop
Master Facilities Committee Evaluation and Identification
Measure – V Facilities Update April 8th, 2019
New Market Skills Center Draft 10 Year Major Projects Capital Plan
FIRELANDS Local School District
Community Practice Asset Management.
Dixon Middle School Project Update
Presentation transcript:

Strongsville City School District Facilities Utilization Advisory Committee OSFC Presentation November 3, 2009

Strongsville City School District Classroom Facilities Assistance Program (CFAP) Provides funding for a share of the entire facilities needs within a district Exceptional Needs Program (ENP) Application based building replacement program to address health & safety of students Ohio School Facilities Commission Programs: Expedited Local Partnership Program (ELPP) Allows school districts estimated to be over two years away from eligibility for state assistance (CFAP) to fund a portion of their facilities master plan through local monies prior to the time state funding becomes available through the CFAP; a district-wide assessment and master facilities plan is provided by the commission

Strongsville City School District Evaluate Curriculum and Educational Delivery Evaluate and Realign (if desired) Vertical Organization (i.e., grade groupings) Evaluate Current Population Centers for Building Locations Right Size District’s Capital Assets with Projected Student Population Develop Partnerships for Community Learning Centers Deliver Quality Education More Efficiently and Reduce Operating Costs What are the Opportunities in Developing a Comprehensive Master Facilities Plan?

Strongsville City School District November 2000 – ELPP application May 2001 – Facilities Assessment November 2002 – Withdrew from ELPP February 2008 – Reapplied for ELPP February 2009 – Facilities Reassessment April 2009 – District accepted ten-year Enrollment Projections Master Plan options developed based on February 2009 Assessment and April 2009 Enrollment Projections Where does Strongsville City Stand?

Strongsville City School District ODE 2010 Eligibility Ranking #560 * Based on FY10 ODE Eligibility Ranking List State Share 8% Local Share* 92% How is the District’s Local Share Determined?

Strongsville City School District Historical Equity Ranking

Strongsville City School District Enrollment Projection by Grade

Strongsville City School District Enrollment Projections:  5 year out planning for declining enrollment  10 year out planning for increasing enrollment 2/3rds Guideline:  Waiver Process Must demonstrate safe, educationally adequate operationally efficient Co-funding up to 100% replacement cost 1/3rd Guideline:  District discretion on scope  Code, health and safety scope must be included OSFC Policies / Guidelines / Planning Principles

Strongsville City School District 350 Rule (ORC (c)):  Minimum 350 students to be housed (renovate or new) Square Foot / Student Allocation:  Sliding Scale (based on grade grouping and population)  Oversized Space Calculation (renovated buildings)  Excess Space (renovated buildings) OSFC Policies / Guidelines / Planning Principles:

Student Population SF / StudentCost / SF 350 – $ – $ – $ and up 115$ site size recommendation = 10 acres + 1acre per 100 students *Region 8 Elementary School Middle School Student Population SF / StudentCost / SF 350 – $ – $ – $ and up 141 $ site size recommendation = 20 acres + 1acre per 100 students High School Student Population SF / StudentCost / SF 350 – $ – $ – 1, $ ,201 and up $ site size recommendation = 35 acres + 1acre per 100 students

Strongsville City School District 350 Rule (ORC (c)):  Minimum 350 students to be housed (renovate or new) Square Foot / Student Allocation:  Sliding Scale (based on grade grouping and population)  Oversized Space Calculation (renovated buildings)  Excess Space (renovated buildings) OSFC Policies / Guidelines / Planning Principles:

- 19,193 sf (oversized sf) 173,110 sf (total building less oversized sf) = (additional excess sf) 7,110 (total PALFI sf) 20,110 31,000 6,000 7,000 17,000 5,000 Corridors Gymnasium Natatorium Auditorium Media Center Actual SF 29,307 SF Per OSDM 14,000 3,500 Non-OSDM 1,693 Oversized SF 3,000 1,500 7,000 6,000 19,193 Excess SF (PALFI) 7,000 6,000 13,000 OSDM (total sf required) 166,000 sf (1,000 st. x 166 sf/st.) Existing High School 192,303 sf (total building sf) OSDM (total sf required) 166,000 sf (1,000 st. x 166 sf/st.) -

Strongsville City School District Locally Funded Initiatives (LFI):  Project Agreement LFI (PALFI)  Elective Leadership in Energy and Environmental Design (LEED):  Silver Certification w/emphasis on points in energy category Segmenting- CFAP:  Entire building project minimum (i.e., complete renovation, complete new building)  Minimum local share = 4% of district’s assessed valuation OSFC Policies / Guidelines / Planning Principles:

Strongsville City School District State of Ohio Summary of New Construction “ Opinion of Probable Costs” per square foot of floor area Region 8 (northeast) 2009 Design Manual Update OSFC Budgeting Guidelines:

Strongsville City School District Assessment Cost Guidelines A.Heating System The Assessment Consultant shall evaluate the HVAC system and determine the requirements for each building or building addition using the funding chart below. * Does not include regional cost factor HVAC System Replacement$25.00 sf* (* includes demo of existing system & reconfiguration of piping layout, new controls for air conditioning and duct work) Convert to Ducted System Replacement:$ 7.50 sf* (* includes costs for vert. & horz. Chases, cut openings, soffits, etc.) Heating System (Only):$ 8.50 sf (for boilers, pump & piping replacement, not AHU) Controls (Only):$ 2.50 sf

Strongsville City School District Assessment Summary

FACILITY ASSESSMENT Cost Set : 2009 Rating Dollar Assessment C A.Heating System1$0.00- B.Roofing3$494, C.Ventilation / Air Conditioning3$674, D.Electrical Systems3$792, E.Plumbing and Fixtures1$0.00- F.Windows3$2,339, G.Structure: Foundation2$ H.Structure: Walls and Chimneys2$25, I.Structure: Floors and Roofs1$0.00- J.General Finishes3$744, K.Interior Lighting3$173, L.Security Systems3$102, M.Emergency/Egress Lighting3$40, N.Fire Alarm3$61, O.Handicapped Access3$394, P.Site Condition2$387, Q.Sewage System1$0.00- R.Water Supply1$0.00- S.Exterior Doors3$24, T.Hazardous Material2$49, U.Life Safety3$94, V.Loose Furnishings3$163, W.Technology2$112, X. Construction Contingency / Non- Construction Cost -$1,631, Total$8,307, *HA=Handicapped Access *Rating =1Satisfactory =2Needs Repair =3Needs Replacement *Const P/S=Present/Scheduled Construction AdditionDateHANumber of FloorsCurrent SF Original Building 1962yes1 20,034 Classroom Addition 1968yes1 2,316 Clssrm, Art, Music,Kitch 1977yes1 12,381 Classrooms 1991yes1 6,234 Total 40,965 Current GradesK-6Acreage:10.23 Proposed GradesN/ATeaching Stations:25 Current Enrollment370Classrooms:23 Projected EnrollmentN/A District:Strongsville City SD County:CuyahogaArea:Northeastern Ohio (8) Name:Whitney Elem Contact:Ms. Tricia Culotta Address:13548 Whitney Rd Phone:440/ Strongsville,OH Date Prepared: By:Tony Schorr Bldg. IRN:41053 Date Revised: By:Tony Schorr C=Under Contract Renovation Cost Factor % Cost to Renovate (Cost Factor applied) $8,653, The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is requested from a Master Plan. CEFPI Appraisal Summary SectionPoints PossiblePoints EarnedPercentageRating Category Cover Sheet———— 1.0 The School Site %Satisfactory 2.0 Structural and Mechanical Features %Borderline 3.0 Plant Maintainability %Borderline 4.0 Building Safety and Security %Borderline 5.0 Educational Adequacy %Borderline 6.0 Environment for Education %Borderline Commentary— —— Building Summary – Whitney Elem (41053 (1) Building data, assessor data and assessment dates. (2) Includes building inventory details about all the buildings that were assessed. (3) Listing of each of the 23 building systems, rating and cost data. Each item is linked to a detailed description of the assessor’s findings and recommendations. (4) Council of Educational Facility Planners International (CEFPI) -- Appraisal is an instrument that yields data about the ability of the building to support the educational program. Each item is linked to a detailed description of the assessor’s findings. Cost to renovate “regional cost factor” applied. BUILDING and ASSESSOR DATA District:Strongsville City SD County:Cuyahoga Area: Northeastern Ohio (8) Name:Whitney Elem Contact:Ms. Tricia Culotta Address:13548 Whitney Rd Strongsville, OH Phone:440/ Date Prepared: By:Tony Schorr Bldg. IRN:41053 Date Revised: By:Tony Schorr *HA= Handicapped Access *Rating =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S= Present/Scheduled Construction AdditionDateHANumber of FloorsCurrent SF Original Building1962yes1 20,034 Classroom Addition1968yes1 2,316 Clssrm, Art, Music,Kitch1977yes1 12,381 Classrooms1991yes1 6,234 Total 40,965 Current GradesK-6 Acreage: Proposed GradesN/A Teaching Stations:25 Current Enrollment370 Classrooms:23 Projected EnrollmentN/A FACILITY ASSESSMENT Cost Set : 2009 Rating Dollar Assessment C A. Heating System1$0.00- B. Roofing3$494, C. Ventilation / Air Conditioning3$674, D. Electrical Systems3$792, E. Plumbing and Fixtures1$0.00- F. Windows3$2,339, G. Structure: Foundation2$ H. Structure: Walls and Chimneys2$25, I. Structure: Floors and Roofs1$0.00- J. General Finishes3$744, K. Interior Lighting3$173, L. Security Systems3$102, M. Emergency/Egress Lighting3$40, N. Fire Alarm3$61, O. Handicapped Access3$394, P. Site Condition2$387, Q. Sewage System1$0.00- R. Water Supply1$0.00- S. Exterior Doors3$24, T. Hazardous Material2$49, U. Life Safety3$94, V. Loose Furnishings3$163, W. Technology2$112, X. Construction Contingency / Non-Construction Cost-$1,631, Total$8,307, CEFPI Appraisal Summary SectionPoints PossiblePoints EarnedPercentageRating Category Cover Sheet———— 1.0 The School Site %Satisfactory 2.0 Structural and Mechanical Features %Borderline 3.0 Plant Maintainability %Borderline 4.0 Building Safety and Security %Borderline 5.0 Educational Adequacy %Borderline 6.0 Environment for Education %Borderline Commentary— —— C=Under Contract Renovation Cost Factor104.16% Cost to Renovate (Cost Factor applied)$8,653, The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is requested from a Master Plan.

Strongsville City School District OSFC DOES NOT SHARE IN *: Purchase of Land Offsite Utility Costs Performing Arts Halls (Fixed seat auditoriums) Bus Garages District Administration Facilities Stadiums, Tracks, etc. Desktop Computers / Software *list not all inclusive

Strongsville City School District Whitney Elementary94% Allen Elementary77% Zellers Elementary77% Chapman Elementary66% Drake Elementary62% Surrarrer Elementary40% Muraski Elementary34% Kinsner Elementary 6% Center Jr. High65% Albion Middle57% Strongsville High 11% Renovations vs. Build New Ratio:

Strongsville City School District DRAFT Master Plans: The following Draft Master Plans are for discussion purposes only. These plans should be considered as a starting point as the Strongsville City School District partners with the OSFC to best meet the needs of the students and community.

Strongsville City School District Draft MP 1 Scope:Renovations/Addition to Chapman Elementary to house grades K-5 Renovations/Addition to Drake Elementary to house grades K-5 Renovations to Kinsner Elementary to house grades K-5 Renovations to Muraksi Elementary to house grades K-5 Renovations/Addition to Surrarrer Elementary to house grades K-5 Renovations to Albion Middle School to house grade 6 Renovations/Addition to Center Junior High to house grades 7-8 Renovations/Addition to Strongsville High to house grades 9-12 and CT Allowance to abate and demolish Allen Elementary, Whitney Elementary, and Zellers Elementary Schools Please note the PALFI detailed in master plan options is not inclusive of all Locally Funded Initiatives the district may choose to include in their project(s). Additional LFI scope should be discussed and budgets established with the assistance of the district’s design professional prior to finalizing bond language to secure the local share of the project funds. Master Plan utilizes District Accepted Enrollment Projections dated April 20, 2009 ( planning year). Approved Enrollment Projections will be required for final plan approval. EEA studies have not been completed on all existing buildings. Local Share percentage based on 2010 Equity Ranking. Total Master Plan Cost: State Share: Local Share: LFI: Total Local Share: $98,925,892 $7,914,071 $91,011,821 $0 $91,011,821 Co-Funded 8% Co-Fundable 92% Co-Fundable; FY 10 Equity Ranking PALFI – n/a this plan Co-Fundable Local Share + PALFI

Strongsville City School District Draft MP 2 Scope:Renovations/Addition to Chapman Elementary to house grades K-6 Renovations/Addition to Drake Elementary to house grades K-6 Renovations to Kinsner Elementary to house grades K-6 Renovations to Muraksi Elementary to house grades K-6 Renovations/Addition to Surrarrer Elementary to house grades K-6 Renovations/Addition to Albion Middle School to house grade 7-8 Renovations/Addition to Strongsville High to house grades 9-12 and CT Allowance to abate and demolish Allen Elementary, Whitney Elementary, Zellers Elementary, and Center Junior High Schools Please note the PALFI detailed in master plan options is not inclusive of all Locally Funded Initiatives the district may choose to include in their project(s). Additional LFI scope should be discussed and budgets established with the assistance of the district’s design professional prior to finalizing bond language to secure the local share of the project funds. Master Plan utilizes District Accepted Enrollment Projections dated April 20, 2009 ( planning year). Approved Enrollment Projections will be required for final plan approval. EEA studies will need to be completed on all existing buildings. Local Share percentage based on 2010 Equity Ranking. Total Master Plan Cost: State Share: Local Share: LFI: Total Local Share : $102,908,181 $8,232,654 $94,675,526 $0 $94,675,526 Co-Funded 8% Co-Fundable 92% Co-Fundable; FY 10 Equity Ranking PALFI – n/a this plan Co-Fundable Local Share + PALFI

Strongsville City School District OSFC Annual Inflation Costs:

Strongsville City School District Next Steps in OSFC Planning Process: Develop Final Master Plan  Validate Assessment Scope (adjust scope and budget if required)  Evaluate Enhanced Reprogramming (incorporate scope and budget if required)  Evaluate Swing Space Needs (incorporate scope and budget if required)  Discussions on Site Safety Access Allowance (incorporate into plan if required)

Strongsville City School District