1st NRC Meeting, 16-19 October 2006, Amsterdam 1 ICCS 2009 Field Operations.

Slides:



Advertisements
Similar presentations
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
Advertisements

Data Management Seminar, 8-11th July 2008, Hamburg Survey System – Overview & Changes from the Field Trial.
Translation and Verification of ICCS instruments Summary of the Field Trial & Plans for the Main Study National Research Coordinators Meeting Windsor,
Data Management Seminar, 9-12th July 2007, Hamburg 1 Data Processing at the IEA DPC.
STAAR Alternate 2 Preparing for the STAAR Alternate 2 Assessment 2015.
Arizona Department of Education Alternate Assessment Unit Audra Ahumada, Director of Alternate Assessment AIMS A SCIENCE TRAINING SESSION 2.
JANUARY 2014 REGENTS DAY SCORING Requirements, Eligibility, & Selection Version 3.0 – December 2013 Office of Assessment | Presentation:
Survey Design Steps in Conducting a survey.  There are two basic steps for conducting a survey  Design and Planning  Data Collection.
Introduction to the Child & Adolescent Needs and Strengths Assessment (CANS) Our Community. Our Kids. Dr. Gary Buff, Ed.D. President and COO.
RECRUIT Overview November 29, 2005 Academic Personnel Systems 1 Academic Personnel Systems: RECRUIT Please silence cell-phones.
Calendar Highlights – STAAR Alternate 2 testing window has been expanded. – Administration date for STAAR grades 5 and 8 mathematics has shifted. – Report.
Electronic EDI e-EDI. The EDI has been in use since 1999 using a paper-based system and computerized spreadsheets to collect and manage EDI data. Over.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S - Translation of Forms and Labels (PDF)
Introductions Name Job title Carolyn Presland Regulations Manager
National Adaptation Forms International Study Centre Data Management Seminar Hamburg, July 2008.
1st NRC Meeting, October 2006, Amsterdam 1 Sampling: Next Steps.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
FSA Writing Component Spring 2015.
Data Management Seminar, 8-11th July 2008, Hamburg 1 Summary Common Sources of Error.
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – On-line Data Collection A General Introduction.
ICCS status report Wolfram Schulz International Study Centre Data Management Seminar Hamburg, July 2007.
Welcome to PARCC Field Test Training! Presented by the PARCC Field Test Team.
ACCESS for ELLs ® 101 Title III Conference October 7, 2010.
Overview of ICCS field trial National Research Coordinators Meeting Windsor, June 2008.
Direct Math Assessment State Department Training September, 2008 Cindy Johnstone Mathematics Coordinator.
Quality Control Program in ICCS Plans for the Main Study National Research Coordinators Meeting Windsor, June 2008.
1 ADP Algebra II End-Of-Course Online Field Test Test Administrator Training September, 2007.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Tool Pack: Readiness for Price Collection, and Upgrades Vilas Mandlekar Nada Hamadeh World Bank ICP Regional Coordinators’ Meeting September 28, 2004.
Quality Standards in TIMSS and PIRLS The Basis for Valid and Reliable Data for Educational Decision Making Ina V.S. Mullis, Michael O. Martin, & Pierre.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 Data Management Procedures Michael Jung, IEA Data Processing and Research Center.
National adaptations to main survey instruments and layout verification National Research Coordinators Meeting Windsor, June 2008.
Quality Assurance Program National Research Coordinators Meeting Amsterdam, October 2006.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
Data Management Seminar, 9-12th July 2007, Hamburg Data Entry Overview.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Bilingual Coordinators’ Network Meeting September 25, 2008.
© 2014, Florida Department of Education. All Rights Reserved. Bureau of Federal Educational Programs Updates _________________________________.
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
1st NRC Meeting, October 2006, Amsterdam 1 Data Management Procedures Preview of software used in ICCS Michael Jung, IEA Data Processing Center.
Data Management Seminar, 9-12th July 2007, Hamburg 1 WinW3S – Listing & Sampling Teachers.
ICCS Main Survey Overview National Research Coordinators Meeting Madrid, February 2010.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 ICCS 2009 Main Survey Field Trial Results.
Data Management Seminar, 9-12th July 2007, Hamburg Entering Data Part 2.
Data Management Seminar, 9-12th July 2007, Hamburg WinDEM – Entering Data Part 1.
Data Management Seminar, 9-12th July 2007, Hamburg 1 ICCS 2009 – Field Trial Data Management Seminar Summary Day 3.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Data Management Seminar, 9-12th July 2007, Hamburg WinW3S - Introduction.
Study Overview National Research Coordinators Meeting Amsterdam, October
Session 1 Achievement Testing Pre-Test Training
Data Management Seminar, 9-12th July 2007, Hamburg WinW3S – Listing & Sampling Classes.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S – Listing & Sampling Teachers.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S - Introduction.
Data Management Seminar, 8-11th July 2008, Hamburg WinW3S – Listing Students and Assigning Booklets.
Data Management Seminar, 9-12th July 2007, Hamburg Within-School Sampling – A General Introduction.
Preparing for and Administering the STAR CBT Tryout For STAR Coordinators and Test Administrators September 14, STAR CBT Tryout Webcast September.
Teacher Survey Design National Research Coordinators Meeting Amsterdam, October 2006.
Data Management Seminar, 8-11th July 2008, Hamburg WinDEM- Verification Checks Part I.
HEALTHY YOUTH SURVEY 2016 SURVEY COORDINATOR TRAINING.
Data Management Seminar, 9-12th July 2007, Hamburg WinW3S – Listing Students and Assigning Booklets.
STAAR Assessment Management System and StAAR Online Testing Platform
Data Management Seminar, 9-12th July 2007, Hamburg Survey System – Overview.
2016 TELPAS Online Testing. TELPAS Assessment Management System Accessed at
ESOL END-OF-YEAR PROCEDURES & REQUIREMENTS Hall County School District April 2015 Dr. Cindy Tu, ESOL Coordinator.
2012 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
2016 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
Global Youth Tobacco Survey (GYTS): Survey Implementation
Global Youth Tobacco Survey (GYTS): Proposal Development
Online Testing System Assessment Viewing Application (AVA)
Online Testing System Assessment Viewing Application (AVA)
Presentation transcript:

1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations

1st NRC Meeting, October 2006, Amsterdam 2 Field Operations Overview National Context Questionnaire Item Pilot Field Trial Operations Overview Online Data Collection Support Materials Field Trial Timeline Next Steps Contact Information

1st NRC Meeting, October 2006, Amsterdam 3 National Context Questionnaire Language will be English only NRCs will have to gather information from several sources Data for National Context Survey will be collected online NRCs can login as often as required Questionnaire will be online end of 2006/beginning of 2007 –NRCs will receive with individual access information

1st NRC Meeting, October 2006, Amsterdam 4 Item Pilot Submit Items to ACER via at Review Items and commenting on study website End of reviewing process mid January 2007

1st NRC Meeting, October 2006, Amsterdam 5 Field Trial Operations Overview

1st NRC Meeting, October 2006, Amsterdam 6 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 7 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 8 Adapt Questionnaires & Document Adaptations Translation Verification Layout Verification Translate Questionnaires & Verifiy within Country Correct & Assemble Questionnaires Correct Questionnaires (if necessary) Print Send Out

1st NRC Meeting, October 2006, Amsterdam 9 NRCIEA Sec./ISC/DPCtime Time planning before administration Layout Verification Implement changes & assemble Instruments Translation Verification Translate Instruments 2 weeks 4 weeks 3 weeks 2 weeks 4 weeks Start data collection15 weeks Instruments Send Out Printing

1st NRC Meeting, October 2006, Amsterdam 10 due dateNRC/ISC/IEAtime Time planning before administration Layout Verification Implement Changes & Assemble Instruments Translation Verification Translate Instruments 4 weeks 3 weeks 2 weeks 4 weeks Instruments Send Out 2. July July August September October October 2007 Start data collection Print Instruments 2 weeks 15. October 2007

1st NRC Meeting, October 2006, Amsterdam 11 Meanwhile…

1st NRC Meeting, October 2006, Amsterdam 12 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 13 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 14 Contact Schools and get within School Information Perform Within-School Sampling Prepare List of Schools and send it to DPC Recruit and Train Test Administrators DPC provides list of sampled Schools Recruit and Train Scorers Translate School Coordinator Manual Translate Test Administrator Manual

1st NRC Meeting, October 2006, Amsterdam 15 School Contact Send sampling frame (list of schools) to DPC Sampling of schools will be done by DPC preferably List of sampled schools will be provided by DPC Contact schools, ensure participation Identify liaison person (School Coordinator) Provide School Coordinator Manual Record status for each sampled school in WinW3S Adaptation and translation of School Coordinator and Test Administrator Manual (no verification on international level, modifications to some extend possible)

1st NRC Meeting, October 2006, Amsterdam 16 Within-School Sampling (Students) Two levels: students and teachers Identification of classes on Class Listing Forms –Class name –Number of students Random within-school sample of classes Identification of students within sampled classes on Student Listing Forms Send list of sampled students to School Coordinator on Student Tracking Form WinW3S serves as survey administration tool

1st NRC Meeting, October 2006, Amsterdam 17 Within-School Sampling (Teachers) Identification of eligible teachers on Teacher Listing Forms Within-school random sample of teachers Send Teacher Tracking Form to School Coordinator

1st NRC Meeting, October 2006, Amsterdam 18 Within-School Sampling WinW3S will support NRCs with –Listing of classes / teachers / students –Sampling of classes / teachers –Assignment of forms –Survey administration –Tracking of participation  Will be subject to Data Management Seminar

1st NRC Meeting, October 2006, Amsterdam 19 Assigning Questionnaires School Questionnaire Teacher –Every Teacher will receive one questionnaire Student –Booklet –Questionnaire (perception and background part in one form) –Regional Modules instrument(s)  WinW3S will assign forms and provide labels for questionnaires

1st NRC Meeting, October 2006, Amsterdam 20 NRCSchool Time Planning before Administration time Contact Schools Decision to participate Send Listing Forms List Students/Teachers Sample Teachers Send Tracking Forms Send Questionnaires Start data collection Name School Coordinator Sample Classes List Classes

1st NRC Meeting, October 2006, Amsterdam 21 School ContactInstrumentstime Time Planning before Administration Contact Schools Send Listing Forms Sample Teachers Send Tracking Forms Send Questionnaires Implement changes & assemble Quest. Translate Instruments Printing Data collection Sample Classes

1st NRC Meeting, October 2006, Amsterdam 22 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 23 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 24 Adapt Codebooks To National Questionnaires Document Adaptations in National Adaptaion Forms

1st NRC Meeting, October 2006, Amsterdam 25 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 26 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 27 Monitor Test Administrators Ad hoc Support Arrange for Material Receipt Train Scorers Train Data Entry Staff

1st NRC Meeting, October 2006, Amsterdam 28 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 29 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 30 Organize Material for (direct) Data Entry Organize Material for Scoring and Reliability Scoring Check if Information and Material is complete Get back to School if necessary Enter Participation Information

1st NRC Meeting, October 2006, Amsterdam 31 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 32 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 33 Conduct and Monitor Scoring Conduct and Monitor Reliability Scoring Organize Material for Data Entry

1st NRC Meeting, October 2006, Amsterdam 34 Scoring All open ended items have to be scored according to scoring guide Reliability scoring for open ended items for a certain amount of booklets  Subject to Scoring Training Seminar in 2007

1st NRC Meeting, October 2006, Amsterdam 35 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 36 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 37 Complete Participation Information Verify Data Enter Data

1st NRC Meeting, October 2006, Amsterdam 38 Data Entry Data entry software (WinDEM) and international codebooks for the FT are provided by the DPC in time National staff should be trained on data entry, even if all or parts are being outsourced Computer workstations need to be set up National Centers enter and verify data from paper questionnaires Adapt codebooks to reflect national conditions (e.g. ISCED levels)

1st NRC Meeting, October 2006, Amsterdam 39 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 40 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 41 Set of Final Instruments National Codebooks and Documentation (NAF) Verified Data sets Tracking Forms Reliability Coding Data

1st NRC Meeting, October 2006, Amsterdam 42 Instrument Preparation Sampling and Preparing Survey Administration Data Entry and Verification SURVEYSURVEY Codebook Adaptation Receiving Material Data Sendout Scoring

1st NRC Meeting, October 2006, Amsterdam 43 Online Data Collection

1st NRC Meeting, October 2006, Amsterdam 44 Online Data Collection (ODC) Used for all questionnaires that National Centers should answer –National Context Questionnaire –Survey Activities Questionnaire International Option for –School Questionnaire –Teacher Questionnaire Countries that decide to use ODC in Main Study are obliged to conduct Field Trial in a split half design Ensure fall-back to paper questionnaire True mixed mode design Goal: reduce response burden –Ask schools for preferred mode (in Main Study) –Mode assignment for all questionnaires of one type possible

1st NRC Meeting, October 2006, Amsterdam 45 Codebook Adaptation Instrument Preparation Sampling and Preparing Administration Data Entry and Verification Administration Receiving Material Data Sendout Codebook Adaptation Prepare ODC Monitor ODC

1st NRC Meeting, October 2006, Amsterdam 46 School contactInstrumentstime Time planning before administration Contact Schools Sample Students / Teachers Send Tracking Forms Send Questionnaires Implement changes & assemble Quest. Translate Instruments Printing Data collection Printing Prepare ODC Send Quest./Cover Letters Send Listing Forms Sample Classes

1st NRC Meeting, October 2006, Amsterdam 47 Online Data Collection (ODC) - Facts Based on concept of cultures All languages supported (character sets, text directions,…) Participants receive “cover letter” –Label with login information provided by WinW3S –Culture specific URL –Personal username and password –Sent to school coordinator for distribution Participants can log in and out as often as desired Same administration period as paper questionnaires

1st NRC Meeting, October 2006, Amsterdam 48 Support Material

1st NRC Meeting, October 2006, Amsterdam 49 Support Material Survey Operations Manual (FT) –Part 1: Survey Operations Overview, Dates and Activities –Part 2: Survey Administration School Coordinator Manual Test Administrator Manual Within School Sampling Software (WinW3S) + Manual IEA SurveySystem Designer + Manual National Quality Control Monitor Manual –Part 3: Data Entry Scoring Guide Codebooks Windows Data Entry Manager (WinDEM) + Manual  Distribution of all materials and software packages through study website only

1st NRC Meeting, October 2006, Amsterdam 50 FT Timeline

1st NRC Meeting, October 2006, Amsterdam 51 Field Trial Timeline Receive instruments & NAF by 2 July 2007 Submit translated questionnaires with NAF v1 for international translation verification by 30 July 2007 Receive verified instruments by 27 August 2007 Submit for layout verification by 17 September 2007 Start printing and distribution of questionnaires by 1 October 2007 Proposed FT administration period (subject to country conditions): 15 October – 16 November 2007 Submit data to DPC by end of 2007

1st NRC Meeting, October 2006, Amsterdam 52 Next Steps

1st NRC Meeting, October 2006, Amsterdam 53 Next Steps Send items to ISC via to: Review and comment on items at until Mid January 2007 Complete National Context Questionnaire beginning of 2007 Set up team at national center and plan for –Staff –Translation –School Contact –Test Administrators –Scorers –Data Management (Data Entry and Verification) NRC meeting in June 2007 Data Management Seminar in July 2007 Be prepared to receive Field Trial instruments in July 2007

1st NRC Meeting, October 2006, Amsterdam 54 Contact Information

1st NRC Meeting, October 2006, Amsterdam 55 Contact Information Field Operations / Data Management: IEA Data Processing Center Falk Brese Michael Jung

1st NRC Meeting, October 2006, Amsterdam 56 Thanks for your attention!