1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm.

Slides:



Advertisements
Similar presentations
Standard 29 CFR Part Respiratory Protection.
Advertisements

STRATEGY ON THE MANAGEMENT OF THE BIOMEDICAL WASTE Health Care Waste Management (HCWM) Regional Approach Ohrid, Ana Petrovska.
Barhale Procedure for Site Establishment
Radioisotope Laboratory Techniques Day 2 Environmental Health & Safety Radiation Control & Radiological Services UNIVERSITY OF FLORIDA RADIATION SAFETY.
Valley City State University | Facilities Services
Work Health and Safety Section 6 ICA11v1.0
Airflow and BSC Biosafety and Biosecurity Awareness Training
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
1 Joint Commission for Environmental Cooperation and U.S./Mexico Border 2012 Collection and Storage of SLABs December 4, 2007.
RWE NUKEM The Design, Construction and Operation of NORM Descaling Plants E Taylor and L Fellingham.
SETUP Chapter 6 Lead Abatement for Workers Course.
IAEA International Atomic Energy Agency IAEA Seibersdorf Pu-240 incident, clean-up and lessons learnt John Hunt, Rudolf Hochmann, Hugo Eisenwagner, Tobias.
A Bad Atmosphere Can be deadly Requires a respirator.
Introduction to Hydraulics ClassAct SRS enabled. In this presentation you will: identify the fundamental parts of a hydraulic system and safety issues.
Intervention for Chronic and Emergency Exposure Situations Basic Concepts of Emergency Preparedness Personal Protective Equipment, Devices and Procedures.
AL FURAT PETROLEUM CO. NORM MANAGEMENT SYSTEM
Pesticide Spills Prevent…Prepare…React. Consequences of Spills Loss of time and money Loss of time and money –Man hours spent on spill clean up –Disposal.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Bloodborne Pathogens Occupational Safety and Health Course for Healthcare Professionals.
Student Safety Orientation. Origin of Safety Rules School Rules Classroom/Laboratory Rules Lab Safety Rule Agreement National Science Education Standards.
Why HSE in an Organization
Tulane University - Office of Environmental Health & Safety (OEHS) Personal Protective Equipment For Tulane Employees Who Have the Potential to Use PPE.
Personal Protective Equipment
R espiratory Protection In Compliance With: 29 CFR Cummins Southern Plains, Ltd.
WORKER SAFETY Radionuclides Web Cast August 4, 2004 Loren W. Setlow Office of Radiation and Indoor Air
Environmental Toolbox. 2 General Awareness Training Module For Soldiers, Sailors, Airmen, Marines, and everyone in a base camp.
Health, Safety, and First Aid. Safety Procedures  Accidents are most often caused by: Lack of knowledge or skill Environmental hazards Poor safety attitudes.
TRP Chapter Chapter 5.3 Safe operations and safety management.
Version One Naturally Occurring Radioactive Material Awareness Training Course.
Traditional Forms Of Energy (Natural Gas, Oil, Coal) By: Jennifer Garcia Sanchez 808.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
LEAD SAFETY PROGRAM. REFERENCES 29 CFR CFR MCO F CHAPTER 17 BASE INSTRUCTION Lead Abatement 29 CFR MCO F HUD.
Safe Work Practices Instructional Goal: the participant will be more aware of the need for proper training on safe work practices at a waste site and.
21 –23 Feb 2005NORM Workshop 2005 Controlling Exposures Brett Young.
HAZWOPER Management and Supervisor. Personnel responsible for safety/health v Personnel and alternates responsible for safety and health v May vary according.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
LESSON THIRTEEN LUBRICATING OIL SYSTEM. 1.PRIMARY PURPOSE OF LUBRICATION To keep a clean layer of lubricating oil film / luboil film between the contacting.
Instructor:Mr. Wayne Wood McGill University Environmental Safety Office Chancellor Day Hall, room 615 Telephone:
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Respiratory Protection
Mine Health & Safety Inspectorate Northren Cape Region – May 2014 MH Sease - IOM.
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
1 Emergency and Disaster Response to Chemical Releases Decontamination Module 8.
DRAFT REGULATIONS ON END-OF-LIFE VEHICLES Public Consultation Waste Management Unit Malta Environment & Planning Authority (MEPA) End-of-Life Vehicles.
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
Good Hygiene Practices Michel Vangeel November 2008 Revised November Information provided subject to the 'Conditions for Sharing Materials and Advice'
NORM.
USP 800 Implementation in a Community Oncology Practice
Automotive Engines Theory and Servicing
洗手及 负压技术 余 波
Beryllium Handling in the High Temperature Materials Laboratory and Hot Cells.
SANITATION & HYGIENE KHADIJAH ADE-ABOLADE MPH. FPCPharm.
Working with Beryllium in JSC “Kompozit”
Green Cleaning to Meet LEED (Leadership in Energy and Environmental Design) Existing (Green) Building Operations and Maintenance Requirements.
Respiratory Protection Training
Aseptic Technique Definitions.
Environmental and Safety Concerns with SF6 Gas
Electrical Gas Plumbing Heating & Cooling
Chemical Protection.
AFPC Policy Protect its personnel, contractors,3rd parties and the environment against the hazards of exposure to ionizing radiation due to AFPC activities.
Instructions for Wipe Testing for Radioactive Material Contamination
Acrylonitrile.
The Improvement of ALARA for the Steam Generator Maintenance
Decontamination Procedures
Disaster Site Worker Safety
Disaster Site Worker Safety
Disaster Site Worker Safety
Automotive Engines Theory and Servicing
Presentation transcript:

1 AFPC Norm Decontamination Facility Plant (NDF) 1.Introduction - The passage of produced water through pipe work and plants leads to the built up of Norm scale on the inner surfaces, which can present an built up of Norm scale on the inner surfaces, which can present an external radiation Hazard during normal operation and an Internal and external radiation Hazard during normal operation and an Internal and external hazard during maintenance work. external hazard during maintenance work. - AFPC have made a policy decision to manage the NORM wastes in accordance with best international practice. accordance with best international practice. - AFPC constructed a Norm Decontamination plant by the AEA Technology. Technology.

2 - The AFPC NDF plant is used to remove NORM contaminated scales from Production equipments in order to be prepared for re-use or from Production equipments in order to be prepared for re-use or safe disposal. safe disposal. - The plant is run continuously for 10 HRs per day and 365 days per year (except the break down maintenance & De- sludging shutdowns) (except the break down maintenance & De- sludging shutdowns) - Sump pumps to transfer process water from the jetting bays / lancing machine into settling tanks that designed to allow fine NORM machine into settling tanks that designed to allow fine NORM particulate to fall out of suspension in the process water stream. particulate to fall out of suspension in the process water stream. - The AFPC NDF plant achieves decontamination level down to 0.37 Bq/Cm² for Alpha radiation and 3.7 Bq/Cm² for Beta radiation. Bq/Cm² for Alpha radiation and 3.7 Bq/Cm² for Beta radiation.

3 2. NDF Main Parts: 1- A general area with: a) Operators Change room with showers: with barriers and monitoring equipments a) Operators Change room with showers: with barriers and monitoring equipments b) Visitors Change room with showers b) Visitors Change room with showers c) A hooded Gas Cutting area: breathing air supply is required for Operators c) A hooded Gas Cutting area: breathing air supply is required for Operators d) An active Laundry: with ventilation and waste feed direct to a disposal tank d) An active Laundry: with ventilation and waste feed direct to a disposal tank e) A water Jetting area for Decontamination e) A water Jetting area for Decontamination

4 2- A Pump House with High Pressure Pumps for Equipments Decontamination: * Process water is extracted from settling tanks and conveyed to the water filter units, where cartridges will remove particulate down to 10 micron. a) High pressure pump for tubular decontamination b) Low pressure pumps for sump and water re-circulation 3- Active air samplers to monitor airborne activity and ventilation system

5 Extract Ventilation System HEPA filters 4- A tubular Decontamination plant for tubes Decontamination: bar operational pressure - It is hydraulically operated and controlled de- scaling machine water chiller: is to cool the process water temperature which has gained heat after passing through high pressure pumps and lances.

6 5- A lay down area for equipments dismantling to be decontaminated 6- A Lay down area for decontaminated equipments 7- A temporary waste store building for main and secondary waste temporary storage. 8- Health Physics Laboratory

7 Guard House AFPC NDF Plant Layout Main Gate Tubular lance 1K.bar Press Tubular C.Room Jetting Bays 2.K. bar. pressure Burning Bay W.Shop Offices Mess Room Controlled Area Tube Racks Contaminated Equipments Visitors Change Rooms Laundry Contaminated Scale Drum Store W.C Primary Settling Tanks HPS Office Dismantling Bay Clean Area Secondary Settling Tanks Pump House Hepa Filter Room Store Op.Cha. Room Air Luck Delay Tanks H. VAC S.Ch.R W. Chiller A. Chiller Sun Shade - Gate Barrier NDF Layout

8 The NDF External Layout Air Luck Drum Store Clean Area Main Gate Guard Offices, Mess Room, W.C. Spares Stores Controlled Area At The back

9 Burning Bay

10 High Pressure Jetting Bay

11 Tube Plant Machine

12 Jetting & Burning Curtain

13 Waste Bags

14 Filters Bank

15 Controlled Area Contaminated Equipments Wrapping 1. Received items are wrapped in plastic bags. 2. Vehicle wheels must be checked by the plant HPS Prior to leave the Plant. Apply Decontamination if required.

16 H.P.S Office

17 3. Decontamination of equipment 1. Receipt of equipment from Owners with all the required info included in job work Request form (Owner name, indicator and telephone number, location, equipment explanation for reused OR scrap, numbers of equipments, Norm certificate checked by the location RPS, job priority based on equipments reuse or HSE condition) 2. NDF Plant manager and HPS Recheck the work request information and compare. 3. HPS Recheck the Norm contamination of the received equipments 4. Off loading At NDF controlled area 5. Check the vehicle body and wheels prior to leave the facility and Decontaminate if required

18 Clothing Minitor

19 Air Sampler

20 PPEs

21 6. Write NDF Local number 7. Organizing Job based on priority 8. Start Decontamination based on equipments type until back ground 9. NDF contact the person who raised the WO when achieve the Decontamination. 10. Transport the Decontaminated equipments to the Central work shop for maintenance OR contact the Owner to take the equipments back as required. 10. Issue Clearance Certificate OR Radiological Survey Report as required

22

23 Clean Equipments Area

24 4. Important Issues Of AFPC NDF Plant: 1) Modern, closed recycled process water system, Air extracts system (safer) 2) Tight environmental controls 3) All NDF workers are Norm aware and radio logically classified 4) All the plant workers carry out annual Radiological and Medical examination at AESC Establishment. 5) Personal Film Badges are inspected each two months by AESC 6) All unsafe act/condition and incidents shall be reported 7) The plant building is air conditioned to give a maximum working temperature of 25 C° 8) Work schedule is 12 hrs day shift, Actually 9 HRs work (From 06:00 to 08:30, from 09:30 to 12:00, from 13:00 to 15:00 and from 16:00 to 18:00 HRs)

25 9) HPS Checks vehicle body and wheels prior to leave the plant. Apply Decontamination if required 10) All employees wear the appropriate PPEs as required (Where Respiratory Protective Equipment (RPE) is provided for use in particular Circumstances) 11) First Aid is provided at all times 12) All employees shall be made aware of Permanent Instruction, which is to be followed in the event of an incident requiring First Aid or Ambulance. 13) The Norm contaminated scale & Sludge are removed from the tanks, and containerized in plastic drums and stored in the waste drum store through a sequentially De-sludging shutdown of the plant.