ASPIRATING SYSTEMS TRAINING

Slides:



Advertisements
Similar presentations
AIR DISTRIBUTION (Additional information. Also see Chapter 18) General The proper delivery of air for heating, cooling, or ventilation is a crucial part.
Advertisements

SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
Open-Path Gas Detection - Philosophy of Use or The Story of Clouds.
Aspirated Smoke Detection
Fan Coil Unit Product Line-up. FCU Home Application Show.
Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
HEAT PUMPS.
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Welcome Bienvenue Willkommen Bienvenido Добро пожаловать ようこそ 歡迎.
Components of HVAC System
737 PNEUMATICS MENU PRINCIPAL.
Business Protection Earliest warning: minutes before combustion
The Campaign for McMaster University Information Guide to Fume Hoods Facility Services (ext )
Engineer Presentation
INTRODUCTION IT’S ALL ABOUT YOUR PERSPECTIVE. WATER DAMAGE IS RESPONSIBLE FOR GREATER THAN 25% OF RESIDENTIAL INSURANCE CLAIMS ANNUALLY. IN THE U.S. THAT.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
Hydraulics.
GST FIRE ALARM SYSTEM INTERNATIONAL BUSINESS DEPARTMENT , GST BEIJING
1 ASPIRATING SYSTEMS TRAINING e-series. 2 Overview e-series model range ASD Software  NetTracer  Detector Monitor  PipeTracer.
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
Unit 6.2. Mechanical and mixed mode ventilation TB Infection Control Training for Managers at National and Subnational Level.
AN INTRODUCTION TO THE CIRRUS PRO RANGE OF FIRE DETECTION DETECTORS
Product Introduction.
Ventilation for Confined Spaces requires ventilation as follows: An employee may not enter the space until the forced air ventilation has eliminated.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Iris Range : «Unconventional» conventional detectors.
Lease Automatic Custody Transfer
Benefit and advantages using Iris conventional detectors range.
ANALYSERS & INSTRUMENTS DEPT. TUNNEL ROAD APPLICATION. I. -
UTILIZATION OF VISIBILITY MONITORING FOR FIRE DETECTION.
Enea Detectors Range.
NFPA 31 Standard for the installation of Oil- Burning Equipment
High Sensitivity Smoke Detection
Atrium Fire Protection
Temperature Control Loop
World Health Organization
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
Laser- based smoke detectors
Introduction to the ASD Suppression Actuation Threshold (ASAT) Calculator July _03_ASAT Calculator Sales and Marketing Introduction Presentation.
Heat Exchange Ventilation Heat Exchange Ventilation.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Sales / Design Presentation. Topics Aspirating Smoke Detection – What it is Fixed Vs Relative Sensitivity Systems – How do they compare? – ClassiFire.
The Next Generation HSSD HART XL. Why Hart XL Aspirating Smoke Detection? l Earliest detection to enable business continuity l Extra time is required.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
CUE – Make Any Pump an E-Pump
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
Protecting your contents and facility…. Cost effective, proactive fire protection is the priority of any Clean Room site : Semiconductors/Wafer Fabs.
Dental radiology د. باسم الاعسم.
Kaeser Direct Drive ESD Rotary Screw Compressor
HOUSING Division Corporate Marketing Department. Plastic Materials POLYETHERIMIDE (PEI) POLYSULFONE (PSU) PSU 3 years WARRANTY PEI 5 years WARRANTY.
FLEXIBILITY = Tecniplast is ready and willing to satisfy all the customers needs and provide the right solution for a professional outcome STAND ALONE.
Ventilation & Airflow NetShelter CX 18U,24U,38U Ambient office air is drawn in to the soundproofed air-intake chambers on either side of the NetShelter.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
EuroCave Cellar Conditioner CL-C. EuroCave cellar conditioners have been designed to preserve your wine in a perfect environment, guaranteeing minimum.
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
Building Automation System
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Electrical Gas Plumbing Heating & Cooling
HELIOS AMX5000 Minimax GmbH & Co. KG © Minimax 2009.
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
February 2019.
Smokes extraction principle
Presentation transcript:

ASPIRATING SYSTEMS TRAINING e-series

Air Sampling System Design Principle of operation Stages of Fire General System Design Pipe layout considerations Secondary Air-sampling Systems Primary Air-sampling Systems Referencing – ambient pollution compensation Effect of dilution on sensitivity Response time PipeTracer Adverse Environments System Components Maintenance

Air Sampling System Air drawn through pipe network to central system High sensitivity smoke detector Laser detection of particles for very early warning Adjustable alarm thresholds 0.005 – 20% obscuration/metre Pin-point addressing with sampling from up to 15 channels

Principle of Operation When smoke is detected the FHSD700 quickly samples each individual channel FHSD700 pulls air samples from the sampling channels simultaneously Within seconds it will inform the user exactly which channel contained the contaminated sample Air samples are drawn through a chamber where a laser beam illuminates any smoke particles, with a sensitivity of five parts in one hundred thousand Allowing the user to locate the hazard and prevent it progressing

Stages of Fire Identifying fires within its incipient stages for earliest possible protection Obs/metre : 0.1 Est. time to Fire : 45m Smoke not yet visible. Standard point detectors have not yet raised alarm Example Office Chair placed against heater Obs/metre : 1.0 Est. time to Fire : 10m Smoke clearly be seen. Conventional detectors sound alarm Obs/metre : 10.0 FULL FIRE Possible loss of premises, stock and life Obs/metre : 0.03 Estimated time to Fire : 1 hr Very fine smoke particles FHSD700 series sounds alert Obs/metre : 4.0 Est. time to Fire : 0m Flames appear and the office must be evacuated. The FHSD700 will activate combined suppression systems 0.01 0.1 1.0 4.0 10 20

General system design Define requirements/expectations at an early stage. What sensitivity is expected from the system Two main types of system With Air Handling Units (AHUs) Without Air Handling Units Special cases include clean rooms, cold rooms, historical buildings Perform smoke tests to ascertain patterns of air movement and position sampling points where smoke will propagate to.

Pipe Layout Considerations Pre-design pipe network, especially for wide-bore pipes Use a square grid overlay 6mx6m 8mx8m 8mx6m Ensure maximum pipe length is not be exceeded

Large bore systems - Pico, FT1, FT4, FT6 Use capillary tubes (8mm id with 2mm end hole up to 6m long) or drop pipes for concealed or cabinet sampling

Microbore systems - FT15 Flexible nylon 6mm o.d. sampling tube. Fast and simple installation in cabinets or within building structure Outputs and flow monitoring for every sampling point One tube can be used for referencing 2 way split (2m) allowed at end of tubes allowing 30 sampling points

Secondary air-sampling systems Air sampling placed in same places as conventional detectors and not relying on air conditioning systems Designed to BS5839/6266 and EN standards for spacing and placement.

Primary air-sampling systems System designed to work in conjunction with an air handling or ventilation system Only provides optimum performance when air handling system is operational Detects trace levels of smoke that do not have the thermal energy to rise to the ceiling

Primary air-sampling systems - AHUs

Primary air-sampling systems - AHUs Cover entry to Air Handling Unit not exhaust as this is filtered Sampling holes at 200mm intervals across AHU grille facing into airflow Extract ducts in shallow floor voids have high negative pressure and therefore sampling points should be positioned in front of but at least 2m away from the entry point

Primary air-sampling - Ducts Use Probe to penetrate return air duct allowing sampling holes to be directly in air path Ensure intake and exhaust probes are separated by 300mm and are properly sealed – high negative pressures exist Ensure probes are diagonally offset to avoid turbulence reaching exhaust probe

Primary air-sampling - Clean Rooms Earliest detection possible required to avoid damage from smoke contamination FT15 ideally suits application by monitoring individual cabinets and processes before the air is diluted and filtered Conventionally sited air-sampling networks struggle with the high airflows & ultra high dilution

Referencing - Ambient pollution compensation Take referencing air-sample from building air inlets Provides compensation for ambient pollution Use additional detector on RS485 network Use one sampling tube on system for integral referencing Set parameters for reference compensation and time delay

Effect of Dilution on Sensitivity Smoke entering a sampling hole is diluted by sampling holes closer to the detector

Table Showing Varying Dilution This depends on many different factors but this can be used as a rough guide for large bore systems

Response Times Response times are dependent on several factors Number of pipes Diameter of pipes Pipe length Distance to first bend Number of holes Hole spacing Aspirator speed and performance

PipeTracer Response times are calculated using PipeTracer software Detailed information about the intended layout is entered PipeTracer calculates all response times, flow volumes and hole balances together with sensitivity at each sampling hole

Adverse Environments Cold Stores / Chill Stores Dusty areas, and Mines Drill sampling holes in side of pipe Ensure pipes drop along length of store towards detector No vertical pipes Heat air sample outside store before entering FHSD Fit water trap – loop of flexible pipe before detector Keep pipes away from chiller exits Dusty areas, and Mines Use Filter+ pre-filter

Adverse Environments Hazardous Areas Atria Install FHSD in safe area Use in-line flame arrestors on interface between safe and hazardous area Atria Install vertical pipes to cover varying height of smoke stratification layer as temperatures change during day

System Components Laser Detector Aspirator Fan High pressure pump Rotary Valve Control Panel Control & I/O System Power Supply

Laser Detector A laser fires radially across optical chamber Any smoke particle is illuminated The scattered light is caught in the wall of the chamber which acts as a light-guide providing a total integration of the light from the smoke particles A particle density of 0.005% obscuration/metre is detectable with maximum range of 20% obscuration/metre Chamber is field removable for ease of service

Aspirator Fan – Pico, FT1, FT4, FT6 High performance high static pressure enabling detection over 100m pipe lengths with minimum response times Full speed control Includes by-pass sampling to preserve filter life

High pressure pump - FT15 Allows use of 4mm microbore tubing Carbon rotor & vanes for long life Stainless steel body for long life Vacuum sensor provides flow monitoring

Rotary Valve - FT4, FT6, FT15 Rotary valve for monitoring samples taken by up to 15 individual pipes Wide-bore application for ¾ inch pipe Small-bore application for high pressure systems Normally monitors all sectors - when trace level exceeded rotary valve immediately sequences to pinpoint sector Individual pipe flow monitoring

Control Panel Recognisable symbols for international markets Multi-language display settings Simple interface for easy configuration All alarms and faults clearly displayed to enable immediate identification Obscuration per metre level constantly visible Programmer RS485 remote interface

Control & I/O System Fully programmable system for continuous early warning detection of hazard Optional web support for remote monitoring using TCP/IP and Ethernet Optional input/output cards for relay contacts, auxiliary input/output and fire suppression RS485 connection for remote location of control panel

Power Supply Integrated mains power pack in either 230/115 Volt options Battery compartment for 2 x 17Ah batteries included Power pack provides 5Amp charge and trickle charge for batteries

Maintenance Optical chamber and filter cartridge – inspect at every regular service - clean chamber and replace filter if necessary Check all internal pneumatic connections for leaks Check pipe network flow levels Perform smoke test Replace pump vanes annually FT15 only Replace rotary valve seals every 3 years FT4, FT6 and FT15 only