1 Project Nexus Requirements Definition Phase Steve Nunnington.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Senior Stakeholder Forum Wednesday 19 th June 2013.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
1 Project Nexus Data Management Definition Workshop 18 th May 2009.
PN UNC Workgroup Supply Point Register 25 th October 2011.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Nexus Workgroup CSEP Transition Topic June
Gas Performance Assurance Framework 11 th January 2013 Confidential.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
1 Project Nexus Market Differentiation Workplan Version 0.2 Draft.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
PN UNC Workgroup Settlement topic 4 th October 2011.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
IGT and Shipper Workgroup meeting 28 th February 2011.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
UNC Modification Proposal 0202 National Grid Distribution
PN UNC Workgroup Invoicing 4th October 2011.
PN UNC Workgroup iGT Services
Modification th July 2008.
Project Nexus Workgroup
Project Nexus Workgroup
CSEPs Reconciliation Proposals
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Project Nexus Workgroup
PN UNC Workgroup iGT Services
DSC Change Committee Summary – 13th March ‘19
PN UNC Workgroup Settlement Overview
PN UNC Workgroup (Settlement topic)
Options for the Development of a Demand Side Response Mechanism
PN UNC Workgroup iGT Services
Project Nexus Workgroup
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Modification Proposal 136
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Customer Issue Management CoMC Update
Customer Issue Management CoMC Update for June 2019
Customer Issue Management Dashboard CoMC - July 2019
Xoserve Draft UIG Incentives Modifications 20 May 2019
DSC ChMC Switching Programme Update 9th October 2019
Customer Issue Management Dashboard CoMC
Presentation transcript:

1 Project Nexus Requirements Definition Phase Steve Nunnington

2 UNC Project Nexus Workstream Proposals  Project Nexus UNC Workstream formed to debate and develop the UNC Topics which support the delivery of Project Nexus.  21 Topics in scope within the ‘Initial Requirements Register’  9 major Topics  12 Others  Topics to be raised formally as per normal UNC Workstream governance  Any new Topics to be raised in this way  Proposal to employ Topic Workgroups similar in structure to UNC Development Workgroups  Workstream to review Topics and decide which Topics should be debated within a workgroup.

3 Project Nexus Interactions  Responsibilities of UNC Project Nexus Workstream  Prioritisation & grouping of Topics and issues  Recommend approval or rejection of proposals  Provide guidance to Topic Workgroups  Review Topic Workgroup update reports  Refer back to the Workgroup where further analysis or information is required  Review details of any new topics raised within the Workgroups and carry out an impact assessment to decide if a new Workgroup is required  Ensure adequate publicity is given to proposals, as appropriate  Seek views of the Authority or affected bodies (E.G. BERR, IGT UNC, SPAA etc.) on matters connected to any proposal  Define assumptions and principles to support the business rule development  Track cross Topic Workgroup inter-dependencies  Workstream to initiate legal drafting  Manage change control

4 Topics In-Scope of xoserve’s Prevailing Services  Initial Requirements Register – within scope of Workstream  Supplier Switching  Market Differentiation  Connection and Registration  Increased reads for Energy Allocation, Balancing and Transportation Charging  Reconciliation  AQ Management  Volume Capture  Invoicing Rules  Treatment of Retrospective Updates

5 ‘Other’ In-Scope Topics cont.  Governance of SPA  Fuel Poor  Incentive and Liability regime review  Review Of Reporting Requirements  Central Register of Emergency Contacts  Multiple shippers per legal entity  SSP I&C supply points  Demand Allocation data  Inclusion of Unique Sites within Nexus  New EUC for SSPs  WAR calculation review  Review SOQ process for DM & NDM

6 Topics Currently Out-of-Scope of xoserve’s Prevailing Services  Initial Requirements Register – currently out of the scope of Workstream  Data Management – Data Hub  Data Management – Quality Assurance  Data Management – Exchange & Flows of Data  Data Management – Central Data Store for Smart Metering Data  iGT Services  xoserve will look to build on the discussions being facilitated by Ofgem and SPAA in respect of iGT services and DECC in respect of Smart Meters.  xoserve will organise and facilitate separate workgroups for Data Management.  The outputs from the above Workgroups will contribute to the Topic Workgroup discussions

7 Resources Available  Requirements Register  xoserve’s Review of Topics  List of relevant Mods (Live and closed)  Interdependencies of Topic Workgroups  Contractual Obligation Impacts  Outline Terms Of Reference for Topic Workgroups  Industry participant benefit matrix  Impacts/Dependencies analysis from Data Management & iGT Topics  xoserve existing BPMs

8 Proposed Topic Grouping and Priorities  1 Market Differentiation Workgroup  2. Market Differentiation  2 Connection & Registration Workgroup  3. Connection & Registration  3 SPA Workgroup  1. Supplier Switching (Dual Fuel & Switching Timescales)  10.1 Governance Of Industry SPA process  10.2 Identification of Fuel Poor  10.5 Register of Emergency Contact Details  10.6 Multiple Suppliers/Shippers per legal entity  10.9 Single database for all supply points (E.G. Unique Sites)

9 Proposed Topic Grouping and Priorities cont.  4 Volume Workgroup  7. Volume Capture  5 Meter Reading Workgroup  4. Increased Reads for Energy  6 Retrospective Update Workgroup  9. Treatment of Retrospective  7 AQ & Allocation Energy Workgroup  6. AQ Management  10.7 I&C status / profile in SSP market sector  10.8 Demand Allocation data split by SSP and LSP market  Review Winter Annual Ratio calculation and allocation of EUC  Review treatment of SOQs in DM and NDM arenas

10 Proposed Topic Grouping and Priorities cont.  8 Invoicing Workgroup  8. Invoicing Rules  10.3 Review of Incentives & Liabilities  9 Reconciliation Workgroup  Reconciliation  10 Non-Functional Workgroup  This workgroup would discuss all non-functional areas, e.g. file formats and interfaces. The workgroup may require a representative from each of the other workgroups as the method and process for delivery of each topic will have to be considered

11 Proposed Topic Management  Governance  TOR for each Workgroup/Topic  All documentation available on JO website  JO to chair meetings  Minutes to be produced within 5 days  Agenda available at least 5 days prior to meeting  Monthly report to be sent to Workstream charting progress  Any new Topics to be approved by Workstream and allocated to a Workgroup  1 st Workgroup (per Topic area)  Decide on attendees  Venue  Dates and times of meetings (10AM – 3PM)  Sponsor to introduce Topic  TOR signed off  Creation of Workplan

12 Proposed Topic Management cont.  2 nd Meeting  xoserve produce ‘As Is’ Process Model  Baseline current process and obtain consensus  Outside the meeting stakeholders will identify issues  This could take more than one meeting dependent on complexity  Subsequent Meetings  Further opportunity for consultation respondents to air their views and develop their ideas into a tangible proposition  Other stakeholders to present their issues & Improvement Opportunities  Group to examine and discuss these proposals and discuss which ones should be taken forward  Consider impacts of in-flight mods  Consider determinations made to closed modifications (Joint Office)  Costs & Benefits should be the main driver to take issues forward

13 Proposed Workgroup Outputs  Re-draw Process Models after the discussions have concluded to give ‘To Be’ Maps  xoserve will maintain a register to ensure that all Topic areas are discussed and ensure traceability  Produce a Report for every Topic investigated including a justification for their outcome  Raise any UNC Mod as appropriate & pass to Workstream  Capture Requirements in a tool to be defined by xoserve  Produce a set of business rules sufficient to aid design  Where consensus cannot be reached escalation will be 1.Workstream 2.Modification Panel  If consensus cannot be reached the status quo remains

14. Project Nexus Requirements Definition Phase ‘Strawman’ Plan & Assumptions ‘Strawman’ Plan & Assumptions 30 th April 2009 Shirley Wheeler

15 UNC Project Nexus Planning Assumptions  Several principles need to be agreed by industry before commencement of workgroup workshops  Funding Principles  Change Control Mechanism  Approach proposal is accepted by UNC Workstream  10 Workgroups  Overarching Workstream  10 Topic areas determined as S, M or L  Determines the number of workshops per category Scene Setting Current Processes ‘To be’ Processes FinalisationSub TotalNo. of Scenarios Total S M L Makes a total of 111 workgroup meetings, excluding Workstream Meetings !

16 UNC Project Nexus Planning Assumptions  Workgroups cannot all be worked concurrently  Resources  Dependencies  If one workshop planned every three/four weeks timescale of 2010 cannot be achieved, therefore:-  2 day workshops have been planned for ‘Current Process Verification’  3 day workshops have been planned for ‘To be processes’  Consistency of approach/attendees  Less recapping on previous meetings  ‘Longer days’ – less travelling  Less Administration for all parties  Work content does not include any impact on accepting any iGT, Data Management/Smart Metering requirements  On ‘smaller’ non-related topics Modifications/legal drafting raised as soon as possible, but will still need to be included in final consistency check  Review of Requirements to ensure that they are all still relevant

17 UNC Project Nexus – Proposed High-level Plan

18 UNC Project Nexus – Proposed Workgroup Preparation Plan

19 UNC Project Nexus – Proposed Workgroup Plan

20 UNC Project Nexus Planning – Next Steps WhatWhoWhen Feedback to approach & planWorkstream13 th May 2009 Update approach, assumptions & plan.xoserve21 st May 2009 Approach, assumptions & plan agreed at Workstream Workstream28 th May 2009 Actual dates for all workshops,venues published xoserve12 th June 2009 Plan baselinedWorkstream25 th June 2009 Progress monitoring commencesAllOngoing