19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Construction and Installation of the CLIC Experimental Area
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Agenda : CLIC Civil Engineering and Services (CES) WG.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
ICL 26/05/2010 Relocation of electronics at Pt5 Summary of week 22 + roadmap Contributions from GS-SEM, EN-MEF, EN-EL, EN-CV, BE-ASR, TE-MPE, PH-CMX, TE-EPC.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
MDI 9 th Meeting - 22 nd January 2016 FCC Experimental Caverns - Feasibility and Excavation C. Cook (GS), J. Osborne (GS),
The integration of 420 m detectors into the LHC
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
CLIC Civil Engineering Update
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
CLIC Civil Engineering & Infrastructure
Experimental hall design in Japanese site
FCC lifts Layout, characteristics etc.
News from Integration WG
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
CMS Area Working Group Meeting
Detector hall in mountain regions
A very first look at siting issues
COOLING & VENTILATION INFRASTRUCTURE
CLIC Civil Engineering Update
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
LINAC 3 Meeting ICL machines Injectors
DS20k Integration Workshop
Presentation transcript:

19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC F Corsanego Contributions from Presentation of the CLIC Experimental Area Version considered for CDR…

CLIC Experimental Area -overview Site entrance

Towards an integrated design: → Collect input from all actors → Detector community (H Gerwig, A Gaddi, A Herve et al) → Service groups (CV, EL, HE, ASE...) → Safety bodies (RP, SC...) → Modify Civil Engineering layout accordingly → Step 1: Basic requirements for detector → See Talk by A Gaddi presented at MDI on 23/04 → Step 2: Produce 1 st set of 2D CE drawings → See Talk by J Osborne presented at MDI on 07/05 → Step 3: Collect input from EN-CV on ventilation → See Talk by M Nonis presented at CES on 09/05 → Step 4: Present an updated CE layout and ventilation concept → See Talk given at MDI on 11/06/2010 → Step 5: Present CDR version of the Experimental Area CLIC Experimental Area -overview

2D model of the underground facilities to be presented in the CLIC CDR and used for the costing exercise

2 Detector Caverns (120×25×39m) linked together by a transfer Tunnel * Driven by Push-Pull concept * Offers stability at the interface between the tunnel and the detector

-Two ventilation walls have been foreseen to seal off the interaction region from the Detector Caverns -Each wall consists of 2 sliding doors with a clearance in the top middle part for the magnet He line -The IP side wall of the cavern should be flat to allow for the efficient opening of the wall -The ventilation wall could be upgraded to a shielding wall If RP studies recommend it

-The position of the detector in the transfer tunnel break the continuity of the alignment system for the accelerator -Two survey galleries have been added to deal with the alignment of the accelerator components on both sides of the IP -The horizontal alignment is provided by a Wire Positioning System WPS -The vertical alignment is provided by a Hydrostatic Leveling System HLS

-Two escape galleries have been added to provide an emergency exit towards a shelter area located in the access shaft -The galleries will be in overpressure with respect to the caverns

-One 20ton overhead crane would be installed in each cavern. -Based on the CMS concept

Bypass tunnel: -To allow transport of equipment from one side of the IP to the other -Outside of the envelope of the caverns -No machine shaft connected to it yet…

-Two 18m diameter 100m deep access shafts -Lift, ventilation ducts, cable ladders, 2 stair cases, handling opening matching the size of the biggest detector element

Two Surface Detector Assembly Halls - 100m long, 25m wide, 25m high - Equipped with 2×80t cranes - Similar to what was done at CMS

Surface buildings to host: - Assembly halls - CV building - Cryogenics building - Gas building - Workshops… Layout inspired from CMS Already clear that some changes will be necessary… not for CDR!

Space has to be booked for the installation of the heavy lowering crane to lower down the detector

First considerations on Services Installation in the underground facilities H. Gerwig - 13th MDI 15 Hall Experiment 1 Hall Experiment 2 Transfer tunnel with IP Alignment Tunnel Flat walls on tunnel sides 19/10/

First draft concept for the ventilation system in the CLIC experimental area FUNCTIONNALITIES ENSURED BY THE VENTILATION: →Provide fresh air for personnel. →Treat air according to need: heating, conditioning, dehumidify. →Evacuate thermal charges. →Ensure dynamic confinement between machine and accessible areas where 100% air tightness cannot be achieved →Provide extraction capabilities →Filtering exhaust air before releasing into the environment. →Purge of areas (after fire).

Initial assumption to be confirmed by RP: → The interaction region should be a ventilation sector separated from the caverns → Dynamic confinement to be considered 19/10/2010 P USC55 – P UXC55 = 20Pa P Shelter – P USC55 = 20Pa P UXC55 – P S45 = 20Pa P UXC55 – P S56 = 20Pa Scheme at CMS

First idea: Use of a ventilation wall in conjunction with inflatable seal and expanding fire proofing sacks (TX54) 19/10/2010

First idea: For CLIC moveable shielding walls, the cavern side of the opening to the transfer tunnel could be equipped similarly 19/10/ st layer of sacks Inflatable Seal 2 nd layer of sacks Transfer Tunnel

The detector would be moved into beam position on a moving platform The concept could be similar to the PX56 plug (2200 tons) N Siegrist – PH-CMX

19/10/2010 Solutions to seal off a moving platform the size of the PX56 plug have been successfully implemented. → Area between the platform and the floor of the interaction region would have to be made airtight

19/10/2010 Since the services should not be disconnected, Cable chains will have to be used. Sealing off moving cable chains will be challenging Option to study: → Trenches could be closed in an airtight fashion using appropriate cover plates

Ventilation sectors: The underground area shall be divided in the following sectors: → Cavern A → Cavern B → Bypass and interaction region → Emergency escape tunnel → Pressurised areas in shaft (2)

Ventilation sectors: The underground area shall be divided in the following sectors: → Cavern A → Cavern B → Bypass and interaction region → Emergency escape tunnel → Pressurised areas in shaft (2)

The standard ventilation scheme foreseen for the tunnel should stop before the junction with the bypass tunnel 19/10/2010

Ventilation sectors: The underground area shall be divided in the following sectors: → Cavern A → Cavern B → Bypass and interaction region → Emergency escape tunnel (2) → Pressurised area in shaft (2)

For each sector it is foreseen: →fresh air supply, →extraction system, →redundant AHUs located on surface, →air recycling, →ducts via existing shafts The ventilation system will require a secured power network (UPS, Diesel) Assumptions for CDR: Temperature surface buildings →Summer: T Air = 25deg C +/- 2deg C →Winter:T Air = 18deg C +/- 2deg C

29 Cavern Sectors Power supply Slow dump resistor Breakers Cold box Fast dump resistor Dewar Flexible sc bus-bars Flexible transfer lines Services at end of Cable Chains Potentially closed A Gaddi Proposed parameters -Thermal charge 125kW ±50% for each detector (A Gaddi) -T=20°C±1 -H= [40%; 60%] -Dedicated gas extraction for Gas room

Summary → The CDR version of the CLIC Experimental Area has been presented and will be used for the costing exercise → More modifications are expected as constraints from services groups are consolidated. → Next steps: → Come up with a draft shaft cross section including lift, ventilation ducts, elements of detector, staircase, cable trays → Come up with a draft layout of surface assembly halls. One idea to investigate would be to have only one set Heavy Lowering gantry crane/ Plug 19/10/2010