XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Commission’s draft staff working document on Art. 22 ERGEG’s view ERGEG’s Gas Focus Group (GFG) XV Madrid Forum, 6/7 November 2008.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
XVIII Madrid Forum Madrid, September 2010 Wholesale energy trading licenses in the EU Johannes Kindler, Vice-President Federal Network Agency Germany.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Walter Boltz, Chairman ERGEG Gas Working Group 16 th Madrid Forum, 29 May 2009 Storage Capacity allocation & congestion management Criteria to determine.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
Rocio Prieto - Comisión Nacional de Energía 19th Madrid Forum March 2011 CMPs and anti-hoarding in European LNG terminals Results from public consultation.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
XV Madrid Forum, 6 and 7 November 2008 ERGEG Guidelines of Good Practice for Gas Balancing (GGP-GB): 2008 ERGEG Monitoring Report Mr. Walter Boltz ERGEG’s.
Johannes Mayer (E-Control), Chair ERGEG URB TF Karsten Bourwieg (Bundesnetzagentur), ERGEG URB TF Citizens’ Energy Forum, London, September 2009.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Amendment of GGPSSO for CAM and CMP.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Gas Regional Initiative – North West Region RCC meeting The Hague – 5 th July, 2010 Secondary capacity markets Project update.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
Congestion Management
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Gas Transmission Europe
GSE worked with ERGEG on CAM/CMP since
Background and Process
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas balancing – where next
Capacity Allocation Mechanisms
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
DRAFT DG TREN Staff Working Paper on LNG
Regulators’ views on Transparency
Meinhard Janssen GIE Board Member
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG comment to KEMA study on Art. 3 and 7
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Presentation transcript:

XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)

2 XV Madrid Forum, 6 and 7 November 2008 Background  Improvement of storage access conditions  Most European storages fully booked  Poor transparency  Entry barrier for new entrants  Capacity hoarding  What happened?  ERGEG GGPSSO since March 2005  After Monitoring the GGPSSO twice incomplete implementation identified  Development of specific Guidelines for storage on CAM and CMP  ERGEG Work Programme 2008: enhancement of these guidelines  ERGEG GST TF 2008  Survey on CAM/CMP and Secondary Markets  Questioning of NRAs, SSOs and storage users  Current way of development, design, acutal use and effects of the system regarding CAM/CMP and Secondary Markets

3 XV Madrid Forum, 6 and 7 November 2008 Response Rate to Questionnaires  Response rate NRAs: 67%  12 NRAs out of 18 ERGEG member states with storage capacity  Response rate SSOs: 56%  29 SSOs (18 GSE and 11 non GSE members) out of 52 SSOs addresses  most answers lacking from German SSOs (but 65% of the wgv in Germany covered)  64% of the wgv of EU member states covered  Response rate storage users: 17%  30 responses (Wholesaler, Trader, regional companies) out of 186 company addresses  Little response from Industrial costumers and Distribution companies

4 XV Madrid Forum, 6 and 7 November 2008 Applied CAM - Answers SSOs  Developing CAM  For 80% of SSOs the main customers are affiliated companies  SSOs report to consult with customers (but mainly affiliates)  For 27% of countries (NRA answers) no legal requirements for CAM  No specific legal requirements on the design of CAM

5 XV Madrid Forum, 6 and 7 November 2008 Preferred CAM - Answers Storage Users (to 75% integrated with SSOs)

6 XV Madrid Forum, 6 and 7 November 2008 First come first served  On average 49% of the capacity is booked by affiliates  with FCFS 80% of capacity is booked out by affiliates  On average the refusal rate was 24%  Applying FCFS the refusal rate was 34% compared to 0% regarding CGWC  On average 20% of the capacity is locked in contracts longer than 5 years  Applying FCFS 68% is locked in contracts longer than 5 years Preliminary conclusions  FCFS applied by an integrated SSO prefers the affiliate  Does FCFS treat new entrants and incumbents equal?

7 XV Madrid Forum, 6 and 7 November 2008 Capacity goes with the costumer (CGWC)  Effective, because no refusals of capacity requests  On average 38% of the SSOs have available capacity in 2009  With CGWC 100% of SSOs have available capacity in 2009 Preliminary conclusions  The capacity allocation has to take into account the flexibility already available in the portfolio of a shipper  Does CGWC treat new entrants and incumbents equal?  Enough capacity for other storage purposes has to be assured  On average 62% of the SSOs also offer unbundled firm products  With CGWC 33% of the SSOs offer unbundled firm products

8 XV Madrid Forum, 6 and 7 November 2008 Applied CMP (contractual congestion) - Answers SSOs Developing CMP  in case of 67% there are no special legal requirements for CMP  therefore in most cases no regulatory intervention in case of discriminatory behaviour possible As CMPs are applied in different combinations, it is not possible to give the corresponding wgv

9 XV Madrid Forum, 6 and 7 November 2008 Preferred CMP by storage users

10 XV Madrid Forum, 6 and 7 November 2008 Secondary Markets  36% of NRAs – requirements on a legal basis for a common trading platform (only a small number has to place ALL trades)  in 64% development of a common platform voluntarily  BUT users trade among themselves, SSOs do not get any information  have to be facilitated to optimize the use of capacity -incentives for storage users to use bulletin boards -appropriate legal measures -obligation for SSOs to improve and enhance the platform according to consumers/market needs

11 XV Madrid Forum, 6 and 7 November 2008 CMP – Key questions  Definition of a congestion management procedure: (1)First step: making capacity available (2)Second step: reallocation  How effective are the CMP regarding capacity release as some CMP still lacking the practical test?  How capacity, traded on “secondary market”, is really made available and transparent ?  Are “interruptibles” equal to other CMP?  How can a practicable UIOLI be designed in the storage market?

12 XV Madrid Forum, 6 and 7 November 2008 Preliminary conclusions  CAM/CMP applied by integrated SSOs shall be designed in a non-discriminatory way and shall facilitate competition  FCFS applied by integrated SSOs prefers the affiliate  Obligation for storage users to facilitate trades on secondary markets are needed  How can “unused capacity” in case of UIOLI be defined?  In some countries a preferential CAM to affiliates takes place

13 XV Madrid Forum, 6 and 7 November 2008 Next steps  Assessment of different CAM and CMP  in a discussion paper for public consultation planned  by defining preconditions under which market situations the various mechanisms are appropriate  regarding the requirements for CAM and CMP stated in the GGPSSO  Based on assessment and the outcomes of the public consultation GGP on CAM & CMP to storage will be drafted

14 XV Madrid Forum, 6 and 7 November 2008 Further information is available at Thank You !