© 2001 The Gas Company. All copyright and trademark rights reserved. High Efficiency Unit Heaters Workpaper Presentation Prepared for Cal TF Presentation.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Energy Conservation Energy Management.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
A Comparison of Measure Avoided Cost Calculations using Utility TOU Load Shapes and DEER Hourly Measure Savings 14 March 2006.
Estimating Key Parameters for the Retail Plug-Load Portfolio (RPP) Program: Recommended Methodological Approaches EM&V, Residential Programs, Products.
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
California Energy Commission Customer-side Distributed Generation Impacts CED 2013 Preliminary Demand Analysis Working Group DG PUP June.
DEER2013 Codes and Standards Update for the Cycle 17 July 2013.
Plans for Commercial Building Benchmarking R&D in 2006 Martha Brook California Energy Commission PIER Buildings Program presented to the EPAC on December.
Statewide Measure Cost Update Overview & Discussion.
Lecture 7: Building Modeling Questions Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to the National.
Action-Oriented Benchmarking Paul A. Mathew, Ph.D. Lawrence Berkeley National Laboratory Berkeley California Using CEUS Data to Identify and Prioritize.
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
1 What is DEER?  Database for Energy Efficient Resources -A listing of residential and non-residential energy efficiency measures located at:
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Commercial Variable Speed Swimming Pool Pump Jason Wang Cal TF Work Paper Presentation October 23, 2014.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
DNV GL © SAFER, SMARTER, GREENER DNV GL © ENERGY Industrial, Agricultural and LARGE Commercial- 4(IALC4) 1 PY2013 NRNC WHOLE BUILDING IMPACT EVALUATION.
Floating Head Pressure for Refrigeration Single Compressor Systems Michele Friedrich, PE – Sr. Engineer Dustin Bailey – Engineer PECI 11/2/2010.
1 Proposed Changes to the RTF’s Heat Pump Specifications Impact on Estimated Deemed Savings and C&R Discount Program Credits.
Research Strategy Review: Heat Pump Water Heaters Thermostatic Restriction Valves Jennifer Anziano RTF R&E Subcommittee July 8, 2015.
Overview of the 2009 LIEE Impact Evaluation Workshop 1: “Overview of Lessons Learned” October 17, 2011.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
HPWH UES Measure Initial Review 16 April Agenda Provisional Measure Review Method Overview Prelim Findings Measure Development Approach Simulation.
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Circulating Block Heater Alfredo Gutierrez Cal TF Work Paper Presentation October 23, 2014.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
EnergySmart Grocer Program Evaluation Findings Summary PWP, Inc.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Washington Energy Star and Built Green Homes Measure Update New Measure Proposal August 12th,
Strip Curtains for Refrigerated Walk-in Boxes Michele Friedrich, PE – Sr. Engineer Eric Mullendore – Energy Analyst PECI 8/3/2010.
Heat Pump Water Heater Request for Feedback on a proposal to add UES measures with a “Retail – any installation location” delivery mechanism Regional Technical.
California Energy Commission California Energy Demand Preliminary Electricity Forecast July 7, 2015 Chris Kavalec Energy Assessments Division.
1 COST ESTIMATING. 2 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility.
Deemed Savings Update: ECMs in Display Cases Ben Cartwright PECI January 5, 2009.
Copyrighted © 2000 PG&E All Rights Reserved CASE Initiative Project Energy Analysis Review of Implications Jon McHugh, Sr. Project Mgr. The H ESCHONG M.
Ben Chou NRDC Water Program Clothes Washer Recycling Work Paper Abstract California Technical Forum October 23, 2014.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Review of the New England “Mini-Pilot” DHP Evaluation Why we ignore this study.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
New Construction Studies Performed by: MAESTRO/CALMAC Evaluation Showcase ● Pacific Energy Center ● July 26-27, 2006 EM&V of the Statewide Savings By Design.
T12 to HPT8 Change-outs Small/Rural request for development May 15, 2012.
Northwest Power Planning Council Residential Space Conditioning and Domestic Hot Water Conservation Resource Assessment Overview of Analytical Process.
Advanced Lighting Control Systems (ALCS) Energy Estimation Tool Pacific Gas & Electric Company Dave Alexander.
Heat Pump Research Project Sponsored by the Heat Pump Working Group April 5, 2005.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
California Energy Commission California Energy Demand Revised Electricity Forecast December 17, 2015 Chris Kavalec Energy Assessments Division.
1 Summary of Reviews: Workpapers Approved by the California Technical Forum Part 2 Meeting: California Technical Forum January 28, 2016 Jeff Hirsch/Kevin.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Performance Tested HVAC Presentation to the RTF January 5, 2010.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 12/17/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.
DNV GL © 2016 SAFER, SMARTER, GREENER DNV GL © 2016 HVAC 3 Quality Maintenance Program Year Impact Evaluation.
ANTONIO CORRADINI & M M VALMIKI, AESC MAY 26, 2016 High Efficiency PMSM Fan Assemblies for Refrigerated Case Evaporators - Abstract.
© 2005 San Diego Gas and Electric Company and Southern California Gas Company. All copyright and trademark rights reserved Water Energy Nexus Calculator.
Fort Stanwix National Monument Energy Audit
Fort Stanwix National Monument Energy Audit Contract
HVAC-4 Deemed Measures Uncertainty Study, Year 2
Fort Stanwix National Monument Energy Audit
Sustainability and Life Cycle Costing of Air Filtration
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

© 2001 The Gas Company. All copyright and trademark rights reserved. High Efficiency Unit Heaters Workpaper Presentation Prepared for Cal TF Presentation Sept 24, 2014

Overview Seeking TF approval of draft workpaper Measure Description Measure Summary Abstract Review Comments – Cal TF Abstract Review Comments – Commission Staff CEUS data: SCE vs. statewide EFLH: Connected vs. peak load, other considerations Savings: WP vs DEER IMC

Measure Description Unit Heater Self-contained, automatically-controlled, vented fan-type gas space heater designed to be installed without ducts, within the heated space Thermal Efficiency: 90% or above (11% improvement) Size ranging 50~600 kBtuh Measure Application Type ROB/NC Measure Delivery Type Prescriptive rebate per kBtuh Impacted Market Non-residential Warehouses, distribution facilities, garages, loading docks, & etc. Market Potential Low shipping volume in CA

Measure Summary Gas Savings 0.38 therms/kBtuh (CA average) Range between 0.17 ~ 0.87 therm/kBtuh for 16 CZs Decreased by a factor of 2.85 (peak load vs. connected load) IMC $8.17/kBtuh Incremental equipment cost + additional material & labor for condensing unit EUL 20 years DOE shipping data + DEER HVAC-Frnc Net-to-Gross: 0.70 default value per DEER All-Default<=2yrs

Abstract Comments– Cal TF EUL – 20 years Oversizing No oversizing factor to be considered Savings Methodology Engineering calculation using CEUS and other resources Building type Use warehouses Enclosed space with an appropriate temperature control

Abstract Comments– Commission Staff Calculating savings based on the actual capacity and climate zones. Equivalent full load hours highest in SCE EFLH: Non-coincident peak heating load vs. Total connected equipment load Comparison to simplified DEER Additional Installation Cost

Savings Calculation

CEUS: SCE vs. Statewide Utilities Areas in CEUS SCE: Substantially higher consumption (W/H) SCE: Lower than PG&E (20%) for other building types Study Sample 250 warehouses surveyed 65 sites metered TF Feedback Requested: Use statewide data?

CEUS: Equivalent Full Load Hour Peak Load vs. Connected Load Peak Load Calibrated using metered data collected by fan measurements for sample of buildings One-hour maximum consumption, based on simulated load profile Connected Load Gathered from actual site surveys of equipment inventories Represents how equipment is actually sized and placed for this building type

Equivalent Full Load Hour: Additional Considerations Operation depends on Thermostat settings and setback schedules Bldg. location and climate Door openings Ventilation system Ceiling heights Internal heating loads Agreed on “Connected Load”?

Comparison with Simplified DEER Preliminary analysis using DEER by Commission Staff Conditioned Storage (SCn) D08-NE-HVAC-airAC-SpltPkg-240to759kBtuh-9p8eer Measure Case:HEATING-HIR = 1.11 Base Case: HEATING-HIR = 1.25 Are savings reasonable?

Consideration of Cost Additional labor and supporting material Site-specific conditions dictating whether installation cost is higher or lower than conventional unit heaters. Condensate disposal Replacement of existing flue Condensate neutralizers, and outdoor-air dampers require periodic servicing Estimated additional $500 incremental installation cost per unit IMC: $6.07 (equipment) + $2.10 (installation) = $8.17 / kBtuh

Question or Comment?