Progress Report 2010 John Parker Chairman, Get Ready Central Florida
2010 FOCUS Brainstorming Collaboration Partnerships Marketing & Education
1 st Quarter Achievements
First “Get Ready” City In Florida Mayor Signs MOU Joins Project Get Ready
Permanent EV Education Center Electric Vehicles Charging Stations Solar – Electric Car
Nissan LEAF Ride & Drive Event
Launched Website: Completed PGR Progress Report *Readiness Ranking: 3 out of 5
2nd Quarter Progress
Met With Orange County Building Officials * Mission: Streamline Permitting
Residential vs. Business Installation Standalone permit vs. Engineering Designs Check UL listing, wiring & loads - (150’ From Transformer Avoids Line Losses) Service from House / Business Panel (40 / 60 amp) Ground work Protection from damage - bollard, curb, height Back from curb 36” ADA accessible space, at least one (Business)
Highlights of NEC Art. 625 Must be listed & labeled for the purpose (Signage) Mounting height from 18”- 48” If installed indoors requires mechanical ventilation system Equipment installed so no one has access to live electrical parts. PUBLIC CHARGING STATIONS
Raleigh Permit Application Process for Electrical Vehicle Service Equipment (EVSE)
Demonstration Vehicles Evolve