INTERNATIONAL DRAFT ESBI Workshop on OC October 9th-10th 2000 Presenters John Kennedy & Meadhbh Flynn.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

EMS Checklist (ISO model)
Guidelines for Good Practice on Information Management and Transparency EuroPEX Comments and Suggestions Brussels, 6 th of July 2006.
MPID 223 (Failure to Follow Synchronising Instruction) JGCRP 12 th November 2014 (Anne Trotter)
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
John Zammit-Haber National Grid
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
A Partial Interim Report To WMS Guidance on Implementing Protocol Implementation Plan (PIP) 102 Reactive Power Task Force.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Network security policy: best practices
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Introduction to Software Quality Assurance (SQA)
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Short Term Testing Mod 65_08 Modification Committee 25 th November 2010.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Transmitted by the representative of JAPAN Toward Realization of the “Mutual Recognition of International Whole Vehicle Type Approval (IWVTA)” under the.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
SEM – One Year On Liam Ryan, Market Operations Manager.
Leader-Follower Framework For Control of Energy Services Ali Keyhani Professor of Electrical and Computer Engineering The Ohio State University
Renewable & CHP Generators : A suppliers perspective Presentation by Steve Armitage Tel
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Transmission Customer Forum Operating Agreement Update Cheryl Johnson 9/21/06.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Distributed Generation Registration June 30, 2008.
T&SC Modification Proposal: Clarification of Outturn Availability
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Wholesale Electricity Spot Market (WESM)
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
GC0104 – Demand Connection Code (DCC)
Agenda TSOG 8th November
Transposition of European Network Codes
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Reactive Power Task Force
INTERCONNECTION GUIDELINES
Review of System Alerts
Overview of the Electricity Regulation Bill
Overview of the Electricity Regulation Bill
Pseudo-tie business procedure
EU-IPA12/CS02 Development of the Renewable Energy Sector
Update to Unit Under Test Process
Interconnector trading in SEM 7th June 2007
Pseudo-tie business procedure
Presentation transcript:

INTERNATIONAL DRAFT ESBI Workshop on OC October 9th-10th 2000 Presenters John Kennedy & Meadhbh Flynn

INTERNATIONAL DRAFT ESBI Workshop on OC October 2000 Agenda for the next two days Using the User Guide to Grid Code we will make presentations covering  General Conditions  Connection Conditions  Planning Conditions and Planning Code Appendix  Operating Codes 1-13  Special Dispatch Codes1-3 and Appendix  Glossary

INTERNATIONAL DRAFT ESBI Workshop on OC October 2000 The Format of the Presentations  Users Guide  Construct Flowchart of actions and events  “Breakout Groups” - to discuss issues and make changes  Use of flipcharts to capture unanswered questions and suggested changes  Role play of events to achieve better understanding  Plenty of time for Questions and Answers  A short post-workshop report will issue to tie-up outstanding issues

INTERNATIONAL DRAFT

DRAFT Purpose of Operating Code  Fundamentally a technical document containing the Rules governing the Operation, Maintenance, and development of the Transmission System  Gives Users an understanding of the Rules and provides for equitable treatment for all.  It refers to documents that are not part of the Operating Code e.g. transmission planning criteria, operating policies, interconnection  It does not address commercial issues - penalties -violations -failure of services  These are dealt with in other agreements

INTERNATIONAL DRAFT Hierarchy of documents

INTERNATIONAL DRAFT Precedence of Definitions  Importance of common understanding  Hence a Glossary is included  If a Term is Defined in the Operating Code it will take precedence over the definition in the Glossary

INTERNATIONAL DRAFT Governance  The Operating Code is a “living” document - it is subject to changes  Approved by RAE -brings it into being  Modifications, Updates, Derogation requests, will be approved by REA - keeping it alive

INTERNATIONAL DRAFT General Conditions  Makes provision for rules of a more general nature making a cohesive document allowing the operation of the transmission System for the benefit of all  Requirement of HTSO to establish and maintain the OCRP  Allows derogation rather than changes to design specifications  General Conditions requires users to comply with the”letter & spirit” of the code and provides HTSO with its rights  HTSO will act reasonably - “Prudent Utility Practice” It should be noted that if there a conflict between Operating Code and any other agreement the provisions of the Operating Code will prevail  If parts of the Operating Code unlawful/invalid the validity of all remaining provisions will not be affected

INTERNATIONAL DRAFT Connection Conditions  To protect plant certain minimum criteria are met - technical - design - operational  These are defined in Connection Conditions  This is to allow stable, secure operation of the transmission system  Compliance required from all users  Performance of the transmission system at the connection point to enable new users to design their equipment  For existing plant derogation will be through REA

INTERNATIONAL DRAFT CC Overall Structure

INTERNATIONAL DRAFT Planning Code  Planning code is necessary to allow development of the transmission system - demand growth - new connection - development of existing facilities  Planning code allows HTSO/User interaction covers - performance impacts on either side - information requirements of HTSO to allow it plan according to criteria and standards - Prepare Forecast statement

INTERNATIONAL DRAFT Planning Code- Outline of application procedure Complex Connection? User applies to HTSO for connection HTSO sends Connection Offer to User HTSO requests more data from User User sends Preliminary Project Planning Data to HTSO HTSO carries out further analyses HTSO sends revised Connection Offer to User User accepts offer? User sends Committed Project Planning Data to HTSO within 60 days HTSO and User signs Connection Agreement Yes HTSO publishes Forecast Statement and Use of System Tariffs Yes Connection Offer lapses if unaccepted by User before Connection Offer Expiry Date No

INTERNATIONAL DRAFT Operating Codes (OC)

INTERNATIONAL DRAFT OC1 Safety Co-Ordination  “Safety First” and so it is with the Operating Code OC1  Establishes the requirement of HMSO (or agents) as well as users ( or agents) to operate in accordance with approved Safety Rules. It is assumed that PPC’s will apply to everyone  Other rules allowable if complying with all national/international and legal requirements  Applies to interconnected systems

INTERNATIONAL DRAFT OC2 Information Exchange  This Code deals with - notification of event and event reporting - operational communication an data retention  Pre-connection communication is covered under Connection Conditions

INTERNATIONAL DRAFT OC2- Overall structure All Users Generators DSO Grid Connected Customer HTSO

INTERNATIONAL DRAFT OC3 Metering Code  For settlement purposes imported and exported MWh and MVArh are measured at defined points  OC3 specifies the minimum technical, design and operational criteria for metering and data collection  The Settlement System provides for payments due  Metering is provided by HTSO and DSO and will be registered in an appropriate system

INTERNATIONAL DRAFT OC 4 Demand Forecasting  Demand forecasting will be required over different time scales - Operational Planning - Programming - Control - Post Control  Exact HTSO responsibilities yet to be determined  Anyway will require typical profiles from DSO for defined categories of day type. HTSO will define these day types  Unnecessary duplication can be avoided by using information delivered under SD1 for centrally dispatched and embedded generation  Pumped storage generation treated as negative generation  Possible agreements required with external TSOs

INTERNATIONAL DRAFT OC4 Summary of information needed

INTERNATIONAL DRAFT OC4 Information for Demand Forecast Operational Planning Phase User Information Post Control Phase User Information HTSO conducts demand forecasting Historic Data User information Transmission losses System Events Other information Programming Phase User Information Control Phase User Information

INTERNATIONAL DRAFT OC5 Demand Control  Operator must feel comfortable with methods employed in Demand Control - Empowered to act  The operator should have extensive knowledge of control methods and act quickly in emergencies and if necessary break the rules if needed  Mainly DSO will act on behalf TSO - contact between suppliers and customers will need to reflect the necessity of demand control  There may be tariff arrangement that allow for a higher risk of disconnection  Exemptions - need arrangements in place

INTERNATIONAL DRAFT OC5 Overall structure

INTERNATIONAL DRAFT OC5 Demand Control Provision will be made for - Customer Demand reduction instructed by HTSO - Automatic low frequency demand disconnection - Automatic low voltage demand reduction - Automatic Demand Restoration

INTERNATIONAL DRAFT OC6 System Services  System services for network control and operation now more formalised (payments and measurements)  HTSO will manage these services and will specify what services will be provided and by whom  Generator licences must have a requirement to provide certain services on reasonable terms  Services include - Frequency control Voltage control Network control Operating Margin and Power System Restoration

INTERNATIONAL DRAFT OC7 Interconector Management  Interconnector management is part of prudent system control  OC 7 facilitates secure trading with neighbouring utilities  Trading planned over three day time frame requiring posting of Available Transmission Capacity (ATC) and then allowing Independent and Franchise sectors access  Reserve sharing and restoration services should be covered by bilateral agreements

INTERNATIONAL DRAFT OC7 Summary of procedure

INTERNATIONAL DRAFT OC8 Generator Maintenance Scheduling  The role of HTSO not clear yet in the new environment - will still have to produce a Transmission outage Programme - maintain capacity adequacy - ensure system security - Areas of special constraints - produce timely information to market participants

INTERNATIONAL DRAFT OC8 Generator Maintenance Scheduling  Schedule time frames 1- 5 years - Indicative Outage Programme (4 -5 years) - Provisional Outage Programme (2 - 3 years) - Committed Outage Programme (year 1)  HTSO approves outages from a security point of view  Obligation on Generators to move outages  Need to develop mechanisms for dispute resolution

INTERNATIONAL DRAFT OC8 Summary

INTERNATIONAL DRAFT OC8- Procedure when HTSO requests change to COP HTSO requests Generator to change COP Amend COPCOP not amended Generator agrees Generator has reasonable case for declining request HTSO accepts conditions HTSO does not accept conditions Generator agrees subject to conditions

INTERNATIONAL DRAFT OC8- Procedure when Generator requests change to COP Amend COP Capacity adequacy OK No amendment to Generator's proposal HTSO evaluates effect on Capacity Adequacy Capacity adequacy not OK Generator prepares new proposal for change to COP Generator requests change to COP Generator takes forced outage for unit HTSO and Generator discuss modification to Generators proposal HTSO informs Generator COP not amended Generator makes change to Declaration of Availability

INTERNATIONAL DRAFT OC9 Transmission Maintenance Scheduling  Maintenance year runs from July 1st- June 30th  Schedule time frames 1- 5 years - Indicative Transmission Outage Schedule (3 -5 years) - Provisional Transmission Outage Schedule (year 2) - Committed Transmission Outage Schedule (year 1)

INTERNATIONAL DRAFT OC9 Transmission Maintenance Scheduling  First Business Day of July, TO gives HTSO: –the CMPR for Maintenance Year 1 (MY+1) –the PMPR for Year MY+2 –the IMPR for MY+3 to MY+5. –the start date and time and the duration of each Outage.  TO should avoid a situation arising in which the TO is obliged to schedule an Outage at short notice  In rolling over the Transmission Outage Programme Requirements from one year to the next TO shall not be constrained in making any submission by any previous IMPR.  1 July - 31 August of MY, HTSO does security analysis of MY+1 to MY+5 in light of proposed Outages and other relevant matters including Outages of Generation Units, Interconnection and load growth.  HTSO will highlight any concerns with the Transmission Outage Programme Requirements to TO by the end August in MY.  31 Aug - 30 Sept: HTSO and TO discuss any concerns

INTERNATIONAL DRAFT OC9 Transmission Maintenance Scheduling  The HTSO shall issue to TO a Transmission Outage Schedule for Maintenance Year MY+1 to Maintenance Year MY+5 by the fifth (5th) Business Day of November in Maintenance Year MY, comprising –the Committed Transmission Outage Schedule (CTOS) for Maintenance Year MY+1 –the Provisional Outage Schedule (POS) for Maintenance Year MY+2 –the Indicative Outage Schedules (IOS) for Maintenance Years MY+3 to MY+5.

INTERNATIONAL DRAFT OC9 Overview

INTERNATIONAL DRAFT OC9 Outline procedure

INTERNATIONAL DRAFT OC9 Outline procedure

INTERNATIONAL DRAFT OC10 Monitoring Testing and Investigating  For HTSO to discharge its duties for safe secure and economic operation there is a need to carry out monitoring testing and Investigation of User’s Plant  HTSO is to ensure compliance with Operating Code and needs to establish agreed procedures separate from the Operating Code  OC10 does not apply to Operational testing but check that users are within their design, operating and connection requirements  Methods to deal with disputes are required

INTERNATIONAL DRAFT OC11 Operational Testing  Covers responsibilities and procedures to arrange and carry out Operational Tests - these test can affect HTSO and Users  Central co-ordination required since there will be implications foe security quality continuity and economic operation  Tests required by HTSO or Users - Requesting - Evaluation - Approval - Scheduling - Dispatching - Reporting - Disputes

INTERNATIONAL DRAFT OC11 Summary part 1 of 2

INTERNATIONAL DRAFT OC11 Summary Part 2 of 2

INTERNATIONAL DRAFT OC12 Emergency Control and Power System Restoration  OC12 is to ensure that after a partial or total system collapse normal supply is restored to all customers quickly and safely  Generator licences include a provision to offer black start capability to HTSO ( this can be tested under OC10)  Various proposed System Alerts are presented  An up to date Power System Restoration Plan is Required

INTERNATIONAL DRAFT OC12 Emergency Control and Power System Restoration

INTERNATIONAL DRAFT OC13 Small Scale Generator Conditions  Small scale generation is defined by HTSO as less than 5MW for a single site  Some sections of Operating Code do not apply  Some important codes still apply like OC8 Operational Planning. Here the HTSO needs information like seasonal load factors and running patterns.  OC13 deals with –Outage Scheduling - Changes to the Committed programme - information to be notified –Network control

INTERNATIONAL DRAFT Scheduling and Dispatch Codes SDC Codes

INTERNATIONAL DRAFT SDC1 Generation Scheduling  HTSO obligation to to schedule and dispatch generation  HTSO requires accurate and timely information relating to generation and supply  SDC1 specifies procedures for issuing a generation schedule for a trading day and Demand forecast  Thus generator receive an indicative dispatch for the following day and thus be available for operation  HTSO maintains an operating margin desired flows on interconnections

INTERNATIONAL DRAFT SDC1 Generation Scheduling  General Requirements - Demand Forecast - Declarations by Generators - Daily Nominations - Communication of Declarations - Communication of Daily Nominations - ATC for interconnections - Production of Generation Schedule (GS) - Procedure in absence of a daily nomination

INTERNATIONAL DRAFT SDC1 Generation Scheduling SDC1.4 The HTSO publishes demand forecast for next dispatch day by SDC Generators send Declarations and Daily Offers for next Dispatch Day by SDC1.8 Exporting Purchasers send Nominations for next Dispatch Day by SDC1.10 The HTSO produces schedule between and for next dispatch day SDC1.10 The HTSO issues provisional running orders and publishes forecast system marginal price for each dispatch hour of next dispatch day

INTERNATIONAL DRAFT SDC2 Generation Dispatching  HTSO licence obligation to dispatch generation to meet demand  A structured process is required  SDC2 details the process to be used by HTSO decides the generation dispatch using the generation scheduled provided  HTSO procedure for communicating dispatch instructions - some details will depend on Market protocols

INTERNATIONAL DRAFT SDC2 Summary The HTSO forecasts Demand, sets reserve level and agrees ATC on interconnectors with External System Operators. HTSO issues dispatch instructions up to real time The HTSO issues dispatch instructions up to real time Accepted by Gen? Inform HTSO-must be for safety or emergency reasons Yes No Synchronising, desynchronising times Active Power Dispatch System Alerts Instruction in line with operating characteristics? Inform HTSO No Revise instruction Reactive Power Dispatch System Emergency Conditions Operating Mode Dispatch

INTERNATIONAL DRAFT SDC2 Dispatch Instructions: Synchronise/ desynchronise Yes Synchronising, desynchronising times Can synchronise within 10 mins. instructed time? Synchronise Effective redeclaration Can synchronise between 10 mins. & 4 hrs. instructed time? Issue redeclaration Yes No

INTERNATIONAL DRAFT SDC2 Dispatch Instructions: Active power, reactive power and operating mode dispatch Active Power Dispatch Achieve dispatch level within allowable tolerance consistent with Declarations Inform HTSO without delay if problem arises Reactive Power DispatchOperating Mode Dispatch Change operating mode consistent with Declarations

INTERNATIONAL DRAFT SDC2 Dispatch Instructions: Emergency Emergency Instruction Instruction may be outside Declared characteristics. Generator must comply except for safety reasons Inform HTSO without delay if problem arises

INTERNATIONAL DRAFT SDC3 Special Scheduling Provisions  SDC3 is to describe procedures to be adhered to by Users in defined special cases. –Congestion relief –Irrigation constraints –Minimum demand provisions –Renewable generation –Indigenous generation units –Hydro dispatch groups  Process for issuing instructions pursuant to SDC3 shall be in accordance with the provisions of SDC1 and SDC2.  Provisions of SDC3 do not supersede the provisions in SDC1 and SDC2.

INTERNATIONAL DRAFT SDC3 Irrigation Constraints Unconditional must-run output for each dispatch hour Availability for each dispatch hour Generator gives notice of constraints by day ahead of dispatch day and specify:: IRRIGATION CONSTRAINTS Maximum and minimum available energy for dispatch day Schedule and dispatch - SDC1 & SDC2

INTERNATIONAL DRAFT SDC3 Hydro Dispatch Groups Unconditional must-run output for each dispatch hour Availability for each dispatch hour Generator gives notice of constraints by day ahead of dispatch day and specify:: HYDRO DISPATCH GROUP CONSTRAINTS Maximum and minimum available energy for dispatch day Schedule and dispatch - SDC1 & SDC2 Generator must meet certain constraints to qualify as Hydro Dispatch Group

INTERNATIONAL DRAFT THE END Thank you from Meadhbh & John