Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering Institute of Municipal Water Management BRNO, Czech Republic
Water pipes in Czech Republic km water mains in the CR about 800 km per year should be rehabilitated questions What approach to reconstruction is the most suitable? What technology should be used?
Rehabilitation Planning terms long (15-20 years) middle (3-5 years) short (annual)
Annual Rehabilitation Planning main goal propose some pipes for rehabilitation questions where? when? how? cost?
Planning diagram
Steps of annual rehab planning 1.Basic elements
The basic elements hydraulic sections not favourable often too short entities several hydraulic sections with the same parameters: diameter material installation year system of streets pattern of development map of valves
Steps of annual rehab planning 2.Obtaining of basis data
The basis data town planning scheme Water-supply topology, mathematic model regulations for water supply operation long and middle term rehab plan operation documentation failures leakages television inspection survey analysis of water quality co-ordinations
Steps of annual rehab planning 3.Criteria
The set of criteria by CARE-W 1. Internal Annual Repair Cost Water Losses Index
The set of criteria by CARE-W 2. External Water Interruptions Predicted Water Interruption Predicted Critical Water Interruption Predicted Frequency of Water Interruption Damage and disruptions Damage due to Flooding in Housing area Damage due to Flooding in Industrial or commercial areas Damages due to Soil Movement Traffic Disruption Damages and/or Disruption on other Infrastructure Water Quality Deficiencies Hydraulic Deficiencies
The set of criteria by CARE-W 3. Other Co-ordination with other utilities and roadway rehabilitation programmes with service connection replacement programmes
The simple set of criteria
Steps of annual rehab planning 4.Selecting of entities
Multi-criteria assessment selecting a set of some elements (pipe- sections, entities) for rehabilitation sorting procedure the method of average weighting => sort list ranking procedure the Electre methods => categories CARE-W_ARP (INSA Lyon)
Steps of annual rehab planning 5.Rehab technologies
Database of the rehab technologies the selection of the right rehab technology for the sorted elements rehab technologies for water mains open-trench trenchless evaluation of every technology by criteria
Database of the rehab technologies applicability costs influence on environment pipe material water quality hydraulic properties supplemental information maximum length of pipe-section realisation time armature removing
Decision support for the Annual Planning 1.CARE-W_ARP
Priorities of operator „BVK“ Weight of criteria [%] Co-ordination Score3030 Annual Repair Cost2020 Traffic Disruption14 Year of laid1010 Predicted Critical Water Interruption8 Predicted Water Interruption6 Predicted Frequency of Water Interruption6 Damage due to Flooding in Housing area6
Annual Rehab Plan for Sub-zone by CARE-W_ARPby BVK (operator)
Decision support for the Annual Planning 2.NetPlan_A
NetPlan_A Knowledge basis Data Input Criteria Pipe materials Rehab technologies
NetPlan_A Task Data evaluating Sector value Criteria calculation Entities assortment Technology proposition
Conclusions main goal: to create a comprehensive support for annual rehab planning, which will be applicable in the conditions of the Czech Republic
Brno University of Technology Tomáš Kučera Thank you for your attention