CDBG 2015 Technical Compliance
Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs
Sections Projects ADA, Housing Rehab, Infrastructure, Community
4.4 Site & Building Report (non-infrastructure projects) Site & Building Existing Physical & Environmental Conditions 4.4 A. Infrastructure Projects Roads, Streets, Utilities, Walks, Parks, Landscaping 4.4 B. Approvals (all projects) 4.5 A-G Readiness to Proceed (all projects) Drawings/Specifications, Procurement, Cost Estimate, Completion Timelines 4.5 H Contract Doc Compliance Form (all projects) 4.5 J Project Budget (all projects) 4.6 Sustainable Features & Design (all projects)
4.4 Site & Building Report Update
Section 6 - Deleted Supporting Documentation Integrated into Sections 1-5
Supporting Docs Integration: Page 1, Section 2 Property Information Location, Street, Zoning Map ( new const)
Supporting Docs Integration: Page 2-Section 3 Property/Site Assessment FEMA FIRM Federal Emergency Management Administration Flood Insurance Rate Map
Supporting Docs Integration: Page 3-Section 3.III Environmental Site Conditions Phase I Environmental Site Assessment ASTM Designation E
Supporting Docs Integration: Page 3-Section 3.IV Environmental Bldg Conditions Hazardous Materials Reports/Notifications Asbestos, LBP, Mold, Radon, PCP’s, Mercury, Formaldehyde
Supporting Docs Integration: Page 4, Section 4 Building Information SHPO State Historic Preservation Office District, Building, Artifact
Supporting Docs Integration: Page 4, Section 5 Building Assessment Interior & Exterior Photo’s Capital Needs Assessment (HA)
8 Questions! 1. Is any Environmental Remediation needed?__Y __N 2. Is the property adjacent to properties with environmental risks? __Y __N 3. How old is the road, street, walk, etc.? ___ 10 __N/A 4. When were the last repairs, improvements, or replacement work for the proposed site?__ 10yrs __N/A 5. Unusual Site Conditions: Check all that apply. Submit supporting data (map etc.) for each item checked. Attach as 4.4EM ___Sediment/Soil Erosion__Easements___Wetlands___Rock
6. Submit a FEMA Flood Insurance Rate Map. All maps must be at a scale to clearly identify the project area and surrounding neighborhood(s). Attach as 4.4FEMA Is any of the proposed work in a flood plain? ___Y100 ___Y500 ___YFWay ___N If yes, have you started the Flood Plain Eval/Cert process? __Yes ___No 7. Submit Photographs. A minimum of six (6) existing conditions (if applicable). Attach as 4.4XPICS. 8. Will the project expand existing public utilities ?___Yes ___No (e.g. Main sewer line or Main water line)?
Readiness to Proceed (all projects) Sec 4.4B: Approvals/Clearances Sec 4.5A/B: Draw/Spec Comp Level Sec 4.5C/D/E: Timelines dwg-specs/const/approv’s Sec 4.5F: Cost Estimate 2 Years or less !
Supporting Documents (all projects) Sec 4.4G: Const’n Procurement Plan Sec 4.5H: Draw/Spec Compliance Form Sec 4.5J: Project Development Budget
4.6 Sustainable Features & Design a. Energy Star (non-infra projects) b. Alternative Energy (non-infra projects) c. Water Conservation (non-infra projects) d. *Storm Water Management (all projects) e. *Other Sustainable (all projects)
Section 4.7 Residential Rehab Programs
4.7 A Procurement 4.7B Building/Site Evaluation 4.7C Hazardous Material Notification 4.7D Construction Monitoring 4.7E Approvals 4.7F Typical Project Schedule
4.7 G 75% Rule/Walk-Away Compliance 4.7 H Rehab Stand’s/ACM/LBP Compliance 4.7 J Program Dev Budget Cost Est’g Form 4.7 I Walk-Away Policy 4.7 M Energy */Sust’ble/Eco/Recyc/Salvage
CDBG/Small Cities Residential Rehabilitation Program 75% REPLACEMENT VALUE THRESHOLD & WALK-AWAY POLICY COMPLIANCE CERTIFICATION
The 75% Replacement Value Threshold Community Development Block Grant (CDBG) regulations state that the maximum federal dollars for housing rehabilitation cannot exceed 75% of the replacement cost. The 75% rule for rehabilitation applies to rehabilitation cost only. Therefore, if the replacement cost of a home is $100,000, the maximum CDBG funds cannot exceed $75,000. Replacement is determined by identifying the cost of constructing a new housing unit of comparable size (i.e. square footage). 75% REPLACEMENT VALUE THRESHOLD WALK-AWAY POLICY COMPLIANCE CERTIFICATION (4.7G)
Walk-Away Policy __________________________ Residential Rehabilitation Program (Town Name) will not engage in the rehabilitation of a residence if the initial inspection reveals that the overall work required exceeds allotted costs and or completion of some of the required work without the completion of the overall work required is not feasible and or exacerbates physical, health and safety hazards, and or code issues. We will include the Walk-Away Policy Statement in a document which requires the participants’ signature at the Initial Inspection. 75% REPLACEMENT VALUE THRESHOLD WALK-AWAY POLICY COMPLIANCE CERTIFICATION (4.7G)
Page 58 in Handbook The DOH recommends that a grantee to “walk away” from a project when the cost to bring it into compliance with HQS exceeds $30K per house or $50K multi-family.
Walk-Away Policy Criteria Page 58 Handbook
Written Notification DOH also recommends that a written notification be provided to the homeowner if the project is deemed not feasible with appropriate reasoning and such documentation be filed for future monitoring. DOH’s consent is required if deviating from above policies and dollar thresholds. Grantee is required to provide justification when requesting such a request.
Recycling, Salvage
More than 2 years GLORY!!! NO GLORY!!!
GLORY!!! 2 Years or less! GLORY!!! JC Frazier, Architectural Technical Support-DECD