Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.

Slides:



Advertisements
Similar presentations
Fundamentals of IRB Review. Regulatory Role of the IRB Authority to approve, require modifications in (to secure approval), or disapprove all research.
Advertisements

1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
2011 Contribution Policy AESO Tariff Applications October 17 th, 2011.
October 2004 Wind Power in Denmark How did it start?
Bert Lathrop Director, IT Infrastructure 10/6/2011 WAN Management Fee - Billing Changes.
Documenting Network Design
International Swaps & Derivatives Association Transforming the Derivatives Business The Emerging Ontario Electricity Market July 11, Meg Timberg.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
1 Environmental Tracking System Fees Regulatory Affairs Standing Committee September 11, 2003 Market Evolution Program Update.
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
 Interconnecting DER With Electric Power Systems POWER SYSTEM 2002 CONFERENCE -- IMPACT OF DISTRIBUTED GENERATION Image.
Title V Fee Committee: Answers to July 2013 Questions September 11, 2013.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
ESTA Technical Standards Committee Product Stewardship.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Korea Institute of Science & Technology Dec. 2, 2013 Kiseok Choi A Study on the Improvement of Legal System for Collecting and Registering National R&D.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
Market Operations Standing Committee of the IMO Market Operations Standing Committee April 23, 2003.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Implementation of the Market Standards for Corporate Actions and General Meetings in the activities of the Central Depository AD Vasil Golemanski 25 September.
14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.
THE 2005 CERT ENERGY ROUNDTABLE Ontario’s Electricity Sector: The Hybrid Model Takes Shape By: Ron Clark May 31, 2005.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
Jun 18, 2003Market Operations Standing Committee of the IMO1 Market Pricing Integrated Proposal: Consequences, Trade-Offs & Implementation.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
PALERANG COUNCIL Proposed Special Rate Variation 2016/ /21 Public Exhibition : Draft Long Term Financial Plan and Draft Delivery Program (as amended)
January 2004doc.: IEEE /008r2 Clint Chaplin, Symbol TechnologiesSlide 1Submission Security Standing Committee Clint Chaplin, Symbol Technologies.
2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Building Industry Authority Determination 2003/3 Commentary Paul Clements.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
15 Jul 2003Market Operations Standing Committee of the IMO1 Treatment of Combined Cycle Generation and Related Aggregation Issues (MR-00121) John MacKenzie.
National workshop Pilot testing of Guidelines for updating of national implementation plans to address the new persistent organic pollutants in Abuja,
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
3 Dec 2003Market Operations Standing Committee1 Change Management: Market Rules Update John MacKenzie.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Transfer of shares to Investor Education and Protection Fund
Capital Improvement Plans
Japan’s proposal on the wording for driving-selectable mode
Special Protection Systems: Operational and Compensation Issues
Presentation transcript:

Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs January 14, 2004

2  To provide OPG’s rationale for its market rule amendment submission: – Problems with the current market rules – Proposed solutions Purpose of Presentation:

3  Special Protection Systems (SPS) allow the IMO to increase the utilization of the grid while maintaining system integrity.  Typical SPS control actions are generation and load rejection.  A more expensive alternative to SPS is transmission upgrades  OPG has generation rejection and runback schemes at quick- start (hydroelectric) and non quick-start (nuclear and fossil) facilities.  Hydro One owns the SPS equipment.  IMO directs the operation of the SPS with no obligation for direct communication to facility impacted by the SPS.  No compensation currently provided under the market rules. Background

4 Operational Issues  Facility operators need to be aware of status of SPS on an ongoing basis to assess risk to their facilities.  Under some conditions, facilities will reject an arming request (for reasons of safety, environment, equipment damage). Rules allow facilities to reject a dispatch instruction for the same reasons – need comparable allowance for SPS.  There are no requirements or standards in current market rules for a status signal informing a facility when an SPS is armed/ activated. For comparison, Market Rules (Appendix 4.15) require generators to provide equipment status indication to IMO, e.g., AVR and Stabilizer status.  Accountability for providing an SPS monitoring signal is not defined.

5 Proposed Solution:  MP/ owner of facility connected to SPS needs to agree to changes to SPS arming/ activation criteria  Where a market participant requires it, the owner/ operator of the SPS shall provide a mechanism to inform the market participant when the SPS is armed and activated. The mechanism shall be satisfactory to market participant (acting reasonably).  A market participant may reject a request to arm an SPS due to concerns regarding safety, equipment or environmental damage or legal requirements. Operational Issues

6 Compensation Issue  There are two categories of costs to a facility impacted by an SPS:  Operations and maintenance costs: Wear and tear costs each time a generation rejection scheme is activated (significant costs) plus incremental maintenance/ verification costs (minor incremental costs).  Lost revenue: Non-quick start facilities do not receive CMSC payments for the time they are not connected to the grid as a direct result of SPS activation.  Benefits of SPSs accrue to many market participants; risks are faced solely by facility impacted by the SPS.

7 Proposed Solution:  Non quick-start facilities receive CMSC payment for two hours after generation rejection based on offers already submitted.  This proposal is a compromise solution that likely does not address costs of wear and tear. Compensation