UIM, Dec 9, 2008 Criticality and Prioritization of Pipe Rehab Projects Annie Vanrenterghem Raven, Ph.D. Research Associate Professor Polytechnic Institute.

Slides:



Advertisements
Similar presentations
© Tarek Hegazy – 1 Basics of Asset Management Prof. Tarek Hegazy.
Advertisements

Keith D. Hodsden, Sr., P.E. Client Service Manager GIS & Hydraulic Modeling for Water / Sewer Asset Management and Rehabilitation Planning SAME 2012 SA/SC.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Farnsworth GROUP Rocky Mountain Section - American Water Works Association 2002 Joint Annual Conference CONDITION ASSESSMENT of Pinery Water and Wastewater.
Capital Budgeting For 9.220, Term 1, 2002/03 02_Lecture8.ppt.
Strategic Project Alignment With Team Expert Choice
What’s next in California's flood future? Finding answers: California Water Management Investment Strategy FEMA Region IX - CHARG Stakeholder Meeting July.
Maintenance Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 1 Infrastructure Management System. Managers and engineers need clear guidelines for life- cycle management of infrastructure systems for water,
1 A multi-criteria approach for asset management of waste water networks Joint Unit Research in Water Utilities Management Cemagref-Engees 1 quai Koch.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Managerial Economics Prof. M. El-Sakka CBA. Kuwait University Managerial Economics in a Global Economy Chapter 1 B.
Care Home Forum 19 th May 2015 Sarah Chittock – Merton Civil Contingencies Officer Taryn Milton – Emergency Planning Manager – Epsom St. Helier.
Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
PRM 702 Project Risk Management Lecture #28
Energy and Industry Trends Dave Molin VP & General Manager Honeywell Building Control Systems.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Fiscal Sustainability and Local Governments MFABC FINANCIAL FORUM MARCH 26, 2015 LYNDA GAGNÉ, PHD, CPA(CGA) ASSISTANT PROFESSOR, UNIVERSITY OF VICTORIA.
World Bank Conference on Financing Disaster Risk, Washington, 2003 Catastrophe Risk Models for Asia from the User Perspective George Walker Head of Strategic.
Isdefe ISXXXX XX Your best ally Panel: Future scenarios for European critical infrastructures protection Carlos Martí Sempere. Essen.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
Financial Sustainability of Water, Waste Water, and Watershed Management THE TOOLS OF THE TRADE.
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
By identifying specific financial goals, there’s a much better chance that clients will commit to invest.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Asset Management Planning for Pipe Renewal Peter Kraft Treated Water Planning.
Module 4: Systems Development Chapter 12: (IS) Project Management.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
hydroAMP asset management framework
1 Presentation By: Mr.O. Aphane Acting Deputy Director General: Electricity, Nuclear and Clean Energy (on behalf of the Director General, Ms N Magubane)
Damage and Losses Evaluation in Cases of Disasters An Introduction to the ECLAC methodology J. Roberto Jovel, Consultant.
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
1 Community Asset Management Program (CAMP) Asset Management GFOA Presentation April 3, 2007 Step 3 Visioning Step 4 Design Step 5 Pilot/Rollout “As Is”,
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
Evaluation of EC aid delivery through Civil society organisations Major findings and concerns relating to EC-NGO funding relationship and questions to.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
Community Resilience To Climate Change in Hawai`i 2009 Hawai`i Conservation Conference Hawai`i in a Changing Climate: Ecological, Economic, and Policy.
USACE Asset Management Risk and Reliability Workshop Condition Index Definitions Primer Allen C. Estes United States Military Academy.
1 Public Hearing User Rate Adjustments April 8, 2008.
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
The Smart Network: NRW, Pressure and Asset Management
Implementing an Adaptive Capital Improvement Program
NC AWWA-WEA 95th Annual Conference
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
KING COUNTY BRIDGES AND ROADS TASK FORCE Roads Services Division Financial Review September 16, 2015.
97 th Annual Purdue Road School Presented by: Katie Zimmerman, P.E. Applied Pavement Technology Transportation Asset Management.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
Asset Degradation Modelling at Townsville Water
Advanced Technologies Decentralized Recovery and Reuse
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Overview of the CoJ Water & Sanitation Master Plan
Chapter6 Risks ACCA P1.
AMI Hidden Costs and Hidden Values
Chapter6 Risks ACCA P1.
Determine Reinvestment
Measurement of Operational Risk
Our Valuable Water Infrastructure – Challenges of the 21st Century
AWWA Leadership Forum ASSET MANAGEMENT November 14, 2017.
Common Sense Steps Towards Strong Financial Planning
Capital Improvements Planning
WASTEWATER MANAGEMENT 19 September 2018
SOUTH AFRICAN INSURANCE ASSOCIATION
EMGT 501 Fall 2005 Final Exam Due Day: Dec 12 (Noon)
CRITICAL INFRASTRUCTURE RESILIENCE INDEX (CIRI)
Operationalization of a Public Works AM Strategy
Presentation transcript:

UIM, Dec 9, 2008 Criticality and Prioritization of Pipe Rehab Projects Annie Vanrenterghem Raven, Ph.D. Research Associate Professor Polytechnic Institute of NYU

2 UIM, Dec 9, 2008 Assignment Choose best pipes candidates for rehab for the next year (short term) given a certain budget.

3 UIM, Dec 9, 2008 Constraints Several thousands of miles of pipes Limited budget Many criteria to take into account Choices will have to be justified

4 UIM, Dec 9, 2008 Water and Waste Water Rehabilitation Planning Buried Network Buried Non Network Above ground Network Above Ground Non network Water PipesValves; fittings Hydrants; Manholes Plant; Pumping Station Waste Water Sewer Storm Water Storm Drains

5 UIM, Dec 9, 2008 Points of View Points of view: Time: long term and next year/short term Space: whole system; zone; cohort of pipes; pipe level Prioritize or optimize Problems to address: Structural Water quality Hydraulic (adequate pressure)

6 UIM, Dec 9, 2008 Other Points of View Points of view: Time: long term and next year/short term Space: whole system; zone; cohort of pipes; pipe level Prioritize or optimize Problems to address: Structural Water quality Hydraulic (adequate pressure)

7 UIM, Dec 9, 2008 Performance Indicators = Prioritize problems Zones cohorts Long-Term Rehabilitation Planning = Design CIP Based on stock and degradation Hydraulic Criticality and Vulnerability Failure Forecasting = Calculate the probability of failure for each year and each pipe Annual Rehabilitation Planning Macro analysis Input and output data at system, zone or cohort level Micro analysis Input and output data at pipe level The suite of tools

8 UIM, Dec 9, 2008 Overall Context Legal GASB 34; no federal mandate; state or local incentives Physical Assets are ageing; in need of rehab (ASCE report card: D-) Water quality problems, decrease of hydraulic capacity Systems need to grow or shrink Natural Drought situations make leaks and breaks unacceptable Financial Capital needs ( to maintain and replace existing water infrastructure between 2003 and 2023) expected to be $277 billion; up to 2/3 for buried assets. (U.S. EPA, 2005) Gap between projected revenues and expenses Less public funding  Full cost pricing  rate increases Less demand/revenues due to conservation technologies, change in public behavior, current financial crisis.

9 UIM, Dec 9, 2008 Rehab planning: challenges Buried A lot to replace (US: 1M+ mi; LV: 4K mi; NYC: 6K mi) Networks are scattered and ubiquitous; even at most sensitive areas Inspection, repair, replacement expensive and disruptive Degradation/failure/impact unknown or very spectacular…

10 UIM, Dec 9, 2008 Spectacular failure…

11 UIM, Dec 9, 2008 Rehab planning: challenges Multi-problems; multi-disciplinary, complex tasks involving multiple criteria. In the past, rehabilitation decisions have been pragmatic, opportunistic, and difficult to justify. In house DSS attempts; could be quite simplistic (matrix) and erroneous. No comprehensive research in the US. Lack of trust for advanced models (“black boxes”.) Funds are limited but business case of AM is still difficult to make.

12 UIM, Dec 9, 2008 Rehab planning: Challenges with data If data does not exist, it has to be collected. Even simple solutions need data. Data is needed to populate the GIS and the HM, CMMS and AM system. Data collection is expensive. Data should be used for more than having a snap shot of the system at a given time, to set priorities. Prioritization should use the kind of advanced tools (used in other industries) that provide more answers and deal with uncertainty. This can be done at a rather low marginal cost. Added value and function to high price tools such as GIS, HM, CMMS. However the data must meet certain needs.

13 UIM, Dec 9, 2008 Assignment Choose best pipes candidates for rehab for the next year (short term) given a certain budget.

14 UIM, Dec 9, 2008 Annual Rehab Planning Multi-Criteria Decision Making Model (Electre) uses reference profiles to mitigate uncertainty. Criteria express risk (probability x consequences of failure) as well as other relevant points of view. Data is collected at different levels of refining.

15 UIM, Dec 9, 2008 Criterion nameCodeDefinition Coordination with Other Infrastructure Co-ordination Score COS Score [-1,1] Repair Costs Annual Repair Cost ARC ARC(i) = PFR(i) x UCRp(i) Water Loss Water Losses Index WLI Index [0,1] Water Interruptions Predicted Water Interruptions PWI PWI(i) = PFR(i) x EDI(i) x NPS(i) Predicted Critical Water Interruptions PCWI PCWI(i) = PFR(i) x EDI(i) x SC(i) Predicted Frequency of Water Interruptions PFWI PFWI(i) = L (i)/100 x PFR(i) x EDI(i) Damages and Disruptions Damages due to Flooding in Housing areas DFH DFH(i) = PFR(i) x DI^2(i) x P(i) x SFH(i) Damages due to Flooding in Industrial or commercial areas DFI DFI(i) = PFR(i) x DI^2(i) x P(i) x SFI(i) Damages due to Soil Movement DSM DSM(i) = PFR(i) x DI^2(i) x P(i) x LS(i) Traffic Disruption DT DT (i) = PFR(i) x SR(i) Damages and/or Disruption on other Infrastructure DDI DDI(i) = PFR(i) x DI^2(i) x P(i) x SI(i) Water Quality Water Quality Deficiencies WQD Index [0,1] Hydraulic Criticality Hydraulic Criticality Index HCI Index [0,1]

16 UIM, Dec 9, 2008 Criterion name CodeDefinition Coordination with Other Infrastructure Co-ordination Score COS Score [-1,1] Repair Costs Annual Repair Cost ARC ARC(i) = PFR(i) x UCRp(i) Water Loss Water Losses Index WLI Index [0,1] Water Interruptions Predicted Water Interruptions PWI PWI(i) = PFR(i) x EDI(i) x NPS(i) Predicted Critical Water Interruptions PCWI PCWI(i) = PFR(i) x EDI(i) x SC(i) Predicted Frequency of Water Interruptions PFWI PFWI(i) = L (i)/100 x PFR(i) x EDI(i) Damages and Disruptions Damages due to Flooding in Housing areas DFH DFH(i) = PFR(i) x DI^2(i) x P(i) x SFH(i) Damages due to Flooding in Industrial or commercial areas DFI DFI(i) = PFR(i) x DI^2(i) x P(i) x SFI(i) Damages due to Soil Movement DSM DSM(i) = PFR(i) x DI^2(i) x P(i) x LS(i) Traffic Disruption DT DT (i) = PFR(i) x SR(i) Damages and/or Disruption on other Infrastructure DDI DDI(i) = PFR(i) x DI^2(i) x P(i) x SI(i) Water Quality Water Quality Deficiencies WQD Index [0,1] Hydraulic Criticality Hydraulic Criticality Index HCI Index [0,1]

17 UIM, Dec 9, 2008 Criterion nameCodeDefinition Coordination with Other Infrastructure Co-ordination Score COS Score [-1,1] Repair Costs Annual Repair Cost ARC ARC(i) = PFR(i) x UCRp(i) Water Loss Water Losses Index WLI Index [0,1] Water Interruptions Predicted Water Interruptions PWI PWI(i) = PFR(i) x EDI(i) x NPS(i) Predicted Critical Water Interruptions PCWI PCWI(i) = PFR(i) x EDI(i) x SC(i) Predicted Frequency of Water Interruptions PFWI PFWI(i) = L (i)/100 x PFR(i) x EDI(i) Damages and Disruptions Damages due to Flooding in Housing areas DFH DFH(i) = PFR(i) x DI^2(i) x P(i) x SFH(i) Damages due to Flooding in Industrial or commercial areas DFI DFI(i) = PFR(i) x DI^2(i) x P(i) x SFI(i) Damages due to Soil Movement DSM DSM(i) = PFR(i) x DI^2(i) x P(i) x LS(i) Traffic Disruption DT DT (i) = PFR(i) x SR(i) Damages and/or Disruption on other Infrastructure DDI DDI(i) = PFR(i) x DI^2(i) x P(i) x SI(i) Water Quality Water Quality Deficiencies WQD Index [0,1] Hydraulic Criticality Hydraulic Criticality IndexHCIIndex [0,1]

18 UIM, Dec 9, 2008 Criteria, example PWI PWI(i) = PFR(i) x EDI(i) x NPS(i) Units: (No./mile/year) x (hours) x (persons) With: PFR (i) Predicted Failure Rate for pipe i (No./mile/year) EDI (i) Expected Duration of Interruption (hours) NPS (i) Number of Customers Supplied by pipe (i) (or by all pipes that will be affected by the interruption of service; using hydraulic criticality results )

19 UIM, Dec 9, 2008 Criteria, example ARC ARC (i) = PFR (i) x UCRp(i) Units: (No./100m/year) x ($) With : PFR (i) Predicted Failure Rate for pipe i (No./mile/year) UCRp (i) is the Unit Cost of Repair ($)

20 UIM, Dec 9, 2008 Knowledge base, example UCR CodeCostDescription Unknow Diam <12” & easy context Diam <12” & normal context or Diam >12” & easy context Diam >12” & normal context or Diam <12” & difficult context Diam >12” difficult context

21 UIM, Dec 9, 2008 Weights, example

22 UIM, Dec 9, 2008 The reference profiles (electre)

23 UIM, Dec 9, 2008 Dealing with uncertainty (electre)

24 UIM, Dec 9, 2008 The categories C33: Pipes with highest priority level. Pipes have been assigned to C3 according to both OP and PP. C32 (or C31): No consensus among criteria may be due to incomparability. C31, C22, C21, C11: low and moderate performance deficiencies.

25 UIM, Dec 9, 2008 Annual Rehab Planning Categories

26 UIM, Dec 9, 2008 Annual Rehab Planning results on GIS

27 UIM, Dec 9, 2008 Performance Indicators = Prioritize problems Zones cohorts Long-Term Rehabilitation Planning = Design CIP Based on stock and degradation Hydraulic Criticality and Vulnerability Failure Forecasting = Calculate the probability of failure for each year and each pipe Annual Rehabilitation Planning Macro analysis Input and output data at system, zone or cohort level Micro analysis Input and output data at pipe level The suite of tools

28 UIM, Dec 9, 2008 Failure Forecasting Hydraulic criticality FF = Calculate Probability of each pipe for each year (PHM, LEYP) Hydraulic criticality and vulnerability Effect of one pipe being out of service on delivery of service in rest of system Effect of each pipe being out of service on one specific pipe 2 pipes being out of service

29 UIM, Dec 9, 2008 Performance Indicators Long-Term Rehabilitation Planning Hydraulic Criticality and Vulnerability Failure Forecasting Annual Rehabilitation Planning Macro analysis Input and output data at system, zone or cohort level Micro analysis Input and output data at pipe level Implication of Polytechnic University

30 UIM, Dec 9, 2008 Thank you for your attention!