BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s.

Slides:



Advertisements
Similar presentations
SAME “Meet the Chiefs” Don Erickson, P.E., PMP
Advertisements

BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Portland & Walla Walla Districts Columbia-Snake River System Extended Navigation Lock Outage.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
U. S. Army Corps Of Engineers Memphis District November 16, 2007.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Winter Leader Conference February 4, 2009 “ Building Strong “1 The FY 2011 CW Program Mr. Pete Luisa 1 March 2010 PNWA.
Corps of Engineers BUILDING STRONG ® TABLE ROCK DAM SLIDE – CASE STUDY Dave Paul, P.E. Lead Civil Engineer U.S. Army Corps of Engineers Risk Management.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers (USACE) South Pacific Albuquerque (SPA) Daniel Curado Small Business Deputy Albuquerque.
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop April 2006 Mel Price – Auxiliary.
US Army Corps of Engineers BUILDING STRONG ® Military Programs Overview Russ Boyd, RA Chief, Reserve Project Management Branch Louisville District 04 February.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
Office of Small Business Programs
Southwestern Division
Corps of Engineers BUILDING STRONG ® Dam Safety Overview Robert Taylor, P.E. Regional Dam Safety Program Manager U.S. Army Corps of Engineers Great Lakes.
US Army Corps of Engineers BUILDING STRONG ® USACE Status: Metro East Levees September 21, 2011.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Small and Large Business Federal Opportunities Meet the Chiefs Workshop June 3, 2015.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA.
Tulsa District – Building Strong! Overview and Opportunities U.S. Army Corps of Engineers Tulsa District April 29, 2009.
SAME “Meet the Chiefs” LTC Shawn Patrick Deputy Commander
BUILDING STRONG ® SAME San Antonio Post Small Business Conference John Roberts Deputy District Engineer for Project Management Tulsa District July 26,
BUILDING STRONG ® US Army Corps of Engineers – Norfolk District SAME Industry Day Richard Klein Chief, Programs Branch Norfolk District 21 October 2010.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District SAME 21 June 2011 David A. Caldwell, Lieutenant Colonel Commander and District Engineer.
Matt Schueler Civil Project Management & Programs
The Louisville Engineer District BUILDING STRONG ® Military Program Overview Louisville District Rick Lotz Chief, Fort Campbell Support Section July 31,
MOBILE/SAVANNAH DISTRICTS
US Army Corps of Engineers BUILDING STRONG ® NC WATER RESOURCE CONGRESS ANNUAL RALEIGH MEETING Jim Medlock Chief, Programs Management Branch Wilmington.
Society of American Military Engineers - Northern Virginia
BUILDING STRONG ® Fort Worth District Carolyn Staten USACE-SWF-Fort Worth, Texas Deputy Office of Small Business Programs 5 th Annual Business Conference.
US Army Corps of Engineers Omaha District Centers of Standardization Douglas Wehring Omaha District U.S. Army Corps of Engineers Douglas Wehring Omaha.
BUILDING STRONG SM Presentation to Society of American Military Engineers Arkansas Post St. Louis District Program Overview BY Michael G. Feldmann Assistant.
One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.
Slide 1 Memphis District Colonel Thomas Smith Jean Todd, Chief Contracting Karen Brady, SB Office Memphis District Colonel Thomas Smith Jean Todd, Chief.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
FY13 Wastewater Treatment Plant Joint Base Lewis-McChord, WA
VALUE ENGINEERING FORT BLISS, TX MILCON Transformation A Strategy to Support Army Basing Initiatives Jack Shelton PE, CCE Cost Engineer/Value Engineer.
Presentation to the Little Rock SAME Small Business Symposium by LTC Mark Jernigan Deputy Commander, New Orleans District April 28, 2009 Presentation to.
US Army Corps of Engineers Great Lakes & Ohio River Division US Army Corps of Engineers Great Lakes & Ohio River Division Achieving Navigation Systems.
Winter Leader Conference February 4, 2009 “ Building Strong “1 Budgets and Appropriations: Restoring our Infrastructure Budgets and Appropriations: Restoring.
BUILDING STRONG ® Value Methodology Applied to Levee Repairs Missouri River Basin 2011 Flood Repairs.
Seattle District MILITARY CONSTRUCTION PROGRAM
US Army Corps of Engineers BUILDING STRONG ® SAME Jacksonville Post – FY 15 Industry Forum – UNF University Center – 9 Dec 2015 LTC Humberto Boppell Mobile.
1 Coal Handling & Storage Conference 2015 Paul Rohde, Vice President Waterways Council, Inc.
BUILDING STRONG ® Bob Morris, CESWF-PM, 15 Aug 2013 Programs & Opportunities: Fort Worth District LTC Neil Craig Deputy Commander Fort Worth District Society.
US Army Corps of Engineers BUILDING STRONG ® Inter-Agency Water Management Conference Michael Biggs, PE, CFM Matthew Moix, PE Hydraulics & Technical Services.
Educational Activities about the Upper Mississippi River Angela Freyermuth US Army Corps of Engineers, Rock Island District.
Charleston District US Army Corps of Engineers BUILDING STRONG ® 2016 SAME Savannah Post Annual Program Review.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Louisville District Overview
2016 SAME Jacksonville Post Industry Day 8 Dec 2016
SAME Savannah Post Industry Day 14 June 2017
USACE SAVANNAH SAME PRESENTATION
USACE SAVANNAH SAME PRESENTATION
SAME Industry Day Richard Klein BUILDING STRONG®
USACE-Fort Worth District
Army Major Command OSBP Contacts
2017 Huntsville Center Industry day - 18 Oct 2017 Huntsville, alabama
Presented by: Sandra Easter
Louisville District IDIQ Forecast
Louisville District IDIQ Forecast
Louisville District IDIQ Forecast
Louisville District IDIQ Opportunities
Louisville District IDIQ Forecast
U. S. Army Corps of Engineers,
Challenges and Opportunities in Addressing Climate Change
Society of Military Engineers Monthly Meeting, October 11, 2018
Doing Business with the Army Corps of Engineers, Rock Island District
Presentation transcript:

BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s FY09 Workload Mark Milholland Chief, Programs and Project Management Div April 28 – 29, 2009

BUILDING STRONG SM Agenda (Overview of Little Rock District Projected Work)  FY09 Stimulus Types of Work  FY09 Supplemental Funded Projects  FY09 MILCON Projects  FY09 Support for Others Projects (VA)  FY09 Civil Works Projects (GI and CAP)  FY09 O&M Projects (CW)  Questions and Answers

BUILDING STRONG SM

FY09 Economic Stimulus Dept of Defense (Civil) Dept of the Army Corps of Engineers  $4.6B will be provided to USACE  Specific criteria in allocation of funds  Usage of funds Investigations Construction MS River and Tributaries O&M Regulatory Remedial Action Program Flood Control/Costal Emergencies

BUILDING STRONG SM  SWL is assessing the entire program to identify projects that could qualify for the stimulus:  Projects to be obligated/executed quickly  Projects that can be executed with little schedule risk  Projects that will result in high/immediate employment  Projects that will complete either a project phase or the project FY09 Economic Stimulus

BUILDING STRONG SM FY09 Supplemental Funded Projects Project (and Location) Advertise Cost Date Range Park Various Locations 3 rd /4 th Qtr cost varies Trash Nimrod Lake 4 th Qtr $100k - $250k Trash Rack – Debris Ozark 3 rd Qtr up to $100k Emergency Pump Dardanelle 3 rd Qtr $250k - $500k Repairs of Office Building, Table Rock 3 rd Qtr up to $100k AR-White/Jim Smith Repairs 3 rd Qtr $1M - $5M

BUILDING STRONG SM Project Location Advertise Date Cost Range AD/AL Fitness Center Goodfellow AFB 3 rd Qtr $5M-$10M Student Activity Ctr/Lib Laughlin AFB 3 rd Qtr $5M-$10M MATOC Ft. Polk 3 rd Qtr up to $125M Education Center LRAFB 3 rd Qtr over $10M (Bomb Storage Infra Pine Bluff Arsenal 1st Qtr of FY10 over $10M) (Flight Simulator Add LRAFB 1st Qtr of FY10 $5M-$10M) FY09 MILCON Projects

BUILDING STRONG SM FY09 Civil Works and Support for Others Civil Works: Project Location Advertise Cost Date Range Grassy Lake Ecosystem (A-E)4 th Qtr up to $50k Highway 58, Guion, AR4 th Qtr $500k - $1M Support for Others: Project Location Advertise Cost Date Range VA MATCO (Design-Build) AR, TX, OK & MS 4 th Qtr up to $350M

BUILDING STRONG SM Project Location Advertise Cost DateRange Hardin Void Investigation (Core Drilling) 3 rd Qtr up to $500k MCC Panels Locks #4, #5 and #6 3 rd Qtr up to $500k Paint/Rehab Tainter Murray Lock #7 2 nd Qtr $1M - $5M Replacement of Bulkhead Structure, Greers Ferry 2 nd Qtr $1M - $5M Rehab/Paint Bridge Superstructure, Bull Shoals 3 rd Qtr $1M - $5M Stop Logs and Lifting Beams, MKARNS3 rd Qtr $100k-$250k Construct Intake System, Clearwater Lake3 rd Qtr $100k-$250k MCC Panels Lock #12 (Ozark-Jeta Taylor) 3 rd Qtr $100k-$250k Various Mowing and Landscape Service3 rd /4 th Qtr $250k -$1M Various Park Cleanup and Attendant Services 3rd/4th Qtr $250k -$1M Various Janitorial Services3rd/4th Qtr $250k -$1M Emergency Generator, Ozark4 th Qtr $5M - $10M FY09 O&M Projects

BUILDING STRONG SM Questions ???