March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63.

Slides:



Advertisements
Similar presentations
ADX 150 – Engine Repair ADX 170 – Climate Controls
Advertisements

Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Hydronic Mechanical Controls
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Section 3 Using Heat.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
TT2A Mercury Jet Experiment The Cryogenic System Roger Bennett and Yury Ivanyushenkov CCLRC, Rutherford Appleton laboratory, Chilto, Didcot, Oxon, OX11.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
UITF ODH Assessment UITF Safety Review May 10, 2016.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Final Design Cryogenic and mechanical configurations
LCLS-II Technical Requirements
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Unit 13 Oil-Burning Equipment
2 K Coldbox Safety and ESH
2K Cold Box FDR Introduction
FRIB Cryogenic Support
Cryogenic behavior of the cryogenic system
Status of work on the cryostat design
Cryoplant Installation Scope
SPS cryogenic proximity equipment and SM18 validation
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
LN2 Circuit for MIT Test, September 2005
ILC Experimental Hall Cryogenics An Overview
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Cryogenics – The Basics
Burst Disc Experiences at CEA Test Stand
Presentation transcript:

March 14, 2002GJG NCSX CRYOGENICS DESIGN DEVELOPMENT STATUS WBS-63

March 14, 2002GJG PURPOSE OF STATUS REVIEW Review serves as a design intent checkpoint These concepts will serve as the basis for the upcoming cost and schedule exercise Known requirements for technical design will be presented Approximate schedule for estimate will be discussed

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS PBX-M (ORNL) beamline’s dewar hookup: 1.LN 2 & LHe Transfer Lines 2.Control Valves & Misc. Elements

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS PPPL care taking staff has carefully removed and stored the transfer lines, valves, etc. Upcoming effort will remove and retain: 1.Twin bayonet heads 2.LN 2 -traced LHe rigid lines 1. 2.

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS The 9,000 gallon LN 2 tank is in service and will soon support the Hall Thruster Project at less than 200 gallons per day The NCSX heat load (updated 3/13/02) is about 6,000 gallons (one trailer) per plasma day This tank is fine!

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS Helium Dewar Shed: The PBX-M implementation of the ORNL beams featured a once-through, then vent to atmosphere LHe system. NCSX should use the same approach. A 1000 gallon portable dewar is forked from the vendor’s trailer and moved through the overhead door.

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS The shed is past due for corrosion control and paint. The dewar scale (mandatory for ops) requires rehab or replacement Dewar Scale Assembly

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS The LHe spear, hose, and phase separator are in serviceable condition. Some new seals and start-up labor will be required.

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS This is an example of LN 2 -traced LHe cryo line and is very similar to the lines in the PBX-M area.

March 14, 2002GJG NCSX SITE EQUIPMENT STATUS Unfortunate conflict: The service entrance and main “tee”for the LN 2 -traced LHe rigid lines rests on the soon- to-be-dismantled north shield wall

March 14, 2002GJG SIMPLIFIED LIQUID CRYOGEN DISTRIBUTION N.C. Alarm Response Valve LN2 Dewar Skid Mount LHe Dewar Cryostat & Field Coil Beamline #1Beamline #2Beamline #3Beamline #4 Vent to High Bay Vent to Stack

March 14, 2002GJG SIMPLIFIED LN 2 FIELD COIL COOLING SUPPLY Hermetic Suction/Expansion Tank Field Coil Flow Paths 15 lpm P P FIELD COIL HEAT EXCHANGER CLOSED, PRESSURIZED PRIMARY OPEN, BOILING SECONDARY PX TX.36 MPa (52 psia) For 90 K Ops P LN2 MAKEUP

March 14, 2002GJG SIMPLIFIED GN 2 CRYOSTAT COOLING SUPPLY NCSX PXTXPX FIELD COIL HEAT EXCHANGER CLOSED, PRESSURIZED PRIMARY OPEN, BOILING SECONDARY PITOT/STATIC ASS’YSUPPLY TEMPDIFF PRESS TO ATM OUTSIDE BUILDING RESISTIVE HEATER PX PITOT/STATIC ASS’Y M M LN2 SUPPLY OUTDOOR VENT (SAFETY) STACK RESISTIVE HEATER

March 14, 2002GJG WBS-63 REQUIREMENTS Vent effluent gases without personnel injury Survive worst probable indoor liquid spill without personnel injury Deliver about 6000 LN 2 gal/day to cryostat, field coil cooling, and beam pumps Deliver about 200 liters/day LHe to beam pumps for PBX-M-style beam ops

March 14, 2002GJG WBS-63 REQUIREMENTS, CONTINUED Remove 6E7 kJ/pulse from field coils at ABOUT a flow rate of 15 l/s and pressure drop of 1.4 MPa to support a 15 minute machine cycle. Circulate warming and cooling GN 2 around machine at *** kg/sec (pressure drop?) to support a thermal cycle of time of *** hours (days?)

March 14, 2002GJG INTERFACE CONTROL - WHO HAS THE WBS BALL? WHO PAYS? Oxygen Level Monitors – Multiple Locations N 2 /Air Exchange Emergency Blower –Changes Air in TC VERY Quickly –Needs Review, Maybe Not Necessary (NC valve?) Magnet Coolant Flow Monitoring Magnet Flow Balancing Valves/Plumbing Cryostat High/Low Pressure Monitor and Control Algorithms High Current 480 VAC circuits