Highway Design Class CTC 440. Introductions Students Me.

Slides:



Advertisements
Similar presentations
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Advertisements

Interactive Highway Safety Design Model (IHSDM)
Lec 33, Ch.5, pp : Accident reduction capabilities and effectiveness of safety design features (Objectives) Learn what’s involved in safety engineering.
Hardin County Engineering Department September 12, 2006.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Re-Design Of Nablus-Deir Sharaf Road Prepared by Enas Saleh Haneen Hetti Supervisor Prof.Sameer Abu-Eisheh.
AASHTO Subcommittee on Design Reducing Engineering Standards: Good or Bad? July 14, 2008 Marc Cote, P.E. (302) /14/08.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
AASHTO Subcommittee on Design Meeting June 10, 2004 NCHRP Project 3-69 Design of Construction Work Zones on High-Speed Highways Kevin M. Mahoney Penn State.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
What Makes a Roadway Safe? ISLAND COUNTY PUBLIC WORKS DEPARTMENT Press key to advance this display.
Capacity Analysis CE 453 Lecture #14.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
At-Grade Intersection
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
Other Design Consideration TS 4447: Highway Geometric Design.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Safety Audit Components Safety assessment for risk Management.
Chapter 8 Plot Plans.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Road Design.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Section 4 ELEMENTS OF DESIGN Sight Distance and Vertical Alignment
Lecture Six Radu ANDREI, PhD, P.E., Professor of Civil Engineering
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
1 Development of countermeasures Hossein Naraghi CE 590 Special Topics Safety March 2003 Time Spent: 6 hrs.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Evaluating Remotely Sensed Images For Use In Inventorying Roadway Infrastructure Features N C R S T INFRASTRUCTURE.
Jason Chapman Data Collection & Management Systems.
Civil Engineering Department Design of Nablus Tulkarm Highway Prepared by Ahmed Mohammed Mustafa Anas Zeyad Belbeasi Under the Supervision of Dr. Khaled.
4. GEOMETRIC DESIGN OF HIGHWAYS
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Phase 2: 30% Design Plans September 4 th, 2012.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Safety Audit Planned Project - Preliminary Design zGeneral Project Data yProject layout xRoad function Determine the road function. What kind of traffic.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Introduction CE331 Transportation Engineering Fall 2013 Dr. Reg Souleyrette.
Road Safety Audits Road School, 2011 Rick Drumm, P.E. Safety Engineer Federal Highway Administration.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Highway Alignment And Geometric Design
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Importance of Geometric Design
Highway Geometric Design Combination of Vertical and Horizontal Alignment.
Highway Design Class CTC 440.
Technical Committee on Geometric Design
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
S.R. 26 Road Rehabilitation in Clinton County
3R Standards Resurfacing, Restoration, & Rehabilitation Note: Need to update based on revisions to Ch 7 of HDM (freeway and non-freeway now covered in.
School of Civil Engineering
Design Speed, Operating Speed, and Posted Speed Limit Practices
Walker Street Reconstruction Project 25% Design Public Hearing
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

Highway Design Class CTC 440

Introductions Students Me

Class Basics Syllabus Tentative Schedule Lectures Labs Grades (PIN #’s)

Ch 5 of HDM: Basic Design Designing a section of highway is similar to designing a house Lots of little decisions along the way that impact the end product

Some Basic Elements Capacity/Level of Service Accident Analysis Terrain Data Requirements Right-of-Way Construction Cost Estimates Design Elements Design Considerations Intersections at Grade

Capacity / Level of Service Capacity analysis is used to estimate the traffic-carrying ability of existing and proposed traffic (LOS) is a qualitative measure used to describe the operational conditions within a traffic stream – driver’s viewpoint A (best) F (failure) LOS C – desirable; LOS D acceptable

Accident Analysis – Identify problems and incorporate countermeasures Collect data Determine accident rate and compare to statewide avg. Identify locational clusters Identify nonstandard or nonconforming features PIL/PII (priority investigation list/intersection) Utility Pole “bad actors”

Terrain Data Requirements Obtained via photogrammetry &/or field survey Base Mapping (horizontal) Edge of pavements, shoulders, sidewalks Buildings, fences, trees, tree lines Rock outcrops Utilities-lines, valves, manholes Streams, creeks Topography (vertical) DTM – digital terrain models Used for contours and cut cross-sections

Right of Way Amt. of land needed ARM-abstract request map ROW plan Power of eminent domain Types Fee, w/ access or w/o access PE (permanent easement) TE (temporary easement) TO (temporary occupancy, <$2500, minor grading/ditching) Entrance, approach, or driveway work release (no compensation General work release (no compensation)

Construction Cost Estimates Prepared throughout project life Ballpark (+/-50%) Preliminary (+/-20%) PEP (preliminary estimate program) or MEANS Detailed (+/-5%) PES (preliminary estimating system) or MEANS Economic Analysis Bridge rehab vs replacement Bridge abandonment vs preservation Pavt. Rehab options Accident reduction treatments Mobility betterment

Design Elements Design Vehicle Sight Distance Horizontal and Vertical Alignment Superelevation Climbing or emergency escape lanes Clear Zone Vertical and Horizontal Clearance Parking lanes, driveways Lane drops, medians Frontage roads HOV lanes, bus stops/turnouts/turnarounds

Design Considerations Joint Use of Highway (peds/bikes/utilities/transit) Driver Expectancy Geometric Considerations Noise Abatement Increase capacity w/o addl. Lanes ITS Ramp Metering Reversible-flow lanes Shoulders as traffic lanes HOV priority treatment

Intersections at Grade Use HCM to determine LOS/Capacity Intersection Geometries Angle (skew < 30 deg) Channelization/pavt width/radii Other Considerations Sight distance/access control signalization Medians Flush or Raised Median Openings

Highway Stuff 2007 Minneapolis Bridge Collapse Bolivia Road