COMPGZ07 Project Management Risk Management Graham Collins, UCL

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
A Joint Code of Practice Objectives and Summary Presentation
PROJECT RISK MANAGEMENT
IMFO Audit & Risk Indaba June 2012
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
Risk Analysis & Management. Phases Initial Risk Assessment Risk Analysis Risk Management and Mitigation.
Supporting people with a learning disability Introduction to Project Management Presenter: Steve Raw FInstLM, FCMI.
Chapter 7: Managing Risk
CEVP ® Cost Estimate Validation Process TEA Conference 2004 Jay Drye, P.E. Assistant State Design Engineer Monica Bielenberg, P.E. CREM Program Manager.
R R R CSE870: Advanced Software Engineering (Cheng): Intro to Software Engineering1 Advanced Software Engineering Dr. Cheng Overview of Software Engineering.
Project Risk Management
Computer Engineering 203 R Smith Risk Management 7/ Risk Management The future can never be predicted with 100% accuracy. Failure to plan for risks.
Session 33 Guest Speaker: Gini Van Siclen. Risk Management for Project Managers Gini Van Siclen.
Managing Project Risk.
Software Project Risk Management
Project Risk Management Risk Mitigation. Risk Management  The prime objective of risk management is to minimize the impact and probability of the occurrence.
Risk Management. What is risk? You have some expected outcome –Of some event in the future Risk is the deviation of the actual future outcome from the.
Project Risk Management. Learning Objectives  Understand what risk is and the importance of good project risk management.  Identify project risks, describe.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
PMI Knowledge Areas Risk Management.
COMPGZ07 Project Management Presentations Graham Collins, UCL
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Chapter 10 Contemporary Project Management Kloppenborg
HIT241 - RISK MANAGEMENT Introduction
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
Linac4 Risk Assessment Criteria and Methodology. Linac4 General Meeting – C. Rossi Definitions A risk is any event that could produce a change.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Software Engineering Process - II 3.1 Unit 3: Risk Management Software Engineering Process - II.
Risk planning & risk management (RM)
Risk Management for Technology Projects Geography 463 : GIS Workshop May
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
Project Management By: Dr Madhu Fernando Project Risk Management
Project Management Office (PMO) Technical Risk Workshop Wendy Collidge.
1 TenStep Project Management Process ™ PM00.7 PM00.7 Project Management Preparation for Success * Manage Risk *
Risk Management in the Built Environment Qualitative and Quantitative Risk Management By Professor Simon Burtonshaw-Gunn – licensed under the Creative.
Software Project Management
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
© 2008 Prentice Hall9-1 Introduction to Project Management Chapter 9 Managing Project Risk Information Systems Project Management: A Process and Team Approach,
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Information Technology Project Management Managing IT Project Risk.
Introduction to Project Management Chapter 9 Managing Project Risk
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
COMPGZ07 Project Management CMMI Project Planning Lecture 5b Graham Collins, UCL.
IB Business & Management
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
Project Risk Management Planning Division of Project Management November 2003.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
Chapter 11: Project Risk Management
ITPD ISSUE MANAGEMENT PROCESS SEPTEMBER 5, 2008
Risk Adjusted Project Schedules
Project Risk Analysis and Management: L3
Program & Project Risks and Reporting with Oracle Primavera Cloud
Presentation transcript:

COMPGZ07 Project Management Risk Management Graham Collins, UCL graham.collins@ucl.ac.uk

Risks mentioned Lack of appropriate communication to client Lack of ‘buy-in’ Delivering the project, on time on budget to the required performance can still result in the project being considered a failure Scope creep, the project may be delayed and over budget Lack of understanding of the requirements, how the work fits into the wider picture (WBS) or how this links into the process (the series of linked development stages) or life-cycle, the main phases of the project Lack of understanding of progress Lack of understanding of capability, the individual, team or the organisation Sometimes it is useful to categorise risks using a framework mentioned PESTEL, otherwise categories of risks may be ignored As with metrics, it is useful to keep data and discuss in a review session.

Discounting future performance measures Poor communication Lack of technical understanding Intrinsic uncertainty Different interpretations Different assumptions Multitude of variables Problem compounded by linking to options

Plotting V as a function of D 2000 D, the real discount rate 2 4 6 -2000 V, the value of deferral less proceed now cash flows deferral is the preferred choice proceed now is the preferred choice -8 000 Uncertainty about cash flows can be examined using sensitivity analysis on a few key variables -10 000 Based on Chris Chapman & Stephen Ward, Managing Project Risk and Uncertainty: A Constructively Simple Approach to Decision Making, John Wiley 2002.

M_o_R Strategic framework for the Management of Risk Define a framework Identify the risks Embed and review Identify probable risk owners Gain assurances about effectiveness Evaluate the risks Implement responses Set acceptable levels of risk tolerance Identify suitable responses to risk Based on: Management of Risk: Guidance for Practitioners, OGC, HMSO,2002 originally adapted from the HM Treasury Orange Book

Definitions from M_o_R Risk - uncertainty of outcome (whether a positive or negative threat). It is the combination of the chance of an event and its consequences Risk management – the task of ensuring that the organisation makes cost effective use of a risk process. Risk management requires: processes in place to monitor risks; access to reliable up to date information about risk; the right balance of control in place to deal with those risks; decision making processes supported by a framework of risk analysis and evaluation. Risk register – a product used to maintain information on all the identified risks pertaining to a particular activity (project or programme) Risk appetite – the amount of risk the organisation is prepared to tolerate (be exposed to) at any point in time.

Risk Management - Stages Risk awareness Risk identification Risk owner identification Qualitative assessment Quantification of probability Quantification of impact (severity) Exposure rating Mitigation Contingency provision Risk register Software usage (if any) Monitoring and reporting Based on Albert Lester, Project Planning and Control, third edition, Butterworth-Heinemann, 2000

Risk Profile Models The project profile model www.ogc.gov.uk H Risk tolerance line Unacceptable risks M Probability Acceptable risks Typically this grid incorporates, categories VL and VH on both scales L L M H Impact (effect)

Status flags Status flags may also be used. Identified in terms of red/amber/green (or RAG status) The use of RAG status can be useful for incorporating the status reporting from risk registers into the risk profiles Measure of risk RAG status, reflects the level of exposure that the risk represents to the project Action RAG status, reflects the effectiveness of the action applied to the risk.

Risk register Project: ……………………………….. Key: H – High; M – Medium; L - Low Reference: ………..... Date: ………………… Prepared by: …………….. Type of Risk Description of Risk Probability Impact Risk reduction strategy Contingency plans Risk owner H M L Perf. Cost Time Based on A. Lester, ibid. Other categories could be added i.e. trigger, (which would be synonymous to input in a process diagram) or proximity indicating which phase the risk is likely to occur.

Solar heating exercise Please work in pairs You are the owner of a semi-detached house (your partner in the exercise owns the adjacent property) You decide to replace part of the roof with solar panels to save on your hot water heating bill. Identify the risks involved in this project, and ways in which you could manage each of these risks. I hope to display some of your ideas for the class to discuss, after 10 minutes.

Risk Management Risk Probability Impact Insufficient number of skilled OO developers H Demo not ready for OOP conference Munich M Then develop a management plan on wall, ie risk, actions, owner, status

Visible models Risk … Actions Owner Status Insufficient number of skilled object-oriented developers; thus slow development and poor design Proactive Hire temporary consultants Design and program in pairs Classroom education and mentoring The key concept is to keep the models such as the risk register (here it is the risk list with associated actions and status) as visible as possible, using whiteboards on the wall of the project room, and then transfer via digital camera to a Wiki web-page (project web-page).

Personal view Shared responsibility for risk i.e. the team are responsible for risk reporting (as well as joint planning, estimating, reporting progress and sharing the rewards). Where possible teams of two are not only involved in co-development (pair programming) but also keeping track of each others progress in a supportive manner as well as tracking risks specific to their tasks as well as the risks they have volunteered to own. (In addition effort is sometimes placed on identification of risks which are then not adequately tracked and managed. Another area that is important is that risk often cannot easily be quantified, they often have a profile, hence Monte Carlo software simulations are important for understanding and interpreting risks.)

Environment Continuous integration Project Wiki webs Reverse engineering- Somatik Caves, walls, digital technology

Risk Concept Map for Euro changeover project Planned branch opening times may be impacted Bank customer dissatisfaction R1 R2 Demand will be unusually high Banks could run out of cash in certain areas Risk of litigation Replacement may be a problem Risk of mis-dispense if notes not robust Changeover is in a holiday period On premise storage R2 Risk number related to register Risk situation Impact Risk driver Assumption Potential for help desk call surge Potential widespread ATM downtime Based on a NCR project, Euro changeover project for automated teller machines, John Barlett, Managing Risk for Projects and Programmes, Project Manager Today, 2002