Project Design and Planning

Slides:



Advertisements
Similar presentations
Developing a Balanced Score Card Session 1 Viki Massey, Quality Coordinator A Joint Venture of London Health Sciences Centre and St. Josephs Health Care.
Advertisements

what is it and why do we use it?
Problem Solving.
5.1.2 Situative Planning 1 Situative Planning - A Strategic Approach to Urban Planning UPA Package 5, Module 1.
Productivity: the Key to Increasing a Country’s Income
5.4.2 Problem and Potential Analysis 1 Problem and Potential Analysis UPA Package 5, Module 4.
Organic Foods A better option?. Have you ever found yourself debating whether to buy organic food versus conventionally grown foods?
Training on Project Development and Management
Project Cycle Management (PCM)
TRP Chapter Chapter 1.1 Introduction. TRP Chapter Why raise hazardous waste management standards? To reduce risks of inadequate controls on.
IS550: Software requirements engineering Dr. Azeddine Chikh 4. Validation and management.
Ev Session 4 Problem Analysis and Solution Analysis Project for Capacity Development to Implementing Organic Law at the Capital and Provincial Level (PILAC.
Conceptual Design Assessments and Analysis We would like to acknowledge the support of the Project Management Institute and the International Institute.
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
IRRIGATION SECTOR IN KENYA- STATUS AND CHALLENGES “PAPER PRESENTED DURING THE “GREEN WATER CREDITS WORKSHOP” KARI HQ NAIROBI, OCTOBER 2006” E. D.
The participants should have understood the following basic principles: Integrating gender considerations into project design and implementation Assessing.
The SWHISA approach to extension:. The SWHISA approach extension:  participatory, farmer led,  open-ended and interactive relationship among farm families,
CASE STUDIES IN PROJECT MANAGEMENT
Role and Components of Project Evaluation
IRRIGATION DEVELOPMENT IN KENYA
Objective- and Strategic Analysis
LOGICAL FRAMEWORK Jürgen Carls University for Peace
1 APPEARING BEFORE THE MENTAL HEALTH TRIBUNAL. 2 Index The Provisions of the Act relating to Tribunal hearings3 – 6 What is Evidence 7 Section 24 Continuing.
Objective-Oriented Project Planning (ZOPP)
The Targeting Outcomes of Programs (TOP) framework.
Session 11 Table of C/P Development Framework Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC.
A GENERIC PROCESS FOR REQUIREMENTS ENGINEERING Chapter 2 1 These slides are prepared by Enas Naffar to be used in Software requirements course - Philadelphia.
Writing a Problem Solution Essay. Analyzing the Problem Explore What You Know About the Problem. Figure out what you know now about the problem and what.
MOD 6050 PROJECT MANAGEMENT AND FUND RAISING TOPIC – PROPOSAL WRITING AND FUNDRAISING (WK 6 &8) LECTURER: DR. G. O. K’AOL.
Module 1 Session 1.3 Visual 1 Module 1 Understanding the Project and Project Management Session 1.3The Project Preparation/Analysis Process and the Hierarchy.
10/18/20151 Coordination and Partnership is the management of interdependencies between activities 10/18/20152.
Mastewal Yami Post Doctoral Fellow: Social and Institutional Scientist Challenges to Investment in Irrigation in Ethiopia: Lessons.
 Charles J. Kachmar. Drafting is a graphic language having its own alphabet and grammar. It requires visualization and implementation Two main classes.
MT209 Small Business Management Unit 9 – Managing Business Risk.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
RD Lasco ICRAF1 TRADEOFF ANALYSIS OF ADAPTATION STRATEGIES IN THE PHILIPPINES RD Lasco 1 R.V.O. Cruz 2, J.M. Pulhin 2, F.B. Pulhin 2 1 World Agroforestry.
Participatory Planning Project Cycle Management (PCM)
UK Aid Direct Introduction to Logframes (only required at proposal stage)
Project Management Learning Program July 2008, Mekong Institute, Khon Kaen, Thailand Project Design and Planning Sequence of Systematic Project Design.
STEP 1: Collecting, Organizing, & Analyzing School Data STEP 2: Identifying Core Values, Crafting the School’s Vision, Mission STEP 3: Determining School.
INEA Ecological Gardens School at the University of Valladolid and the City council of Valladolid A highly regarded experience.
Use Case Model Use case diagram.
Use Case Model Use case diagram. Relevant Requirements Artifacts Use-Case Model Supplementary Specification Use-Case Specifications... Glossary Actors.
1 An introduction to Project Cycle Management PCM DAY 1 Gori, 31/3 – 3/4/2015.
Project Management Learning Program July 2008, Mekong Institute, Khon Kaen, Thailand Project Design and Planning Sequence of Systematic Project Design.
3.1 Participatory Design. WHY PARTICIPATORY DESIGN?  To understand and agree priorities and make the best design for the system accordingly  To tap.
DEVELOPING THE WORK PLAN
Stakeholder Analysis Assoc. Prof. Dr. Wongsa Laohasiriwong Khon Kaen University.
Development Project Management Learning Program May 21 – June 1, 2012, Mekong Institute, Khon Kaen, Thailand Project Design and Planning Sequence of Systematic.
Collecting, Organizing and Analyzing School Data Formulating School’s Core Values, Vision, and Mission Identifying School Develop- ment Objectives Formulating.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
PPA 502 – Lecture 9b How to Communicate Evaluation Findings.
The Engineering Design Process
Logical Framework Approach An Evaluation Toolbox Presentation
Objectives of the session
Introduction to SANREM / SMARTS Project A University of Hawaii/OUAT Collaboration, March 2011 prepared by Jacqueline Halbrendt, MS J. Halbrendt, T. Idol,
Module 2: Conceptual Design (Part 1) - Assessments and Analysis We would like to acknowledge the support of the Project Management Institute and the International.
Assessment/Evaluation Make evaluation a central part of planning – not an afterthought 1) Determine Needs 2) Determine Desired Outcomes 3) Determine Activities.
Office of Overseas Programming & Training Support (OPATS) Environment Community Engagement— Environmental Education and the Design for Behavior Change.
Session III: Objective Tree Analysis
Unit 19 Modern Agriculture.
Module 2 Basic Concepts.
GAJWANI SCHOOLS & COLLEGES
Developing CBC project ideas
Use Case Model Use case diagram.
Developing a Balanced Score Card Session 1
THE UNITED REPUBLIC OF TANZANIA
Problem Analysis How to Identify the Focal Problem
Project Design and Planning
Civil Society Facility and Media Programme Call for proposals: EuropeAid/162473/DH/ACT/Multi Webinar no. 3: Preparing effective Concept Note.
Presentation transcript:

Project Design and Planning Sequence of Systematic Project Design http://www.mekonginstitute.org/ 1

The sequence of Objectives-Oriented Project Planning (OOPP) Problem Analysis Participants Anal. Objectives Analysis Alternatives Analysis 1. 2. 3. Log. Framework Plan of Operations http://www.mekonginstitute.org/ 2

Visualization in Participatory Project Planning (VIPP) Make your plan: Visible Readable Changeable Movable http://www.mekonginstitute.org/ 3

PCM Workshop-House Rules Write your own idea on a card. Write only one idea on a card. Describe in a clear and brief sentence. Stick to the facts, and avoid abstraction and generalizations. Write your ideas on the cards before beginning discussion. Obtain a consensus when removing cards from the board. http://www.mekonginstitute.org/ 4

ANALYSIS STAGE Stakeholders Analysis Problems Analysis Objectives Alternative Analysis PLANNING STAGE PDM Plan of Operation (PO) PDM http://www.mekonginstitute.org/ 5

Analyze existing situation Identify important problems Problem Analysis Analyze existing situation Identify important problems Define core problem Draw cause effect relationship Why? http://www.mekonginstitute.org/ 6

Problem Tree Direct Effects EFFECTS CORE PROBLEM Core Problem CAUSES Direct Causes http://www.mekonginstitute.org/ 7

Rice productivity is low. Example: Problem Tree Household Income decreases. Farmers Have to work long hours. EFFECTS Core Problem Rice productivity is low. CAUSES Arable land is very limited Irrigation system Does not work properly Traditional Farming methods are used.. Main facilities are not well maintained Terminal Facilities Are not well maintained Farmers Do not want To Apply fertilizers Farmers Cannot afford To buy modern equipment http://www.mekonginstitute.org/ 8

Write existing problems only. Write only one problem per card. Tip for Writing Problem Cards Write existing problems only. Write only one problem per card. Describe the problem in a sentence Do not include both the cause and the effect of a problem on one card. Try to avoid expressions such as “No resources is available.” (instead, describe the conditions resulting from the lack or absence of the particular) http://www.mekonginstitute.org/ 9

Exercise 2: Your Problem Tree Generating activities Women cannot be involved in Income Generating activities Core Problem http://www.mekonginstitute.org/ 10

Avoid Prefer Farmers cannot receive appropriate medical treatment There is no hospital Technical skills are inadequate and vehicles are in poor condition Technical skills of train operator are inadequate Vehicles are in poor condition Irrigation system Irrigation system does not work properly http://www.mekonginstitute.org/ 11

Identify future alternatives objective (add if necessary) Objective Analysis Rephrase the problems (negative statements) into objectives (positive statements) Identify future alternatives objective (add if necessary) http://www.mekonginstitute.org/ 12

Step 3: Objectives Analysis A Process to change “cause-effect” relationships that were clarified in the Problem Analysis to “means-ends” relationships that would be attained in the project. Problem Objectives Farmers cannot receive appropriate medical treatment Farmers canreceive appropriate medical treatment Tap water is contaminated with soil residue Tap water has nocontaminated with soil residue Rice productivity Is low Rice productivity increases http://www.mekonginstitute.org/ 13

Objective Tree Negative Positive http://www.mekonginstitute.org/ Ends Effect CORE PROBLEM CORE OBLECTIVE Means Cause http://www.mekonginstitute.org/ 14

Objective Tree <Positive> Problem Tree <Negative> Household Income decrease Household Income increase Farmers ‘s Workload is reduced Farmers have to work long hours. Core Problem Rice Productivity is low Rice Productivity increase Core Objective Arable land is very limited Irrigation system does not work properly Traditional farming methods Are used More arable land is available Irrigation system work properly Modern farming methods are introduced Main facilities are not well maintained Main facilities are well maintained Farmers apply fertilizers Farmers Do not want to apply fertilizers http://www.mekonginstitute.org/ 15

Tips for Writing Objective Cards Describe desirable situations on the cards 2. Confirm the statement whether it is realistic or not. 3. Confirm the statement whether it is feasible or not. 4. Add new cards if necessary. 5. You may not have to rewrite all the problem cards. 6. Do not become an automatic “translation machine” http://www.mekonginstitute.org/ 16

Exercise 3: Your Objective Tree Core Objective http://www.mekonginstitute.org/ 17

Participants/Stakeholder Analysis Identify Key Persons, groups, institutions, organizations, etc. Form categories, beneficiaries, implementers, partners, etc. Analyze the groups Identify consequences of project http://www.mekonginstitute.org/ 18

http://www.mekonginstitute.org/ 19

http://www.mekonginstitute.org/ 20

http://www.mekonginstitute.org/ 21