Jesse Morrow Mountain Mine and Reclamation Project PLANNING COMMISSION HEARING May 30, 2012.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Public Scoping Meeting December 3, 2012
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Proposed Land Use & Development Regulations Public Hearing Month Day, 2012.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Draft Program Environmental Impact Report Public Meeting November 30, 2011.
Oil and Gas Leasing Jim Albano – Lead Natural Resource Specialist Reservoir Management and Operations Section Montana State Office – (406)
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
WATER- “ The Source of Life”  All the water that will ever be is, right now. -National Geographic  Water has become a highly precious resource. There.
California Water Issues and Wetlands
Environmental Assessment August 2012 Oil & Gas Lease Sale.
Drought and the Central Valley Project August 2014.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Town of Hamilton Community Information Meeting For Well Harmony Intermediate School May 13, 2010.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
SKAGIT COUNTY SHORELINE REGULATIONS Planning Commission Workshop April 3, 2012.
Water Supply Planning Initiative State Water Commission November 22, 2004.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Central Valley Flood Protection Board Meeting – Agenda Item No. 4E APPLICATION NO
In 1972 the Kansas Legislature established the Groundwater Management Act that led to the establishment of a total of five (5) local Groundwater Management.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Manure Recycling ACP Compost Solutions Workshop February 28, 2007 John Gundlach Manager of Organics Management Inland Empire Utilities Agency.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Soil Quality Measurement Unit: Soil Science Lesson 7.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Development of a Uinta Basin Oil and Gas Emissions Inventory Suitable for a Model Performance Evaluation Courtney Taylor 1, Caitlin Shaw 1, Chao-Jung Chien.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
The California Environmental Quality Act and Greenhouse Gas Emissions SB97 and the Proposed Amendments to the State CEQA Guidelines on Analyzing Greenhouse.
DEPARTMENT of PUBLIC WORKS and PLANNING DEVELOPMENT SERVICES DIVISION.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
Levy Nuclear Plant Overview of Water Issues Presented by Jamie Hunter to the FDEP – Central District’s 13 th Annual Power Generation Conference Lake Buena.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
1 Completing the CEQA Checklist Terry Rivasplata.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
PM2.5 Working Group Meeting #2 South Coast Air Quality Management District July 11, 2006.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
1 Final Regulation Order for Truck and Bus Regulation California Environmental Protection Agency Air Resources Board November 20, 2014.
APPLICATION NO LEVEE DISTRICT No. 1 Of SUTTER COUNTY STAR BEND SETBACK LEVEE SUTTER COUNTY April 17, 2009.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Jesse Morrow Mountain Mine and Reclamation Project PLANNING COMMISSION HEARING February 9, 2012.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
OPEN SPACE/ CONSERVATION
Scoping Meeting April 20th 6:00 pm
Introduction to the California Environmental Quality Act (CEQA)
NORTH TRUNK SEWER REPLACEMENT PROJECT
TEXAS DROUGHT PLANNING
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
SEQRA as a Tool to Review Energy Projects
Final Environmental Impact Report
Presentation transcript:

Jesse Morrow Mountain Mine and Reclamation Project PLANNING COMMISSION HEARING May 30, 2012

PRESENTATION OVERVIEW Biology Surveys and California Mountain Lion Hydrology: –Loss of Groundwater Recharge and Impact on Groundwater Levels –Groundwater Use During Dry Years and Impact on Groundwater Levels –Blasting Impacts on Wells and Canals –Central Valley Flood Protection Board Comment Letter Air Quality: –NOx Emission Sources and Impact Comparison Between Project and Reduced Alternative 4 –PM Emissions Threshold

PRESENTATION OVERVIEW (cont.) Geology & Soils: –Core Samples –Reduced Alternative 4 Slope Stability Questions

Biological Surveys and California Mountain Lion Biologists conducted five sets of biological surveys between May 2005 and May Literature reviews, state records searches, and map overlay analyses As required by CEQA, the EIR focused on federally or state listed endangered or threatened species. ‒ Mountain lions are not designated as threatened nor endangered in California –“One old dropping, potentially that of a mountain lion was noted on the ridge.” - FEIR, Appendix D-1, p. 2 –“No deer feces were noted on any of the Project area, indicating deer use is transitory and sporadic.” - FEIR Appendix D-1, p. 2 Impacts to mountain lions were not required to be analyzed, unlikely to occur, and therefore were not evaluated.

Hydrology Loss of Groundwater Recharge and Impact on Groundwater Levels: Under normal conditions, approximately 118 acre-feet of runoff retained from the Project areas and used for the Project. Captured runoff for the Project represents less than 20 percent of the total runoff from the western side of Jesse Morrow Mountain. Amount of runoff from the Project area that percolates into the alluvial basin is only a small fraction of the total runoff. Alluvial basin area to the west and southwest of Jesse Morrow Mountain encompasses at least 5,000 acres.

Hydrology (cont.) Loss of Groundwater Recharge and Impact on Groundwater Levels (cont.): Groundwater recharge occurs through percolation of rainfall, seepage from canals and the various sloughs and channels of the Kings River system to the west, and seepage of excess irrigation water. Average annual rainfall in this area totals over 4,500 acre-feet, which is substantially greater than the 118 acre-feet of runoff that would be retained for the Project (less than 1/3 of 1%). Only a small fraction of the runoff from the Project area reaches the alluvial basin. Therefore, retaining runoff from the Project would have a miniscule effect on the amount of groundwater recharge and no measurable effect on groundwater levels.

Hydrology (cont.) Groundwater Use During Dry Years and Impact on Groundwater Levels: Typically, approximately 85-90%, of water used for processing operations is conserved and recycled through a series of retention systems and/or flocculation tanks. During dry years, under worst-case conditions, groundwater may be needed to supply up to the 165 acre-feet of water needed for the Project. This volume of water is equivalent to the annual quantity needed to irrigate approximately 40 acres. As analyzed in the SB 610 Water Supply Assessment and EIR, groundwater levels in wells located in the area of the Project are not significantly affected during drought conditions. Additional pumping of groundwater during dry periods will not have any measurable effect on groundwater levels in the area.

Hydrology (cont.) Blasting Impacts on Wells and Canals: A threshold range of.5 in/sec (wells) and 5.0 in/sec to 20 in/sec (canals) of peak particle velocity is used for the protection of structures. EIR concluded the maximum particle velocity that would occur at the nearest groundwater well due to blasting would be approximately 0.15 inches per second (in/sec). This particle velocity is comparable to that caused by a person walking across the ground or the floor of a building. This maximum particle velocity is more than three times less than that which could potentially affect a well. Maximum particle velocity at the closest point along the Friant- Kern Canal to the mining area is approximately 1.07 in/sec. Almost 5 times less than could potentially affect a canal. Ground vibrations due to blasting will not be sufficient to damage the Friant-Kern Canal, or any other more-distant canals.

Hydrology (cont.) Central Valley Flood Protection Board: The Project Description does not include any disturbance within 300 feet of the Alta Main Canal. County has included a Condition of Approval for the Project specifying that if any disturbance or activities occur in either of these parcels, the Applicant must first contact the Central Valley Flood Protection Board to determine if an application for an encroachment permit should be filed.

Air Quality NOx Emission Sources and Impact Comparison: Project NOx emissions sources include diesel generators, on-site mobile equipment with diesel/gasoline engines, asphalt plant’s burner, and off-site mobile sources (i.e., diesel haul trucks). Final EIR determined under both a 1 million tons per year (“TPY”) and a 2 million TPY production scenario the Project’s NOx emissions would be significant. Reduced Alternative 4 will lead to fewer NOx impacts. Reducing annual production by 25 percent and the Project’s lifespan by 50 percent necessarily results in fewer on-site NOx emissions. Reduced Alternative 4 requires the use of electric conveyors rather than diesel haul trucks for removal of aggregate from the active mining area to the processing plant. To mitigate NOx the Final EIR requires the Applicant use state-of- the-art NOx reduction technology (e.g., engines meeting strict Tier 4 NOx emissions standards and an asphalt plant with a low NOx natural gas/propane burner).

Air Quality (cont.) PM Emissions Threshold: Current SJVAPCD standard requires compliance Regulation VIII. GAMAQI holds that compliance with Regulation VIII will render a project’s PM10 emissions less than significant. Therefore, the Final EIR uses the proper threshold and concludes PM10 emissions will be less than significant. SJVAPCD submitted a comment letter stating the Final EIR should use the agency’s informal 15 TPY PM standard. SJVAPCD has not formally adopted the 15 TPY standard therefore that threshold cannot be used as a generally applicable CEQA threshold. (See 14 Cal. Code Regs., § (b), (c)) If the 15 TPY informal standard were applicable, the Project’s PM10 and PM2.5 emissions would slightly exceed that threshold PM10 emissions would be minimized under Reduced Alternative 4. Air quality analysis submitted by te Applicant shows that Project PM10 emissions at the maximum proposed production of 1.5 million TPY would amount to about 11.3 tons.

Geology and Soils Core Samples: Core samples were recovered by the Applicant when they conducted a drilling program on the Project site. Portions of those core samples were analyzed for rock quality and chemistry. Data derived from these tests, where relevant, were provided as part of the Applicant’s CUP Application. In preparation of the EIR, the County peer reviewed those documents as it related to potential environmental impacts. The County determined, using their independent judgment, the data provided was sufficient to prepare a legally defensible EIR impact analysis. The County did not require, nor determine necessary, review of physical core samples.

Geology and Soils (cont.) Reduced Alternative 4 Slope Stability: Slopes designed at an overall slope of 1:1 (h:v) with interim slopes of 0.5:1 (h:v) incorporating: –Minimum bench width of 25 feet; –Maximum bench height of 50 feet; and –60 foot wide access road to quarry floor Proposed slope angle will be globally stable and suitable for the currently proposed post mining use of the Site (Slope Stability Report (Sept. 2011) p. 8) Post-mining land use, cattle grazing, is a feasible and allowed use –Cattle can, and do graze on steep slopes (See D.G. Ditsch, et al., Managing Steep Terrain for Livestock Forage Production, Univ. of Kentucky College of Agriculture (2006) p. 7) County has coordinated with Department of Conservation, Office of Mine Reclamation, in review of Applicant’s Reclamation Plan –As a result, three new Conditions of Approval requiring monitoring of active mine slopes have been required

QUESTIONS